ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / BKC 9

Registered No litigation declared Residential / Group Housing project

BKC 9

By Vakratunda Buildcon Private Limited

RG-MH-07654 · RERA P51800054573 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 91%
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

BKC 9 is a Residential / Group Housing project by Vakratunda Buildcon Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054573 on 31 Jan 2024. Possession is promised by 31 Jul 2028.

At a glance

Project

  • NameBKC 9
  • TypeResidential / Group Housing
  • Location
    • Near Western Express Highway
    • Kher Nagar
    • Bandra East
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • RERA no.P51800054573
  • ReraGenie IDRG-MH-07654

Builder

  • NameVakratunda Buildcon Private Limited
  • Entity typeCompany
  • DirectorsAjay Kishore Sharma, Manish Karsandas Kapadia, Nirav Bhupendra Dalal, Saureen Bharat Desai, Anjana Ram Makhecha, Ram Kantilal Makhecha
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2024PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2024
  • Promised completion31 Jul 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed106 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 9- A Wing and B WingNA2218000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 91%.

Building No 9- A Wing and B Wing: 26% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)91%
Podiums (if any)0%
Plinth91%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Covered Pit and Puzzle ParkingYes0%

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered133

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,647 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Khernagar Bhagyodaya Co-Op Housing Society LimitedBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI10900.0
Proposed, not sanctioned8,933 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Manekji Wadia Building, Nanik Motwane Marg, Mumbai- 400001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s Shilp Associates
EngineerMr. Ambadas Kharatmol
EngineerRahul Singh
Chartered AccountantB R Nagda & Co.
Chartered AccountantHarshad Doshi & Co
PartnerRole in project
Vakratunda Buildcon Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form5_BKC9.pdf10 Jul 2026
Form 2A (FY 2025-2026)File: BKC9_Quality Certificate_RERA_Mar26.pdf29 Jun 2026
Form 2A (FY 2024-2025)File: BKC 9- Form 2A- FY 24-25.pdf23 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: BKC 9- Further CC.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: BKC 9- Inventory Report- March 31, 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BKC 9- Form 3- Sept 2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BKC 9- Form 2- Sept 2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BKC 9- PPR- Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BKC 9- Form 1- Dec 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BKC 9- Form 3- June 2024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: BKC 9- Inventory Report- 31 Dec 2024_signed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BKC 9- Form 2- June 2024.pdf13 Dec 2024
Disclosure of sold/ booked inventoryFile: BKC 9- Inventory Report- Sept 2024.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202403 RERA Certificate BKC 9 - RERA_signed.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BKC 9 - Architect Certificate June 24.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BKC 9- Physical Progress- June 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BKC 9- Form 1- Sept 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BKC 9- Physical Progress- Sept 2024.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: BKC 9- Form 5- FY 2023-24.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Sales Update BKC 9 as on 30 June 2024.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: BKC 9- Form 2A- FY 2023-24_signed.pdf5 Jun 2024
Building plan approvalFile: Amended IOA Letter- 26 Apr 2024.pdf10 May 2024
Building plan approvalFile: Amended IOA Plans_01.pdf10 May 2024
Building plan approvalFile: Amended IOA Plans_02.pdf10 May 2024
Building plan approvalFile: Amended IOA Plans_03.pdf10 May 2024
Building plan approvalFile: Amended IOA Plans_04.pdf10 May 2024
Building plan approvalFile: Amended IOA Plans_05.pdf10 May 2024
Building plan approvalFile: Amended IOA Plans_06.pdf10 May 2024
Building plan approvalFile: Amended IOA Plans_07.pdf10 May 2024
Building plan approvalFile: Amended IOA Plans_08.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Letter- 26 Apr 2024.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Plans_01.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Plans_02.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Plans_03.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Plans_04.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Plans_05.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Plans_06.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Plans_07.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Plans_08.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BKC 9-No Progress Declaration- Mar'24.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BKC 9-No Progress Declaration- Mar'24.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sales Update BKC 9 as on 31 Mar 2024.pdf19 Apr 2024
Building plan approvalFile: 15 Building Plan Approval _ NA Order for plotted development (3).pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 15 Building Plan Approval _ NA Order for plotted development (3).pdf18 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS- Part 2.pdf18 Jan 2024
Other - LegalFile: ilovepdf_merged (60).pdf18 Jan 2024
Other - FinanceFile: 2 Copy of the legal title report (10).pdf18 Jan 2024
Other - TechnicalFile: Bldg No 9 Kher Nagar Bhagyodaya CHSL.pdf18 Jan 2024
Other - TechnicalFile: Declaration for Apartment Details_signed (1).pdf18 Jan 2024
Layout approvalFile: BKC 9999999_11zon (1).pdf17 Jan 2024
Building plan approvalFile: BKC 9 - IOA Letter - 9th Nov 2023_11zon (1).pdf17 Jan 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (9).pdf17 Jan 2024
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (10).pdf17 Jan 2024
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development (8).pdf17 Jan 2024
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (5).pdf17 Jan 2024
Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development (6).pdf17 Jan 2024
Building plan approvalFile: 6 Building Plan Approval _ NA Order for plotted development (5).pdf17 Jan 2024
Building plan approvalFile: 7 Building Plan Approval _ NA Order for plotted development (5).pdf17 Jan 2024
Building plan approvalFile: 8 Building Plan Approval _ NA Order for plotted development (5).pdf17 Jan 2024
Building plan approvalFile: 9 Building Plan Approval _ NA Order for plotted development (4).pdf17 Jan 2024
Building plan approvalFile: 10 Building Plan Approval _ NA Order for plotted development (5).pdf17 Jan 2024
Building plan approvalFile: 11 Building Plan Approval _ NA Order for plotted development (4).pdf17 Jan 2024
Building plan approvalFile: 12 Building Plan Approval _ NA Order for plotted development (3).pdf17 Jan 2024
Building plan approvalFile: 13 Building Plan Approval _ NA Order for plotted development (3).pdf17 Jan 2024
Building plan approvalFile: 14 Building Plan Approval _ NA Order for plotted development (3).pdf17 Jan 2024
PAN CardFile: 1 PAN Card (16).pdf17 Jan 2024
Copy of the legal title reportFile: Scanned Title Report- Revised-11zon.pdf17 Jan 2024
Copy of the legal title reportFile: BKC 9- Survey Nos Declaration_signed (1).pdf17 Jan 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (19).pdf17 Jan 2024
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal (12).pdf17 Jan 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (19).pdf17 Jan 2024
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal (12).pdf17 Jan 2024
Copy of Layout Approval (in case of layout)File: BKC 9999999_11zon (1).pdf17 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: BKC 9 - IOA Letter - 9th Nov 2023_11zon (1).pdf17 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (9).pdf17 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development (10).pdf17 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development (8).pdf17 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (5).pdf17 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval _ NA Order for plotted development (6).pdf17 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval _ NA Order for plotted development (5).pdf17 Jan 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BKC 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kher Nagar, Bandra East6,700+ in Mumbai Suburban

Builder: Vakratunda Buildcon Private Limited

Vakratunda Buildcon Private Limited has 2 registrations on MahaRERA, including BKC 28 and BKC 9. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if BKC 9 is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BKC 9?

The registered promoter entity is Vakratunda Buildcon Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BKC 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BKC 9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BKC 9?

The professionals named in the filing: Architect: M/s Shilp Associates; Engineer: Mr. Ambadas Kharatmol; Engineer: Rahul Singh; Chartered Accountant: B R Nagda & Co.; Chartered Accountant: Harshad Doshi & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BKC 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BKC 9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BKC 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.