Completed No litigation declared Residential / Group Housing project

Blue Dice

By DHANRAJ KESARIMAL SONIGARA

RG-MH-01453 · RERA P52100004228 · Last updated on MahaRERA portal: 8 Oct 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2022Possession promisedregistration recorded completed
23 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 70%
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Blue Dice is a Residential / Group Housing project by DHANRAJ KESARIMAL SONIGARA in Pune, Maharashtra, registered with MahaRERA as P52100004228 on 9 Aug 2017. The registration is recorded completed; possession was promised by 14 Jan 2022. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameBlue Dice
  • TypeResidential / Group Housing
  • Location
    • Chikhali Bk.
    • Mulshi
    • Pune
    • 411062
  • Pincode411062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004228
  • ReraGenie IDRG-MH-01453

Builder

  • NameDHANRAJ KESARIMAL SONIGARA
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2017First promiseJan 2020Revised toJan 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion14 Jan 2022
  • Revised completionRevised to 14 Jan 2022 (originally 14 Jan 2020)
  • Buildings3 building records
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D-1NA130000
D-2NA130000
D-3NA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 70%.

D-191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D-291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D-336%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities20

As on 8 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes50%
Street LightingYes75%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes75%
Open ParkingYes50%
Solar SystemYes75%
INTERCOM SYSTEMYes75%
InvertorYes60%
CCTV CAMERAYes75%
WATER PURIFIREYes60%

Parking filed189

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots189
Closed/Covered60
Open Space129
BuildingClosed/CoveredOpen SpaceTotal
D-1225173
D-2225173
D-3162743

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,891 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10285.51
Proposed, not sanctioned7,925 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOswal Bandhu Samaj Building , Shankarseth Road,

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRishikayash Anil Bhutkar
EngineerRahul Ramesh Kapse
PartnerRole in project
DHANRAJ KESARIMAL SONIGARA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005492Jan 2020 → Jan 2021

Reason as filed by the promoterWaiting For The Part Completion Certificate From PCMC

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Oct 2022

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 ARCHITECT CERTIFICATE compressed.pdf8 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 ABLUE DICE BUILDING D3 compressed.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: D K Associates 4th Rera Submission Working-compressed.pdf31 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: D K Associates 4th Rera Submission Working-compressed.pdf31 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A Engineers Certificate For Quality Assurance -1-compressed.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A Engineers Certificate For Quality Assurance -1-compressed.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate For D Build-compressed.pdf28 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE D3-compressed.pdf27 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECT CERTIFICATE D2-compressed.pdf27 Jul 2021
Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE.pdf26 Jul 2021
Disclosure of sold/ booked inventoryFile: DECLARATION OF COMMENCEMENT CERTIFICATE.pdf26 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Blue Dice D-1 Society Formation Certificate_compressed.pdf21 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Blue Dice D-2 Society Formation Certificate_compressed.pdf21 Jul 2021
Details of Restarting of Construction work post lockdownFile: extention letter.pdf19 Jul 2021
Details of Restarting of Construction work post lockdownFile: extention 1.pdf19 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Certificate Blue Dice_compressed.pdf16 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: New Commencement Certificate 18-7-19 Chikhali_compressed.pdf15 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Certificate 31-12-19 blue Dice_compressed.pdf15 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Foe Rera 3rd Submission_compressed (1).pdf14 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate 31-12-19_compressed.pdf14 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA Certificate Blue Dice_compressed.pdf14 Jan 2020
Layout approvalFile: 01.pdf22 Jan 2019
Layout approvalFile: 02.pdf22 Jan 2019
Layout approvalFile: 03.pdf22 Jan 2019
Layout approvalFile: 04.pdf22 Jan 2019
Building plan approvalFile: 5.pdf22 Jan 2019
Building plan approvalFile: 6.pdf22 Jan 2019
Building plan approvalFile: 7.pdf22 Jan 2019
Building plan approvalFile: 8.pdf22 Jan 2019
Building plan approvalFile: 9.pdf22 Jan 2019
Building plan approvalFile: 10.pdf22 Jan 2019
Building plan approvalFile: 11.pdf22 Jan 2019
Building plan approvalFile: 12.pdf22 Jan 2019
Building plan approvalFile: 13.pdf22 Jan 2019
Building plan approvalFile: 10.pdf22 Jan 2019
Copy of the legal title reportFile: compresspdf dk search report 2018.pdf22 Jan 2019
Copy of Layout Approval (in case of layout)File: 01.pdf22 Jan 2019
Copy of Layout Approval (in case of layout)File: 02.pdf22 Jan 2019
Copy of Layout Approval (in case of layout)File: 03.pdf22 Jan 2019
Copy of Layout Approval (in case of layout)File: 04.pdf22 Jan 2019
Building Plan Approval (IOD)File: 5.pdf22 Jan 2019
Building Plan Approval (IOD)File: 6.pdf22 Jan 2019
Building Plan Approval (IOD)File: 7.pdf22 Jan 2019
Building Plan Approval (IOD)File: 8.pdf22 Jan 2019
Building Plan Approval (IOD)File: 9.pdf22 Jan 2019
Building Plan Approval (IOD)File: 10.pdf22 Jan 2019
Building Plan Approval (IOD)File: 10.pdf22 Jan 2019
Building Plan Approval (IOD)File: 11.pdf22 Jan 2019
Building Plan Approval (IOD)File: 12.pdf22 Jan 2019
Building Plan Approval (IOD)File: 13.pdf22 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: compresspdf_commencment 2017.pdf22 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: compresspdf_order 2017.pdf22 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: compresspdf_commencment 2017.pdf22 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: compresspdf_commencment 2017.pdf22 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BLUE DICE ENGINEER CERTIFICAT.pdf31 Jul 2017
Certificates of CA (Form 3)File: BLUE DICE CA CERTIFICATE .pdf31 Jul 2017
Declaration in FORM BFile: Blue Dice D1 to D3.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE FOR BLUE DICE BUILDING D2.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE FOR BLUE DICE BUILDING D3.pdf29 Jul 2017
Proforma of Allotment letterFile: Allotment letter Blue Dice final.pdf29 Jul 2017
Proforma of Allotment letterFile: BLUE DICE RERA DRAFT.pdf29 Jul 2017
Certificates of Architect (Form 4)File: FORM 4 ARCHITECT CERTIFICATE FOR BLUE DICE .pdf29 Jul 2017
Details of encumbrancesFile: Encumbrance Letter Blue Dice.pdf28 Jul 2017
Copy of the legal title reportFile: Chikhali Search Report 2016.pdf15 Jul 2017
Layout approvalFile: 01 Layout Plan of Amalgamation Subdivision.pdf14 Jul 2017
Layout approvalFile: 02 Layout Plan of Amalgamation Subdivision.pdf14 Jul 2017
Building plan approvalFile: 01 Layout Plan.pdf14 Jul 2017
Building plan approvalFile: 02 Parking Floor Plan.pdf14 Jul 2017
Building plan approvalFile: 03 First Floor Plan.pdf14 Jul 2017
Building plan approvalFile: 04 Typical 2nd 4th 6th 10th Floor Plan.pdf14 Jul 2017
Building plan approvalFile: 05 Typical 3rd 5th 7th 9th Floor Plan.pdf14 Jul 2017
Building plan approvalFile: 06 Eighth Floor Plan.pdf14 Jul 2017
Building plan approvalFile: 07 Eleventh Floor Plan.pdf14 Jul 2017
Building plan approvalFile: 08 Terrace Floor Plan.pdf14 Jul 2017
PAN CardFile: pan.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: 01 Layout Plan of Amalgamation Subdivision.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: 02 Layout Plan of Amalgamation Subdivision.pdf14 Jul 2017
Building Plan Approval (IOD)File: 01 Layout Plan.pdf14 Jul 2017
Building Plan Approval (IOD)File: 02 Parking Floor Plan.pdf14 Jul 2017
Building Plan Approval (IOD)File: 03 First Floor Plan.pdf14 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Blue Dice on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikhali Bk.13,700+ in Pune

2 kmBlue DiceCompleted 48Lapsed / revoked 33Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: DHANRAJ KESARIMAL SONIGARA

DHANRAJ KESARIMAL SONIGARA has 2 registrations on MahaRERA, including Blue Dice and Sonigara Excluzee. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Blue Dice is delayed beyond 14 Jan 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Blue Dice?

The registered promoter entity is DHANRAJ KESARIMAL SONIGARA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Blue Dice?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Blue Dice?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Blue Dice?

The professionals named in the filing: Architect: Rishikayash Anil Bhutkar; Engineer: Rahul Ramesh Kapse. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Blue Dice?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Blue Dice. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Blue Dice to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.