Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
10 of 66Construction stages doneacross 6 buildings; furthest along: Plinth, 60%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

BRAHMA PARK is a Residential / Group Housing project by PANCHSHIL DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500078792 on 13 Jan 2025. Possession is promised by 31 Dec 2029.

At a glance

Project

  • NameBRAHMA PARK
  • TypeResidential / Group Housing
  • Location
    • GUT NO 219
    • SATARA PARISAR
    • Satara (CT)
    • Aurangabad
    • 431002
  • Pincode431002
  • RERA no.P51500078792
  • ReraGenie IDRG-MH-23480

Builder

  • NamePANCHSHIL DEVELOPERS
  • Entity typePartnership
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings6 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK F ROW HOUSENA10000
BLOCK E ROW HOUSENA10000
BLOCK -D ROW HOUSENA10000
BLOCK -C Row HouseNA10000
BLOCK - BNA80000
BLOCK - ANA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 18 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Plinth, at 60%.

BLOCK F ROW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK E ROW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK -D ROW HOUSE35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth60%
Stilt Floor60%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK -C Row House68%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
BLOCK - B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK - A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed172

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots172
Closed/Covered60
Open Space112
BuildingClosed/CoveredOpen SpaceTotal
BLOCK F ROW HOUSE099
BLOCK E ROW HOUSE8816
BLOCK -D ROW HOUSE202040
BLOCK -C Row House01515
BLOCK - B163046
BLOCK - A163046

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,037 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2025

Approvals and building plan

Sanctioning authorityaurangabad munciple corporation
Permissible FSI6109.71
Proposed, not sanctioned6,110 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Radhika Guest House, Near Fame Tapadiya, Town Center Cidco, Aurangabad Aurangabad Dist., Maharashtra.431003

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered Accountantpankaj dawalkar
PartnerRole in project
PANCHSHIL DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 (31-3-25).pdf18 Jun 2025
Form 2File: from 2 (31-3-25).pdf18 Jun 2025
Form 3File: from 3(31-3-25).pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: developers (31-3-25).pdf18 Jun 2025
Form 5 (FY 2024-2025)File: from 5 (31-3-25).pdf18 Jun 2025
Declaration in FORM BFile: form B.pdf25 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A BANK.pdf25 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: bank format B.pdf25 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: 01-09_high.pdf21 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Gmail - 62 01 SANTION BP POROPSAL 13122024.pdf13 Dec 2024
Other - LegalFile: ann a declaration cum undertaking.pdf13 Dec 2024
Other - LegalFile: SALE DEED 1.pdf13 Dec 2024
Other - LegalFile: Sale Deed Panchshil Developers.pdf13 Dec 2024
Other - LegalFile: 219__सातारा__छत्रपती संभाजीनगर.pdf13 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF LOAN.pdf13 Dec 2024
Building plan approvalFile: NA ORDER.pdf6 Dec 2024
Layout approvalFile: 09-09.pdf6 Dec 2024
Layout approvalFile: 08-09_compressed.pdf6 Dec 2024
Layout approvalFile: 07-09_compressed.pdf6 Dec 2024
Layout approvalFile: 06-09.pdf6 Dec 2024
Layout approvalFile: 05-09.pdf6 Dec 2024
Layout approvalFile: 04-09.pdf6 Dec 2024
Layout approvalFile: 03-09.pdf6 Dec 2024
Layout approvalFile: 02-09.pdf6 Dec 2024
Layout approvalFile: 01-09.pdf6 Dec 2024
PAN CardFile: PAN CARD.pdf6 Dec 2024
Copy of the legal title reportFile: SEAR4CH REPORT_compressed.pdf6 Dec 2024
Copy of the legal title reportFile: certificate OF LEGAL.pdf6 Dec 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances Concerned to legal.pdf6 Dec 2024
Details of encumbrances concerned to FinanceFile: No encrumbrance certificate.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 05-09.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 09-09.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 08-09_compressed.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 07-09_compressed.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 06-09.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 04-09.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 03-09.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 02-09.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: 01-09.pdf6 Dec 2024
Proforma of Allotment letterFile: Final Allotment letter (1) (1).pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate_compressed.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf6 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf6 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf6 Dec 2024
CERSAI detailsFile: Certificate c RESAI.pdf6 Dec 2024
CERSAI detailsFile: Asset Based Search.pdf6 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to allotment letter.pdf6 Dec 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances Concerned to legal.pdf6 Dec 2024
Details of encumbrances concerned to LegalFile: No encrumbrance certificate.pdf6 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report with respect to model copy of agreement.pdf6 Dec 2024
Proforma of Agreement for saleFile: FINAL ATS.pdf6 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexture A DISCLOSEUR EOF INTEREST.pdf6 Dec 2024

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep BRAHMA PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATARA PARISAR1,400+ in Aurangabad

Builder: PANCHSHIL DEVELOPERS

PANCHSHIL DEVELOPERS has 2 registrations on MahaRERA, including JIJAU RESIDENCY and BRAHMA PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if BRAHMA PARK is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BRAHMA PARK?

The registered promoter entity is PANCHSHIL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BRAHMA PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BRAHMA PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BRAHMA PARK?

The professionals named in the filing: Chartered Accountant: pankaj dawalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BRAHMA PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BRAHMA PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BRAHMA PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.