Home / Browse projects / Ratnagiri, Maharashtra / BELLE VUE

Registered No litigation declared Residential / Group Housing project

BELLE VUE

By Cranfield Construction

RG-MH-29067 · RERA P52800027800 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 30 months from the original
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 97%
20 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 168 documents Report an error

BELLE VUE is a Residential / Group Housing project by Cranfield Construction in Ratnagiri, Maharashtra, registered with MahaRERA as P52800027800 on 4 Jan 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 30 months from the original filing. 2 of the 22 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameBELLE VUE
  • TypeResidential / Group Housing
  • Location
    • Dapoli
    • Dapoli Camp
    • Ratnagiri
    • 415712
  • Pincode415712
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800027800
  • ReraGenie IDRG-MH-29067

Builder

  • NameCranfield Construction
  • Entity typePartnership
  • PartnerNaved Mohammad Mukadam

Key dates

this monthRegisteredJan 2021First promiseJun 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jan 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 8 Jun 2024)
  • Buildings1 building record
  • Documents filed168 files

Current status

9%2 of 22 units booked
46.5%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BELLE VUENA4422022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 97%.

BELLE VUE: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area462 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Aug 2025
LandownerVillageDistrict
Cranfield ConstructionMumbai CityMumbai City
RAJENDRA VISHNU KADAMDapoli Camp Ratnagiri

Approvals and building plan

Sanctioning authorityDAPOLI NAGARPANCHAYAT DAPOLI
Permissible FSI780.0
Proposed, not sanctioned780 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 337 Carol Mansion No 35 Sitladevi Temple Road Mahim West
Estimated costRs 2.24 cr
Cost incurredRs 1.04 cr
Work done46.51%
BuildingWingEstimatedIncurred
BELLE VUENARs 2.24 crRs 1.04 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHIRISH GHORPADE & ASSOCIATES
EngineerSANDEEP SHRIDHAR SHETYE
EngineerSAGAR VIKAS JADHAV
Chartered AccountantBHURANI & ASSOCIATES
Chartered AccountantAS SUTERWALA & CO
Chartered AccountantARUN JAMUNA & CO
Chartered AccountantSHABBAR & ASSOCIATES
PartnerRole in project
Cranfield Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52800025670Jun 2024 → Dec 2026

Reason as filed by the promoterWe had taken Maharera Registration on 04/01/2021 and the original date of project completion was 08/12/2023. Since the project consist of only 1 building and we expected that the project would be completed in 36 months. However due to below mentioned circumstances the project could not be completed. 1. The project is situated at Village Dapoli Camp, Taluka Dapoli, District Ratnagiri, which is a very rural area. The village is situated at around 130 km from ratnagiri city itself. 2. We have started the projected in January 2021 just after the 2nd wave of Covid-19 on a good belief, but the 2nd w

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed168

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2022-2023)File: Quality Assurance Certificate FY 2022-23.pdf30 May 2026
Form 2A (FY 2023-2024)File: Quality Assurance Certificate FY 2023-24.pdf30 May 2026
Form 1File: Architect Certificate FY 2020-21.pdf18 May 2026
Form 2File: Engineer Certificate FY 2020-21.pdf18 May 2026
Form 3File: CA Certificate FY 2020-21.pdf18 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory FY 2020-21.pdf18 May 2026
Form 1File: Architect Certificate FY 2021-22.pdf18 May 2026
Form 2File: Engineer Certificate FY 2021-22.pdf18 May 2026
Form 3File: CA Certificate FY 2021-22.pdf18 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory FY 2021-22.pdf18 May 2026
Form 1File: Architect Certificate FY 2021-22.pdf18 May 2026
Form 2File: Engineer Certificate FY 2021-22.pdf18 May 2026
Form 3File: CA Certificate FY 2021-22.pdf18 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory FY 2021-22.pdf18 May 2026
Form 1File: Architect Certificate FY 2021-22.pdf18 May 2026
Form 2File: Engineer Certificate FY 2021-22.pdf18 May 2026
Form 3File: CA Certificate FY 2021-22.pdf18 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory FY 2021-22.pdf18 May 2026
Form 1File: Architect Certificate FY 2021-22.pdf18 May 2026
Form 2File: Engineer Certificate FY 2021-22.pdf18 May 2026
Form 3File: CA Certificate FY 2021-22.pdf18 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory FY 2021-22.pdf18 May 2026
Form 2A (FY 2020-2021)File: Quality Assurance Certificate FY 2020-21.pdf18 May 2026
Form 2A (FY 2021-2022)File: Quality Assurance Certificate FY 2021-22.pdf18 May 2026
Form 1File: Architect Certificate FY 22-23.pdf13 May 2026
Form 2File: Engineer Certificate 22-23.pdf13 May 2026
Form 3File: CA Certificate FY 22-23.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 22-23.pdf13 May 2026
Form 1File: Architect Certificate FY 22-23.pdf13 May 2026
Form 2File: Engineer Certificate 22-23.pdf13 May 2026
Form 3File: CA Certificate FY 22-23.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 22-23.pdf13 May 2026
Form 1File: Architect Certificate FY 22-23.pdf13 May 2026
Form 2File: Engineer Certificate 22-23.pdf13 May 2026
Form 3File: CA Certificate FY 22-23.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 22-23.pdf13 May 2026
Form 1File: Architect Certificate FY 22-23.pdf13 May 2026
Form 2File: Engineer Certificate 22-23.pdf13 May 2026
Form 3File: CA Certificate FY 22-23.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 22-23.pdf13 May 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q4.pdf4 May 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q4.pdf4 May 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q4.pdf4 May 2026
Form 1File: Architect Certificate FY 23-24-Q1.pdf12 Mar 2026
Form 2File: Engineer Certificate FY 23-24-Q1.pdf12 Mar 2026
Form 3File: CA Certificate FY 23-24-Q1.pdf12 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 23-24-Q1.pdf12 Mar 2026
Form 1File: Architect Certificate FY 23-24-Q2.pdf12 Mar 2026
Form 2File: Engineer Certificate FY 23-24-Q2.pdf12 Mar 2026
Form 3File: CA Certificate FY 23-24-Q2.pdf12 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 23-24-Q2.pdf12 Mar 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q3.pdf26 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q3.pdf26 Feb 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q3.pdf26 Feb 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q2.pdf23 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q2.pdf23 Dec 2025
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf23 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Audit Report FY 2024-25.pdf23 Dec 2025
Form 5 (FY 2023-2024)File: Audit Report FY 23-24.pdf23 Dec 2025
Form 5 (FY 2022-2023)File: Audit Report FY 22-23.pdf23 Dec 2025
Form 5 (FY 2021-2022)File: Audit Report FY 2021-22.pdf23 Dec 2025
Form 5 (FY 2020-2021)File: Audit Report FY 2020-21 and FY 2021-22.pdf23 Dec 2025
Form 1File: Architect Certificate FY 24-25-Q4.pdf28 Nov 2025
Form 2File: Engineer Certificate FY 24-25-Q4.pdf28 Nov 2025
Form 3File: CA Certificate FY 24-25-Q4.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory FY 24-25-Q4.pdf28 Nov 2025
Form 1File: Architect Certificate FY 24-25-Q3.pdf28 Nov 2025
Form 2File: Engineer Certificate FY 24-25-Q3.pdf28 Nov 2025
Form 3File: CA Certificate FY 24-25-Q3.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q3.pdf28 Nov 2025
Form 1File: Architect Certificate FY 24-25-Q2.pdf28 Nov 2025
Form 2File: Engineer Certificate FY 24-25-Q2.pdf28 Nov 2025
Form 3File: CA Certificate FY 24-25-Q2.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q2.pdf28 Nov 2025
Form 1File: Architect Certificate FY 24-25-Q1.pdf28 Nov 2025
Form 2File: Engineer Certificate FY 24-25-Q1.pdf28 Nov 2025
Form 3File: CA Certificate FY 24-25-Q1.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q1.pdf28 Nov 2025
Form 1File: Architect Certificate FY 23-24-Q4.pdf28 Nov 2025
Form 2File: Engineer Certificate FY 23-24-Q4.pdf28 Nov 2025

How this compares with Ratnagiri

9%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one moved by 30 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep BELLE VUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dapoli1,100+ in Ratnagiri

2 kmBELLE VUECompleted 25Lapsed / revoked 15Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: Cranfield Construction

Cranfield Construction has 1 registration on MahaRERA, including BELLE VUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if BELLE VUE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BELLE VUE?

The registered promoter entity is Cranfield Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BELLE VUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BELLE VUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BELLE VUE?

The professionals named in the filing: Architect: SHIRISH GHORPADE & ASSOCIATES; Engineer: SANDEEP SHRIDHAR SHETYE; Engineer: SAGAR VIKAS JADHAV; Chartered Accountant: BHURANI & ASSOCIATES; Chartered Accountant: AS SUTERWALA & CO; Chartered Accountant: ARUN JAMUNA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BELLE VUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BELLE VUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BELLE VUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.