Registration lapsed No litigation declared Residential / Group Housing project

PRESIDENTIA

By YELLOWSTONE SKYSCRAPERS LLP

RG-MH-21485 · RERA P52100029808 · Last updated on MahaRERA portal: 20 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
30 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 96%
53 of 200Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

PRESIDENTIA is a Residential / Group Housing project by YELLOWSTONE SKYSCRAPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100029808 on 4 Jul 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 147 of the 200 units on this registration are recorded sold or booked, and 30 of 33 construction stages are filed complete.

At a glance

Project

  • NamePRESIDENTIA
  • TypeResidential / Group Housing
  • Location
    • S NO 67A/6A VILLAGE GHORPADI
    • B T KAWADE ROAD TAL- PUNE CITY PUNE
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411001
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029808
  • ReraGenie IDRG-MH-21485

Builder

  • NameYELLOWSTONE SKYSCRAPERS LLP
  • Entity typePartnership
  • PartnerVINEET GOYAL
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredJul 2021PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Jul 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed63 files

Current status

74%147 of 200 units booked
99.5%Work done, per cost certificate

Figures as on 20 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER CNA201766066
TOWER DNA201766066
TOWER ENA201768068

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 96%.

TOWER C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%
TOWER D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%
TOWER E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities15

As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered37
Open Space60
BuildingClosed/CoveredOpen SpaceTotal
TOWER C12526
TOWER D181735
TOWER E181836

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area19,730 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025
LandownerVillageDistrict
THE KINGS WAY AOPPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI18954.45
Proposed, not sanctioned18,954 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR PLOT NO 421/A GOKHALE ROAD NR SYMBIOSIS ATUR CENTRE ASHOKNAGAR PUNE 411016
Estimated costRs 66.00 cr
Cost incurredRs 65.69 cr
Work done99.53%
BuildingWingEstimatedIncurred
TOWER CNARs 20.67 crRs 21.08 cr
TOWER DNARs 20.67 crRs 21.08 cr
TOWER ENARs 20.67 crRs 21.08 cr
-NARs 4.00 crRs 2.45 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK A ARCHITECTURE
EngineerPLANEDGE CONSULTANTS P LTD
Chartered AccountantBHANDARI S A A J & ASSOCIATES
Chartered AccountantVINOD N NIKAM & CO
Chartered AccountantJAYESH N JAIN & ASSOCIATES
PartnerRole in project
YELLOWSTONE SKYSCRAPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Nov 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_PRESIDENTIA.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 02_Presidentia.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 03_Presidentia.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A_Presidentia.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: Form 05_Presidentia.pdf7 Nov 2025
Withdrawal Update Form 1File: FORM 1- PRESIDENTIA.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 02_Presedentia.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 03_Presidentia.pdf20 Oct 2025
Withdrawal Update Form 1File: Presidentia.pdf24 Jul 2025
Withdrawal Update Form 2File: Form 02_Presidentia.pdf24 Jul 2025
Withdrawal Update Form 3File: Form 03_Presidentia.pdf24 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02_Presidentia.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03_Presidentia.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K PRESIDENTIA.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_PRESIDENTIA.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_PRESIDENTIA.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Presidentiaa.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_PRESIDENTIA.pdf3 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PRESIDENTIA - PART OC - CDE BLDG.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Presidentia.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Presidentia.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Presidentia.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Presidentia.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-01 Q1 FY 24-25 PRESIDETIA.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 Q1 FY 24-25 PRESIDETIA.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 Q1 FY 24-25 PRESIDENTIA.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 Q1 FY 24-25 PRESIDENTI.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PRESIDENTIA.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PRESIDENTIA.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Presidentia.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pressidentia.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Presidentia_compressed.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Presidentia.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Presidnetia.pdf10 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Presidnetia.pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 230630- Presidentia.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20230710_Form 2_Presidentia.pdf22 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 Presidentia.PDF22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: kohinoor presidentia date-14-01-23.pdf12 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: presidentia.pdf12 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: presidentia.pdf12 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: presidentia_compressed.pdf12 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Presidentia.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Presidentia.pdf30 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Presidentia.pdf16 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Presidentia-Form 2A_Dec-2021.pdf4 Jan 2022
Copy of the legal title reportFile: TSR_BTK revised_compressed.pdf28 Jun 2021
Layout approvalFile: Sanctioned layout_BTK.pdf19 Jun 2021
Layout approvalFile: IOD_BTK.pdf19 Jun 2021
Copy of the legal title reportFile: TSR_BTK.pdf19 Jun 2021
Details of encumbrancesFile: No eumbrance cert.pdf19 Jun 2021
Copy of Layout Approval (in case of layout)File: Sanctioned layout_BTK.pdf19 Jun 2021
Copy of Layout Approval (in case of layout)File: IOD_BTK.pdf19 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_BTK.pdf19 Jun 2021
Declaration about Commencement CertificateFile: Declaration_BTK.pdf19 Jun 2021
Declaration in FORM BFile: FormB_YSLLP.pdf19 Jun 2021
Proforma of Allotment letterFile: agreementto sell.pdf19 Jun 2021
Building plan approvalFile: NAOrderGhorpadiSno67A7A.pdf18 Jun 2021
PAN CardFile: PAN_Yellowstone Skyscrapers LLP.pdf18 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: NAOrderGhorpadiSno67A7A.pdf18 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 - RERA Certificate_compressed (1).pdf18 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20210614_Form 2_Presidentiaph I.pdf18 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YSSLLP BTK Form 03 Dated 160621.PDF18 Jun 2021

How this compares with Pune

74%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRESIDENTIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near B T KAWADE ROAD TAL- PUNE CITY PUNE13,700+ in Pune

2 kmPRESIDENTIACompleted 20Lapsed / revoked 5Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: YELLOWSTONE SKYSCRAPERS LLP

YELLOWSTONE SKYSCRAPERS LLP has 5 registrations on MahaRERA, including KOHINOOR CORAL and PRESIDENTIA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that PRESIDENTIA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PRESIDENTIA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRESIDENTIA?

The registered promoter entity is YELLOWSTONE SKYSCRAPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRESIDENTIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRESIDENTIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRESIDENTIA?

The professionals named in the filing: Architect: VK A ARCHITECTURE; Engineer: PLANEDGE CONSULTANTS P LTD; Chartered Accountant: BHANDARI S A A J & ASSOCIATES; Chartered Accountant: VINOD N NIKAM & CO; Chartered Accountant: JAYESH N JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRESIDENTIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRESIDENTIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRESIDENTIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.