Completed No litigation declared Residential / Group Housing project

Belmont Celosia

By Belmont Properties

RG-MH-94173 · RERA P52100054248 · Last updated on MahaRERA portal: 21 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: .
Jun 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 90%
0 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Belmont Celosia is a Residential / Group Housing project by Belmont Properties in Dhanori, 411015, registered with MahaRERA as P52100054248 on 10 Jan 2024. The registration is recorded completed; possession was promised by 30 Jun 2026. 20 of the 20 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameBelmont Celosia
  • TypeResidential / Group Housing
  • Location
    • Sr. No. 34
    • Hissa no. 1
    • Plot No. 83
    • Dhanori
    • Pune- 411015.
    • Dhanori
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054248
  • ReraGenie IDRG-MH-94173

Builder

  • NameBelmont Properties
  • Entity typePartnership
  • PartnersAjitkumar Ramchandra Mahadik, Monika Swapnil Kshirsagar, Uttam Nivrutti Dimble, Prasad balasaheb Shinde
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJan 2024PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jan 2024
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

100%20 of 20 units booked
82.8%Work done, per cost certificate

Figures as on 21 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Belmont CelosiaNA5520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

Belmont Celosia: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 21 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Open Space17

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area486 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Nov 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1530.45
Proposed, not sanctioned1,530 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 2 3 4 ,GROUND FLOOR, TIRUPATI KASHIGANGA, S NO 16, 31 B, DHANORI PUNE- 411015
Estimated costRs 6.50 cr
Cost incurredRs 5.39 cr
Work done82.81%
BuildingWingEstimatedIncurred
Belmont CelosiaNARs 5.85 crRs 4.74 cr
-NARs 65.04 lakhRs 65.04 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign
EngineerRohinee Engineer
EngineerAjitkumar Mahadik
Chartered AccountantCA Deepak Pardeshi
Chartered AccountantDevansh Vaishya
Chartered AccountantR H Pothiwal
PartnerRole in project
Belmont Properties-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Mail Screenshot.pdf21 Mar 2026
Occupational CertificateFile: PLOT NO 83 DHANORI COMPLETION.pdf21 Mar 2026
Form 1File: Form 1.pdf20 Mar 2026
Form 2File: Form 2.pdf20 Mar 2026
Form 3File: Form 3.pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf20 Mar 2026
Form 1File: Form 1.pdf20 Mar 2026
Form 2File: Belmont Celosia sep 24.pdf20 Mar 2026
Form 3File: Celosia Form 3 sep24 (1) (2).pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold (1) (1).pdf20 Mar 2026
Withdrawal Update Form 1File: Form1 Main.pdf23 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf23 Feb 2026
Form 5 (FY 2024-2025)File: CELOSIA Rera Form 5 2024-25.pdf26 Nov 2025
Form 1File: Form 1.pdf15 Nov 2025
Form 2File: Form 2.pdf15 Nov 2025
Form 3File: Form 3.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf15 Nov 2025
Form 1File: Form 1 s_compressed (2).pdf15 Nov 2025
Form 2File: Form 2 s.pdf15 Nov 2025
Form 3File: Form 3 s.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf15 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25 (1).pdf15 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf15 Nov 2025
Form 2A (FY 2025-2026)File: Form 2A 25-26 (1).pdf15 Nov 2025
Form 5 (FY 2023-2024)File: CELOSIA Rera Form 5_CA Certificate_2023.pdf15 Nov 2025
Form 1File: ARC-RERA CERTIFILED.pdf16 Oct 2025
Form 2File: Belmont Celosia sep 25 s.pdf16 Oct 2025
Form 3File: Belmont Celosia_CA Certificate_Sep 25 (1).pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD CIRCULAR 29 (5).pdf16 Oct 2025
Form 1File: Form1 .pdf18 Sep 2025
Form 2File: Form2 (1) (1).pdf18 Sep 2025
Form 3File: Form 3 (18).pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD (4).pdf18 Sep 2025
Form 1File: signed F1_11zon.pdf18 Sep 2025
Form 2File: signed F2.pdf18 Sep 2025
Form 3File: signed F3.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: signed sold unsold (2).pdf18 Sep 2025
Disclosure of sold/ booked inventoryFile: 3 Disclosure of sold_ booked inventory (1).pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Celosia March 25 (1).pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New Doc.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Celosia March 25 (1).pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: crystel.pdf24 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CELOSIA Rera Form 5.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed (2).pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan Jan 11, 2025 (1).pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD CIRCULAR 29.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed F1_.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed F2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed F3.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD CIRCULAR 29.pdf27 Jun 2024
Layout approvalFile: Plan.pdf19 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf19 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Belmont.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Apr 2024
Building plan approvalFile: REVISED PLAN_compressed.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN_compressed.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 .pdf13 Mar 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf13 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC mail (2).pdf30 Dec 2023
Other - LegalFile: Plot no 83 Sale deed ScanningFile (31)_compressed.pdf30 Dec 2023
Other - LegalFile: New Index2file (43).pdf30 Dec 2023
Other - LegalFile: Partnership Deed.pdf30 Dec 2023
Copy of the legal title reportFile: Legal Tittle_compressed.pdf9 Dec 2023
Copy of the legal title reportFile: Legal Title Format A.pdf7 Dec 2023
Declaration in FORM BFile: Form B_compressed (1).pdf7 Dec 2023
CERSAI detailsFile: CERSAI_Search_Report_200289412570_For_Asset_Based_Search_07_12_2023_18_18_53_191 (1).pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFILED .pdf7 Dec 2023
Proforma of Agreement for saleFile: Agreement to Sell as per RERA.pdf7 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank Dec.pdf7 Dec 2023
Layout approvalFile: Main layout_11zon.pdf5 Dec 2023
Building plan approvalFile: Main layout_11zon.pdf5 Dec 2023
PAN CardFile: Firm Pan Crad.pdf5 Dec 2023
Details of encumbrances concerned to FinanceFile: Self d Encumbrances.pdf5 Dec 2023
Details of encumbrances concerned to LegalFile: Self d Encumbrances.pdf5 Dec 2023
Copy of Layout Approval (in case of layout)File: Main layout_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Main layout_11zon.pdf5 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Dec 2023
Declaration about Commencement CertificateFile: D-Commencement.pdf5 Dec 2023

Keep Belmont Celosia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhanori

2 kmBelmont CelosiaCompleted 38Lapsed / revoked 15Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 79 registered projects within 2 km.

Builder: Belmont Properties

BELMONT PROPERTIES has 2 registrations on MahaRERA, including SOLASTA VILLAS and Belmont Celosia. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Belmont Celosia is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Belmont Celosia?

The registered promoter entity is Belmont Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Belmont Celosia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Belmont Celosia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Belmont Celosia?

The professionals named in the filing: Architect: Design; Engineer: Rohinee Engineer; Engineer: Ajitkumar Mahadik; Chartered Accountant: CA Deepak Pardeshi; Chartered Accountant: Devansh Vaishya; Chartered Accountant: R H Pothiwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Belmont Celosia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Belmont Celosia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Belmont Celosia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.