Red flags

  • Completion date moved by 57 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 57 months from the original
25 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
2 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

BELMONT is a Residential / Group Housing project by VASTU AMBIKA VENTURES in Aurangabad, Maharashtra, registered with MahaRERA as P51500032890 on 2 Feb 2022. Possession is promised by 31 Dec 2030. The completion date has moved by 57 months from the original filing. 40 of the 42 units on this registration are recorded sold or booked, and 25 of 33 construction stages are filed complete.

At a glance

Project

  • NameBELMONT
  • TypeResidential / Group Housing
  • Location
    • PAITHAN ROAD
    • ITKHEDA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431002
  • Pincode431002
  • RERA no.P51500032890
  • ReraGenie IDRG-MH-83834

Builder

  • NameVASTU AMBIKA VENTURES
  • Entity typePartnership
  • PartnersPRAVIN MAHARUDRA NAGARGOJE, DEEPAK JETHMAL PARMAR

Key dates

this monthRegisteredFeb 2022First promiseMar 2026Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2022
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 31 Mar 2026)
  • Buildings3 building records
  • Documents filed87 files

Current status

95%40 of 42 units booked
84.2%Work done, per cost certificate

Figures as on 10 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BELMONT A TYPE ROW HOUSENA40606
BELMONT B TYPE ROW HOUSENA40808
BELMONT C TYPE APARTMENTNA9928028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 10 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

BELMONT A TYPE ROW HOUSE82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BELMONT B TYPE ROW HOUSE73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor-
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BELMONT C TYPE APARTMENT73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
BELMONT A TYPE ROW HOUSE11
BELMONT B TYPE ROW HOUSE11
BELMONT C TYPE APARTMENT11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,965 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Aug 2025

Approvals and building plan

Sanctioning authorityAURANGABAD MUNICIPAL CORPORATION
Permissible FSI5741.46
Proposed, not sanctioned3,776 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKranti Chowk AURANGABAD
Estimated costRs 8.43 cr
Cost incurredRs 7.10 cr
Work done84.23%
BuildingWingEstimatedIncurred
BELMONT C TYPE APARTMENTNARs 3.93 crRs 2.76 cr
BELMONT B TYPE ROW HOUSENARs 2.20 crRs 2.15 cr
BELMONT A TYPE ROW HOUSENARs 2.06 crRs 2.00 cr
-NARs 24.00 lakhRs 19.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSIGNATURE ARCH SANTOSH JADHAV
EngineerSIGNATURE
EngineerTADEEBUDDIN TAUFIQUDDIN SIDDIQUI
Chartered AccountantV R Patni And Associates
Chartered AccountantFAIZAN KHAN
PartnerRole in project
VASTU AMBIKA VENTURES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31032620471Mar 2026 → Dec 2030

Reason as filed by the promoterW.H.O declared COVID Pandemic is over in May 2023, thereafter the activities including Construction started but with slower pace. Therefore, additional grace period of Completion should be given to the Project till 31-12-2030. Whereas after the Pandemic , I have facing major Financial Crisis so the work was totally Slowed Down so I Could not able the Complete the project within the time period which I have Declared on Maharera

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: QPR 1 FORM 1 2025-26.pdf10 May 2026
Withdrawal Update Form 2File: QPR 1 FORM 2 2025-26.pdf10 May 2026
Withdrawal Update Form 3File: QPR 1 2025-26.pdf10 May 2026
Withdrawal Update Form 1File: QPR 1 FORM 1 2025-26.pdf30 Mar 2026
Withdrawal Update Form 1File: QPR 1 FORM 1 2025-26.pdf30 Mar 2026
Withdrawal Update Form 2File: QPR 1 FORM 2 2025-26.pdf30 Mar 2026
Withdrawal Update Form 2File: QPR 1 FORM 2 2025-26.pdf30 Mar 2026
Withdrawal Update Form 3File: QPR 1 2025-26.pdf30 Mar 2026
Withdrawal Update Form 3File: QPR 1 2025-26.pdf30 Mar 2026
Withdrawal Update Form 1File: QPR 1 FORM 1 2025-26.pdf5 Oct 2025
Withdrawal Update Form 2File: QPR 1 FORM 2 2025-26.pdf5 Oct 2025
Withdrawal Update Form 3File: QPR 1 2025-26.pdf5 Oct 2025
Form 1File: Q1 FORM 1 2022-23.pdf3 Oct 2025
Form 2File: Q1 FORM 2 2022-23.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Q1 SOLD INVENTORY 2022-23.pdf3 Oct 2025
Form 3File: QPR 1 2022-2023.pdf3 Oct 2025
Form 3File: QPR 2 2022-2023.pdf3 Oct 2025
Form 1File: Q2 FORM 1 2022-23.pdf3 Oct 2025
Form 2File: Q2 FORM 2 2022-23.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Q2 SOLD INVENTORY 2022-2023.pdf3 Oct 2025
Form 3File: QPR-3 2022-23.pdf3 Oct 2025
Form 1File: Q3 FORM 1 2022-2023.pdf3 Oct 2025
Form 2File: Q3 FORM 2 2022-23.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Q3 SOLD INVENTORY 2022-2023.pdf3 Oct 2025
Form 1File: Q3 FORM 1 2022-2023.pdf3 Oct 2025
Form 2File: Q3 FORM 2 2022-23.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Q3 SOLD INVENTORY 2022-2023.pdf3 Oct 2025
Form 3File: QPR-4 2022-23.pdf3 Oct 2025
Form 1File: Q1 FORM 1 2023-2024.pdf3 Oct 2025
Form 2File: QPR1 FORM 2 2023-2024.pdf3 Oct 2025
Form 3File: QPR-01 2023-24.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Q1 SOLD INVENTORY 2023-2024.pdf3 Oct 2025
Form 1File: Q2 FORM 1 2023-24.pdf3 Oct 2025
Form 2File: QPR 2 FORM 2 2023-24.pdf3 Oct 2025
Form 3File: QRP-2 2023-24.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: QPR 2 SOLD INVENTORY.pdf3 Oct 2025
Form 1File: QPR 3 FORM 1 2023-24.pdf3 Oct 2025
Form 2File: QPR 3 FORM 2 2023-24.pdf3 Oct 2025
Form 3File: QRP-3 2023-24.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: QPR 3 SOLD INVENTORY.pdf3 Oct 2025
Form 1File: QPR 4 FORM 1 2023-24.pdf3 Oct 2025
Form 2File: QPR 4 FORM 2 2023-24.pdf3 Oct 2025
Form 3File: QRP 4 2023-24.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: QPR 4 SOLD INVENTORY.pdf3 Oct 2025
Form 1File: QPR 4 FORM 1 2023-24.pdf3 Oct 2025
Form 2File: QPR 4 FORM 2 2023-24.pdf3 Oct 2025
Form 3File: QRP 4 2023-24.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: QPR 4 SOLD INVENTORY.pdf3 Oct 2025
Form 1File: QPR 2 FORM 1 2024-25.pdf3 Oct 2025
Form 2File: QPR FORM 2 2024-25.pdf3 Oct 2025
Form 3File: QRP 2 2024-25.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: QRP 2 SOLD INVENTORY 2024-25.pdf3 Oct 2025
Form 1File: QPR 3 FORM 1 2024-25.pdf3 Oct 2025
Form 2File: QPR 3 FORM 2 2024-25.pdf3 Oct 2025
Form 3File: QRP 3 2024-25.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: QPR 3 SOLD INVENTORY 2024-25.pdf3 Oct 2025
Form 1File: QPR 4 FORM 1 2024-25.pdf3 Oct 2025
Form 2File: QPR 4 FORM 2 2024-25.pdf3 Oct 2025
Form 3File: QPR 4 2024-25.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: QPR 4 SOLD INVENTORY 2024-25.pdf3 Oct 2025
Form 1File: QPR 4 Form 1 2021-2022.pdf2 Oct 2025
Form 2File: QPR 4 FORM 2 2021-2022.pdf2 Oct 2025
Form 3File: QPR-4 2021-2022 Form 3.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 2021-2022 QPR 4.pdf2 Oct 2025
Form 5 (FY 2024-2025)File: form 5 2024 -25.pdf27 Sep 2025
Form 2A (FY 2024-2025)File: Form 2-A 25-25.pdf23 Sep 2025
Form 2A (FY 2021-2022)File: Form 2-A Belmont 2021-22.pdf22 Sep 2025
Form 2A (FY 2022-2023)File: Form 2 -A Belmont 22-23.pdf22 Sep 2025
Form 2A (FY 2023-2024)File: Belmont form 2-A 23-24.pdf22 Sep 2025
Form 5 (FY 2023-2024)File: from 5 2023-24.pdf25 Aug 2025
Form 5 (FY 2021-2022)File: form 5 21-22.pdf16 Aug 2025
Form 5 (FY 2022-2023)File: form 5 22-23 (1).pdf16 Aug 2025
Declaration about Commencement CertificateFile: format d.pdf18 Jan 2022
Layout approvalFile: Plan1_compressed.pdf21 Dec 2021
Building plan approvalFile: Plan 2_compressed.pdf21 Dec 2021
Building plan approvalFile: Plan 3_compressed.pdf21 Dec 2021
PAN CardFile: PAN vastuambika.pdf21 Dec 2021
Copy of the legal title reportFile: Vastu ambika search_compressed.pdf21 Dec 2021
Details of encumbrancesFile: Vastu Ambika Ventuer Letterhead.pdf21 Dec 2021
Copy of Layout Approval (in case of layout)File: Plan1_compressed.pdf21 Dec 2021

How this compares with Aurangabad

95%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 57 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep BELMONT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ITKHEDA1,400+ in Aurangabad

Builder: VASTU AMBIKA VENTURES

VASTU AMBIKA VENTURES has 1 registration on MahaRERA, including BELMONT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if BELMONT is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BELMONT?

The registered promoter entity is VASTU AMBIKA VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BELMONT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BELMONT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BELMONT?

The professionals named in the filing: Architect: SIGNATURE ARCH SANTOSH JADHAV; Engineer: SIGNATURE; Engineer: TADEEBUDDIN TAUFIQUDDIN SIDDIQUI; Chartered Accountant: V R Patni And Associates; Chartered Accountant: FAIZAN KHAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BELMONT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BELMONT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BELMONT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.