Home / Browse projects / Mumbai City, Maharashtra / BELLAGIO
BELLAGIO
By ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED
RG-MH-42867 · RERA P51900016554 · Last updated on MahaRERA portal: 21 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 27 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BELLAGIO is a Residential / Group Housing project by ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as P51900016554 on 23 May 2018. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 27 months from the original filing. 12 of the 107 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameBELLAGIO
- TypeResidential / Group Housing
- Location
- BYCULLA
- Mumbai City
- 400008
- Pincode400008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900016554
- ReraGenie IDRG-MH-42867
Builder
- NameESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED
- Entity typeCompany
- DirectorRISHAB PRADEEP JAIN
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 May 2018
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed84 files
Current status
Figures as on 21 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BELLAGIO | NA | 26 | 22 | 79 | 28 | 107 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
BELLAGIO: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 97% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 97% |
| Storm Water Drains | Yes | 97% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BELLAGIO | NA | Rs 20.00 cr | Rs 20.00 cr |
| - | NA | Rs 4.50 cr | Rs 4.50 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M SQUARE & ASSOCIATES |
| Engineer | HANWARE CONSULTANTS |
| Engineer | ZZ CONSULTANT |
| Chartered Accountant | NEHALI & CO |
| Partner | Role in project |
|---|---|
| ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have submitted an application (RERA Number P51900016554) for the extension of our registration with MAHA RERA, in accordance with the provisions outlined in Section 7/31 of the RERA Act, requesting an extension for a duration of 31-03-2026 months. The project has encountered several challenges that have necessitated a revision of our original timeline This application is made with the intent of extending the registration's validity with MAHA RERA, taking into consideration the best interests of a significant number of allottees involved in the project Section 7(3) of the RERA Act has given
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000196410 | Dhruv | Estelle Estates & Infrastructures Pvt.,LTd., | 20/03/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 May 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Arch Certificate-Bellagio.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: CA Certificate- ESTELLE ESTATE (Bellagio) Dec-25.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Arch Certificate-Bellagio.pdf | 9 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 9 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate- ESTELLE ESTATE (Bellagio) Dec-25.pdf | 9 Feb 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE SEPTEMBER-25 (Bellagio).pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Form 2_Bellagio - Jun-2025 Quarter.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate- ESTELLE ESTATE (Belagio) June-25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE JUNE-25 (Bellagio).pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Form 2_Bellagio - Jun-2025 Quarter.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate- ESTELLE ESTATE (Belagio) June-25.pdf | 3 Feb 2026 |
| Disclosure of sold/ booked inventoryFile: inventory disclosure format.pdf | 31 May 2025 |
| Declaration in FORM BFile: Bellagio - estelle estate form b.pdf | 29 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 march 2025.pdf | 29 May 2025 |
| Certificates of CA (Form 3)File: Form - 3 March 25.pdf | 29 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 March 2025.pdf | 29 May 2025 |
| Disclosure of sold/ booked inventoryFile: inventory disclosure format.pdf | 29 May 2025 |
| Certificates of CA (Form 3)File: form 3.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: New Bellagio Inventory disclosure.pdf | 11 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 FY 23-24.pdf | 11 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 22 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 22 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 22 Oct 2024 |
| Certificates of CA (Form 3)File: form 3.pdf | 22 Oct 2024 |
| Certificates of CA (Form 3)File: form 3.pdf | 22 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 22 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 22 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 22 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf | 22 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 2 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 27 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 27 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf | 27 Mar 2024 |
| Declaration about Commencement CertificateFile: CC DECLARATION.pdf | 11 Mar 2024 |
| Declaration in FORM BFile: FORM B.pdf | 11 Mar 2024 |
| CERSAI detailsFile: CERSAI DECLARTION.pdf | 11 Mar 2024 |
| Certificates of CA (Form 3)File: CA form 3.pdf | 11 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5 estelle 22-23.pdf | 11 Mar 2024 |
| Certificates of CA (Form 3)File: FORM 3 MAR 19.pdf | 10 Apr 2023 |
| Certificates of CA (Form 3)File: FORM 3 MAR 20.pdf | 10 Apr 2023 |
| Certificates of CA (Form 3)File: FORM 3 MAR 21.pdf | 10 Apr 2023 |
| Certificates of CA (Form 3)File: FORM 3 MAR 22.pdf | 10 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf | 10 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf | 10 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf | 10 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf | 10 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02 MARCH- 2019 1 old format.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 03 MARCH 2020 1 old format.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 04 MARCH 2021 1 old format.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 MARCH 2022 1 new format.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 06 JUNE 2022 1 new format.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 07 SEPTEMBER 2022 1 new format.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 08 DECEMBER 2022 1 new format.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 09 MARCH 2023 1 new format.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 March 2019 form 2.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 03 March 2020 form 2.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 March 2021 form 2.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 05 March 2022 Form 2 New Format.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06 June 2022 Form 2 New Format.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07 September 2022 Form 2 New Format.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 08 December 2022 Form 2 New Format.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 09 March 2023 Form 2 New Format.pdf | 8 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019-2020 Form 2A.pdf | 8 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-2021 Form 2A.pdf | 8 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-2022 Form 2A.pdf | 8 Apr 2023 |
| Details of encumbrancesFile: LSCPL_-_Letterhead (1).pdf | 17 May 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 17 May 2018 |
| OtherFile: Carpet_area_statement_Bellagio-ilovepdf-compressed.pdf | 17 May 2018 |
| Layout approvalFile: IOD-.pdf | 9 May 2018 |
| Layout approvalFile: layout-ilovepdf-compressed.pdf | 9 May 2018 |
| Building plan approvalFile: layout-ilovepdf-compressed.pdf | 9 May 2018 |
| Building plan approvalFile: IOD-.pdf | 9 May 2018 |
| PAN CardFile: PAN.pdf | 9 May 2018 |
| Copy of the legal title reportFile: Tittle certificate-ilovepdf-compressed.pdf | 9 May 2018 |
| Copy of Layout Approval (in case of layout)File: IOD-.pdf | 9 May 2018 |
| Copy of Layout Approval (in case of layout)File: layout-ilovepdf-compressed.pdf | 9 May 2018 |
| Building Plan Approval (IOD)File: IOD-.pdf | 9 May 2018 |
| Building Plan Approval (IOD)File: layout-ilovepdf-compressed.pdf | 9 May 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 9 May 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BELLAGIO on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BYCULLA780+ in Mumbai City
Filed coordinates, straight-line distance. 160 registered projects within 2 km.
FATIMA HEIGHTS
M K ENTERPRISES
Nexsa Sky Vista
D.K. REALTORS & DEVELOPERS LIMITED
Lakadawala Garden
M/s. Lakadawala Developers Pvt. Ltd.
La Mer Residences
EXCELLENT REALTOR DEVELOPERS
Godrej Avenue Eleven - Tower A
GODREJ RESIDENCY PRIVATE LIMITED
FUEGO
HILTON INFRASTRUCTURE
See every Mumbai City project, with the district possession charts
Builder: ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED
ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED has 1 registration on MahaRERA, including BELLAGIO. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that BELLAGIO shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BELLAGIO is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BELLAGIO?
The registered promoter entity is ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BELLAGIO?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against BELLAGIO?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for BELLAGIO?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BELLAGIO?
The professionals named in the filing: Architect: M SQUARE & ASSOCIATES; Engineer: HANWARE CONSULTANTS; Engineer: ZZ CONSULTANT; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BELLAGIO?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback