Home / Browse projects / Raigarh, Maharashtra / BLISS SOLITAIRE APARTMENT

Registered No litigation declared Others project

BLISS SOLITAIRE APARTMENT

By AHAMEDSHARIEF LALUSAHEB SAYED

RG-MH-18875 · RERA P52000077816 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 15 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 95%
33 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

BLISS SOLITAIRE APARTMENT is a Others project by AHAMEDSHARIEF LALUSAHEB SAYED in Raigarh, Maharashtra, registered with MahaRERA as P52000077816 on 7 Nov 2024. Possession is promised by 30 Jun 2027. The completion date has moved by 15 months from the original filing. 27 of the 60 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameBLISS SOLITAIRE APARTMENT
  • TypeOthers
  • Location
    • NERAL
    • DHAMOTE PHATA
    • Dhamote
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000077816
  • ReraGenie IDRG-MH-18875

Builder

  • NameAHAMEDSHARIEF LALUSAHEB SAYED
  • Entity typeIndividual

Key dates

this monthRegisteredNov 2024First promiseMar 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2024
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed69 files

Current status

45%27 of 60 units booked
77.0%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLISS SOLITAIRENA55431760

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

BLISS SOLITAIRE: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Open Space30

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,600 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 May 2025

Approvals and building plan

Sanctioning authorityRaigad Zilla Parishad Alibag
Permissible FSI2044.88
Proposed, not sanctioned2,045 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIDBI BUILDING, 'PLOT NO 39/40/41, SECTOR 11, CBD- BELAPUR, 'NAVI-MUMBAI- 400614 , MAHARASHTRA
Estimated costRs 5.00 cr
Cost incurredRs 3.85 cr
Work done77.0%
BuildingWingEstimatedIncurred
BLISS SOLITAIRENARs 5.00 crRs 3.85 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectELEVATION DESIGNERS AND PLANNERS PVT LTD
EngineerVASTUKALP
EngineerSiddhi Associates
Chartered AccountantM B PONKSHE & CO
Chartered AccountantS V D & Co.
PartnerRole in project
AHAMEDSHARIEF LALUSAHEB SAYED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07072501964Mar 2026 → Jun 2027

Reason as filed by the promoterI, Mr. Ahamedsharief Lalusaheb Sayed, hereby submit this explanatory note in my capacity as the promoter of the project “Bliss Solitaire Apartment” bearing registration number P52000077816, registered under MahaRERA. We would like to bring to your kind notice the following points regarding the status and the reasons for seeking an extension for the completion of our project: 1. Current Status: o We have successfully completed approximately 80% of the RCC work for the project. o The remaining civil, finishing, and MEP works are planned and shall be executed as per the revised schedule. 2. Reaso

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 June 2026 Final.pdf6 Jul 2026
Withdrawal Update Form 2File: Form 2 June 2026 Final.pdf6 Jul 2026
Withdrawal Update Form 3File: Form 3 04072026.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1 Date 31 03 2026 Final.pdf7 Apr 2026
Withdrawal Update Form 2File: Form 2 Date 31 03 2026 Final.pdf7 Apr 2026
Withdrawal Update Form 3File: Form 3 Date 04 04 2026 Final.pdf7 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 as on December 2025.pdf4 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 as on December 2025.pdf4 Jan 2026
Withdrawal Update Form 3File: Form 3 03 - 01 -2026.pdf4 Jan 2026
Withdrawal Update Form 1File: Form 1 September 2025.pdf5 Oct 2025
Withdrawal Update Form 2File: Form 2 for September 2025.pdf5 Oct 2025
Withdrawal Update Form 3File: Form 3 for September 2025.pdf5 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 June 2025.pdf7 Jul 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 June 2025.pdf7 Jul 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 June 2025.pdf7 Jul 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 June 2025.pdf7 Jul 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 June 2025.pdf7 Jul 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 June 2025.pdf7 Jul 2025
Withdrawal Update Form 3File: From 3 for June 2025.pdf7 Jul 2025
Withdrawal Update Form 3File: From 3 for June 2025.pdf7 Jul 2025
Withdrawal Update Form 3File: From 3 for June 2025.pdf7 Jul 2025
Form 1File: From 1 Date 31-12-2024.pdf24 May 2025
Form 2File: Form 2 Date 31-12-2024.pdf24 May 2025
Form 3File: From 3 Date 31-12-2024.pdf24 May 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 31-12-2024.pdf24 May 2025
Form 1File: From 1 Date 03-05-2025.pdf24 May 2025
Form 2File: Form 2 Date 09-05-2025.pdf24 May 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 31-03-2025.pdf24 May 2025
Form 3File: From 3 Date 09-05-2025_organized.pdf24 May 2025
Form 2A (FY 2024-2025)File: Assurance Certificate Form 2A.pdf24 May 2025
Form 5 (FY 2024-2025)File: Form 5 (2).pdf24 May 2025
Other - LegalFile: DOC 5228-2017 SALE DEED_11zon.pdf23 Oct 2024
Other - LegalFile: DOC 3195-2024 DEED OF CANCELLATION_11zon.pdf23 Oct 2024
Other - LegalFile: DOC 3824-2024 DEED OF CANCELLATION_11zon.pdf23 Oct 2024
Other - LegalFile: धामोते_71_2_Satbara (1).pdf23 Oct 2024
Other - FinanceFile: C A CERTIFICATE NEw.pdf23 Oct 2024
Other - TechnicalFile: Order 50.pdf23 Oct 2024
Building plan approvalFile: layout Plan 2_11zon.pdf16 Oct 2024
Building plan approvalFile: layout Plan 1_11zon.pdf16 Oct 2024
Layout approvalFile: layout Plan 2_11zon.pdf16 Oct 2024
Layout approvalFile: layout Plan 1_11zon.pdf16 Oct 2024
Copy of the legal title reportFile: Title Report.pdf16 Oct 2024
Details of encumbrances concerned to FinanceFile: NO FINANACIAL ENCUMBRANCES CERTIFICATES.pdf16 Oct 2024
Copy of Layout Approval (in case of layout)File: layout Plan 1_11zon.pdf16 Oct 2024
Copy of Layout Approval (in case of layout)File: layout Plan 2_11zon.pdf16 Oct 2024
Proforma of Allotment letterFile: Allotment Letter.pdf16 Oct 2024
Declaration in FORM BFile: Affidavit_11zon.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER’S CERTIFICATE.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Extension of order.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: layout Plan 1_11zon.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: layout Plan 2_11zon.pdf16 Oct 2024
Other - LegalFile: DOC 4403-2017 PURCHASE SALE DEED_11zon.pdf16 Oct 2024
CERSAI detailsFile: No security intrest.pdf16 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account.pdf16 Oct 2024
Details of encumbrances concerned to LegalFile: NO FINANACIAL ENCUMBRANCES CERTIFICATES.pdf16 Oct 2024
Proforma of Agreement for saleFile: AFS.pdf16 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Release Deed 71-2.pdf11 Aug 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CERTIFICATE.pdf4 Aug 2024
Declaration about Commencement CertificateFile: declaration about commecement certificate 2.pdf4 Aug 2024
Deviation Report with respect to Allotment letterFile: deviation report with respect to Allotment leetter 9.pdf4 Aug 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CERTIFICATE.pdf4 Aug 2024
Deviation Report with respect to model copy of AgreementFile: deviation report with respect to model copy off Agreement.pdf4 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organizations 5.pdf4 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for securd - unsevured finance availed for the projet 3.pdf4 Aug 2024
PAN CardFile: Pan Card.pdf1 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Oder Copy.pdf1 Aug 2024

How this compares with Raigarh

45%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 15 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BLISS SOLITAIRE APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAMOTE PHATA5,900+ in Raigarh

2 kmBLISS SOLITAIRE APARTMENCompleted 17Lapsed / revoked 18Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: AHAMEDSHARIEF LALUSAHEB SAYED

AHAMEDSHARIEF LALUSAHEB SAYED has 1 registration on MahaRERA, including BLISS SOLITAIRE APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if BLISS SOLITAIRE APARTMENT is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BLISS SOLITAIRE APARTMENT?

The registered promoter entity is AHAMEDSHARIEF LALUSAHEB SAYED, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BLISS SOLITAIRE APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BLISS SOLITAIRE APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BLISS SOLITAIRE APARTMENT?

The professionals named in the filing: Architect: ELEVATION DESIGNERS AND PLANNERS PVT LTD; Engineer: VASTUKALP; Engineer: Siddhi Associates; Chartered Accountant: M B PONKSHE & CO; Chartered Accountant: S V D & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BLISS SOLITAIRE APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BLISS SOLITAIRE APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BLISS SOLITAIRE APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.