ReraGenieLog inGet a buyer report

Home / Browse projects / BHALCHANDRA NIWAS CHS

Registered No litigation declared Residential / Group Housing project

BHALCHANDRA NIWAS CHS

By ISHAAN REALTORS

RG-MH-98204 · RERA P51900050749 · Last updated on MahaRERA portal: 23 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Stilt Floor, 90%
0Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

BHALCHANDRA NIWAS CHS is a Residential / Group Housing project by ISHAAN REALTORS in HINDU COLONY DADAR, 400014, registered with MahaRERA as P51900050749 on 28 Apr 2023. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameBHALCHANDRA NIWAS CHS
  • TypeResidential / Group Housing
  • Location
    • SIR BHALCHANDRA ROAD
    • HINDU COLONY DADAR
    • 400014
  • Pincode400014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900050749
  • ReraGenie IDRG-MH-98204

Builder

  • NameISHAAN REALTORS
  • Entity typePartnership
  • PartnersNITIN PRABHAKAR NATU, LAXMIKANT RAMPRASAD KABRA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2023
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
9 BHALCHANDRANA1514000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

9 BHALCHANDRA: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area651 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
BHALCHANDRA NIWAS CHS-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2195.47
Proposed, not sanctioned2,180 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch268 MEENA BAUG TELANG ROAD MATUNGA MUMBAI 19

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMEDHA GORE
EngineerAssociated Structural Engineers LLP
Chartered AccountantSSN & R CO
PartnerRole in project
ISHAAN REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3 CA dec-24.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: from 5 23-24.pdf23 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate dec-2024.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 23-24.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3 sep-2024.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 SEP 2024 ca.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2 Engineer certificate sep-2024.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3 March 2024.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf14 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: engineer certificate.pdf14 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 09-Feb-2024 1-05 pm_compressed.pdf14 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf12 Dec 2023
Declaration about Commencement CertificateFile: full cc.pdf12 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bhalchndra.pdf12 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: certificate (3).pdf12 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bhalchandra.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECLARATION TABLE 3 CA CERTIFICATE.pdf17 Apr 2023
Proforma of Agreement for saleFile: Agreement for Sale 17042023.pdf17 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf3 Mar 2023
Copy of the legal title reportFile: SK legal Associates LLP -legal Title Report_compressed.pdf16 Feb 2023
Building plan approvalFile: IOD plan 04-07-2022.pdf3 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD plan 04-07-2022.pdf3 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seperate Bank Account.pdf17 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation with agreement.pdf17 Dec 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DA Part 1.pdf25 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DA Part 2.pdf25 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DA Part 3.pdf25 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Formation of Legal Entity.pdf23 Nov 2022
Status of ConveyanceFile: Property Card.pdf23 Nov 2022
Other - LegalFile: Joint Litigation Declaration.pdf23 Nov 2022
Declaration about Commencement CertificateFile: Declarations about CC.pdf17 Nov 2022
Proforma of Allotment letterFile: Allotment Letter.pdf17 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf17 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200246597791_For_Asset_Based_Search_07_09_2022_14_24_23_565.pdf14 Nov 2022
Layout approvalFile: IOD_signed-04-07-2022.pdf4 Nov 2022
PAN CardFile: PAN Card Ishaan Realtors.pdf4 Nov 2022
Details of encumbrances concerned to FinanceFile: Legal Encrumbance.pdf4 Nov 2022
Details of encumbrances concerned to LegalFile: Legal Encrumbance.pdf4 Nov 2022
Copy of Layout Approval (in case of layout)File: IOD_signed-04-07-2022.pdf4 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: FirstCC_signed.pdf4 Nov 2022
Declaration in FORM BFile: RERA Form B Affidavit cum Declaration.pdf4 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate - ( bhalchandra) 10-09-2022.pdf4 Nov 2022

Keep BHALCHANDRA NIWAS CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINDU COLONY DADAR

2 kmBHALCHANDRA NIWAS CHSCompleted 19Lapsed / revoked 10Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: ISHAAN REALTORS

ISHAAN REALTORS has 2 registrations on MahaRERA, including 9 UMA ISHAAN and BHALCHANDRA NIWAS CHS. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if BHALCHANDRA NIWAS CHS is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHALCHANDRA NIWAS CHS?

The registered promoter entity is ISHAAN REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHALCHANDRA NIWAS CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHALCHANDRA NIWAS CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHALCHANDRA NIWAS CHS?

The professionals named in the filing: Architect: SUMEDHA GORE; Engineer: Associated Structural Engineers LLP; Chartered Accountant: SSN & R CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHALCHANDRA NIWAS CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHALCHANDRA NIWAS CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHALCHANDRA NIWAS CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.