Home / Browse projects / Thane, Maharashtra / BUILDING No 2 MAHALAKSHMI B WING
BUILDING No 2 MAHALAKSHMI B WING
By M/s. SAI BALAJI EMRALD REALTY
RG-MH-88507 · RERA P51700017127 · Last updated on MahaRERA portal: 28 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BUILDING No 2 MAHALAKSHMI B WING is a Residential / Group Housing project by M/s. SAI BALAJI EMRALD REALTY in Thane, Maharashtra, registered with MahaRERA as P51700017127 on 16 Jul 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 105 of the 168 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameBUILDING No 2 MAHALAKSHMI B WING
- TypeResidential / Group Housing
- Location
- KANCHANGAON
- DOMBIVLI
- Kalyan
- Thane
- 421201
- Pincode421201
- RERA no.P51700017127
- ReraGenie IDRG-MH-88507
Builder
- NameM/s. SAI BALAJI EMRALD REALTY
- Entity typePartnership
- PartnersAJAY RAMNARAYAN SINGH, ABHAY RADHARAMAN SINHA, VAIBHAV RADHARAMAN SHRIVASTAVA
- Authorized SignatorySANJAY RAMNARAYAN SINGH
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Jul 2018
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed137 files
Current status
Figures as on 28 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAHALAKSHMI B WING | NA | 26 | 26 | 168 | 0 | 168 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
MAHALAKSHMI B WING: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ASHOK GANPAT GAIKWAD | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MAHALAKSHMI B WING | NA | Rs 35.71 cr | Rs 35.71 cr |
| - | NA | Rs 35.25 lakh | Rs 35.25 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | STHAPATHYA NIRMAAN CIVIL AND ARCHITECTURAL SERVICES |
| Engineer | Shanti Consultant |
| Chartered Accountant | Kapure and Kapure Chartered Accountant |
| Chartered Accountant | Patel Patel & Co Chartered Accountant |
| Partner | Role in project |
|---|---|
| M/s. SAI BALAJI EMRALD REALTY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jun 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed137
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Mahalakshmi B Wing - Form 1 - DT 01-01-2026.pdf | 28 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Mahalahshmi Wing - B - Dt 23-01-2026.pdf | 28 Jan 2026 |
| Withdrawal Update Form 3File: Form - 3 Mahalakhmi B Wing Dt 31-12-2025.pdf | 28 Jan 2026 |
| Form 5 (FY 2024-2025)File: Mahalaxmi B Wing - Form 5 - Dt 30-09-2025.pdf | 22 Dec 2025 |
| Withdrawal Update Form 1File: Mahalakshmi Form 1 - Dt 01102025.pdf | 11 Dec 2025 |
| Withdrawal Update Form 2File: Mahalakshmi - Form - 2 DT - 03-10-2025.pdf | 11 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Mahalxmi B wing Sept 2025_compressed.pdf | 11 Dec 2025 |
| Withdrawal Update Form 1File: Mahalakshmo - B Wing Form 1 - Date -01-07-2025.pdf | 23 Aug 2025 |
| Withdrawal Update Form 2File: Mahalakshi - B Wing - Form 2 - Dt 31-07-2025.pdf | 23 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Mahalaxmi Bwing June 2025_compressed.pdf | 23 Aug 2025 |
| Form 1File: Form 1 - Mahalakshmi - B Wing - Dt 01-04-2025.pdf | 20 Jun 2025 |
| Form 2File: Form 2 - Mahalakshmi B Wing - Date 01-04-2025.pdf | 20 Jun 2025 |
| Form 3File: Form 3 Mahalaxmi B wing March 2025_compressed.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory disclosure Mahalaxmi B wing march 25.pdf | 20 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mahalakshmi - B Wing - Dt 01-04-2025.pdf | 30 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Mahalaxmi B wing March 2025_compressed.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mahalakshmi B Wing - Date 01-04-2025.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory disclosure Mahalaxmi B wing march 25_compressed.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Mahalaxmi B wing Dec 2024_compressed.pdf | 5 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mahalakshmi Wing - B Dt - 22-01-2025 .pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshmi B Wing - Form 1 - Dt 01-01-2025 .pdf | 24 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Maha B Wing Dec 24_compressed.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 mahalaxmi B wing 23 24.pdf | 25 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mahalaxmi B wing sept 24.pdf | 21 Dec 2024 |
| Certificates of CA (Form 3)File: Signed Form 3 of Mahalaxmi B wing Sept 2024.pdf | 11 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sept 2024.pdf | 11 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalaxmi B wing Form 1.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mahalakshmi B Wing - Form 2.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory of Mahalaxmi B wing June 2024.pdf | 30 Jul 2024 |
| Certificates of CA (Form 3)File: Mahalakshmi B Wing - Form 3 - Dt 30-06-2024_compressed.pdf | 30 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SBER B WING 2A MAR 24.pdf | 18 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mahalakshmi B Wing - Form 2 - Dt - 31052024.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory B WING Dec 2023_compressed.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Mahalaxmi B wing.pdf | 6 Jun 2024 |
| Certificates of CA (Form 3)File: Mahalaxmi Form 3 B wing March 2024_compressed.pdf | 6 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 - Mahalakshmi B Wing - Dt 01-04-2024.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshmi B Wing - Form 1 - Dt 01012024.pdf | 19 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mahalaxmi B wing Dec 23.pdf | 30 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mahalakshmi- B Wing - Form 2.pdf | 22 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mahalaxmi B wing sept 23.pdf | 22 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Mahlaxmi B wing June 23.pdf | 22 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Mahlaxmi B wing.pdf | 22 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 SBER B Wing_compressed.pdf | 22 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: From 5 Emrald B wing 2022 23.pdf | 28 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshmi B Wing- Form -1 - Dt - 01-07-2023.pdf | 13 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshmi B Wing- Form -1 - Dt - 01-01-2023.pdf | 3 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SBER B WING 2A MAR 21.pdf | 3 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SBER B WING 2A MAR 22.pdf | 3 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SBER B WING 2A MAR 23.pdf | 3 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mahalakshmi B wing - Form 2 -01012023_compressed.pdf | 27 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mahalakshmi B wing - Form 2 -01042023_compressed.pdf | 27 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshi B Wing - Form 1 - 01042022.pdf | 25 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SBER- FORM 1 - B WING 01-07-22.pdf | 25 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SBER- FORM 1 - B WING 01-10-22.pdf | 25 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshmi A Wing- Form -1 - Dt - 01-01-2023.pdf | 25 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshmi B Wing Form 3 - 31032023-1-6_compressed.pdf | 25 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshmi B Wing- Form -1 - Dt - 01-04-2023.pdf | 25 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalakshmi B Wing- Form -1 - Dt - 01-07-2023.pdf | 25 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SBER - Mahalaksmi B Wing Form 2 -01042022_compressed.pdf | 25 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SBER - Mahalaksmi B Wing Form 2 -01072022_compressed.pdf | 25 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SBER - Mahalaksmi B Wing Form 2 -01102022_compressed.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 Mahalaxmi B wing March 2022-1-6.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 Mahalaxmi B wing March 2022-7-12.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 Mahalaxmi B wing June 2022-1-6.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 Mahalaxmi B wing June 2022-7-12.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3Mahalaxmi B wing Sept 2022-1-6.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3Mahalaxmi B wing Sept 2022-7-12.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Mahalakshmi B Wing Form 3 - 31122022-1-6_compressed.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Mahalakshmi B Wing Form 3 - 31122022-7-12_compressed.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Mahalakshmi B Wing Form 3 - 31032023-1-6_compressed.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: Mahalakshmi B Wing Form 3 - 31032023-7-12_compressed.pdf | 25 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: MAHA B Wing 18-19_compressed.pdf | 28 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: MAHA B Wing 19-20_compressed.pdf | 28 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MAHA B Wing 20-21.pdf | 28 Feb 2023 |
| Declaration about Commencement CertificateFile: Mahalaxmi B Wing.pdf | 8 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- March 2019 Maha B wing.pdf | 8 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- June 2019 Maha B wing.pdf | 8 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- Sept 2019 Maha B wing.pdf | 8 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- Dec 2019 Maha B wing.pdf | 8 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- March 2020 Maha B wing.pdf | 8 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 137 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BUILDING No 2 MAHALAKSHMI B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANCHANGAON7,600+ in Thane
MY CITY PHASE II CLUSTER 5 PART II
HORIZON PROJECTS PVT LTD
MY CITY PHASE II CLUSTER 5 PART III
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 3 Bldg No 27-28
Runwal Residency Private Limited
Runwal Gardens Phase 4 Bldg No. 35-36
Runwal Residency Private Limited
VASTU LUXURIA
LAUKIK DEVELOPMENT CORPORATION
KAPLESHWARA RESIDENCY
KAPLESHWARA HOMES LLP
See every Thane project, with the district possession charts
Builder: M/s. SAI BALAJI EMRALD REALTY
M/s. SAI BALAJI EMRALD REALTY has 3 registrations on MahaRERA, including BUILDING No 1 PADMAVATI and BUILDING No 2 MAHALAKSHMI B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that BUILDING No 2 MAHALAKSHMI B WING shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BUILDING No 2 MAHALAKSHMI B WING is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BUILDING No 2 MAHALAKSHMI B WING?
The registered promoter entity is M/s. SAI BALAJI EMRALD REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BUILDING No 2 MAHALAKSHMI B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BUILDING No 2 MAHALAKSHMI B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BUILDING No 2 MAHALAKSHMI B WING?
The professionals named in the filing: Architect: STHAPATHYA NIRMAAN CIVIL AND ARCHITECTURAL SERVICES; Engineer: Shanti Consultant; Chartered Accountant: Kapure and Kapure Chartered Accountant; Chartered Accountant: Patel Patel & Co Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BUILDING No 2 MAHALAKSHMI B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback