BELLA - WING C AND D

By LUCEAT REALTORS PRIVATE LIMITED

RG-MH-29957 · RERA P51800029526 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date
  • Litigation declared, 4 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
11 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 85%
12 of 222Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

BELLA - WING C AND D is a Others project by LUCEAT REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029526 on 4 Jun 2021. Possession was promised by 1 Jul 2025 and is now 15 months past that date. 210 of the 222 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBELLA - WING C AND D
  • TypeOthers
  • Location
    • SUBHASH NAGAR BHADUP WEST
    • S/WEST WARD
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800029526
  • ReraGenie IDRG-MH-29957

Builder

  • NameLUCEAT REALTORS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsVINEET JAWAHARLAL MEHTA, KARAN SURESH JOGANI, RAMESH TIKUCHAND JOGANI, JOHNSON FRANSIS ALMEIDA, NILESH BALKRISHNA NIMBALKAR
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

15 months past promisethis monthRegisteredJun 2021PromisedJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Jun 2021
  • Promised completion1 Jul 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed74 files

Current status

95%210 of 222 units booked

Figures as on 30 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BELLA- WING CNA2611010101
BELLA- WING DNA2619724121

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 85%.

BELLA- WING C83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises71%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
BELLA- WING D81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises71%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities21

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
PODIUM LANDSCAPEYes0%
MULTIPURPOSE HALLYes0%
KIDS PLAY ZONEYes0%
INDOOR GAME ZONESYes0%
GYMNASIUMYes0%
BUSINESS CENTERYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area649 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10250.0
Proposed, not sanctioned10,197 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch349, Business Point Bldg, Andheri East, Mumbai - 400069

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH SAVANT
EngineerOPTIMAL CONSULTANCY SERVICES PVT LTD
Chartered AccountantV A SHIMPI & ASSOCIATES
PartnerRole in project
LUCEAT REALTORS PRIVATE LIMITED-

Litigation declared4

CaseCourtStatus
CHAMBER SUMMONS NO 934 OF 2013/2013CITY CIVIL COURT MUMBAITHIS CHEMBER SUMMONS IS TAKEN OUT IN EXECUTION APPLICATION TO QUASH AND SET ASIDE ORDER PASSED IN E
CHAMBER ORDER NO 1183 OF 2019/2019BOMBAY HIGH COURTPENDING PLIANTIFF TO FILE AFFIDAVIT OF SERVICE
LODGING NO 14292/2021BOMBAY HIGH COURTNEW SUIT AT THE STAGE OF LODGING
CHAMBER SUMMONS NO 934/2013City Civil Court MumbaiOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000500458Luceat Realtors Pvt LtdMr. Piyush Ajay Singh18/06/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Oct 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 - Bella Wing C&D.pdf30 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bella Wing CD.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella CD - Form 2 - Dec 2024.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bella CD.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10-MAHA RERA FORM 1 wing C D up to June 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12-MAHA RERA FORM 1 wing C D up to Dec 2024.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Bella Wing C D.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: Bella C D Sold and Unsold Inventory.pdf24 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Bella - C D wing 2A.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bella CD September 2024.pdf31 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella - C D wing 2.pdf31 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LETTER - Bella.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Bella Wing C and D.pdf17 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate MARCH 2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BELLA RERA JUNE 2024 WING CD.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella CD Engineer Certificate.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella C D.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella CD Form 2.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1 Wing CD march 2024.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 04 20 RG LRPL BELLA FORM 3 MAR 2024 WING CD.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella Enginner Certificate CD Form 2 March 2023.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 BELLA WING CD - MARCH 2022.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bella C and D wing June 2022.pdf21 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Bella Quality Certificate C D wing 2023.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 01 20 RG LRPL RERA FORM 3 DEC 23 BELLA WING CD.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Bella wing CD December 2023.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 BELLA RERA SEPT 2023 WING CD.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14-MAHA RERA FORM 1 wing CD September 2023.pdf23 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Bella Wing C D March 2023.PDF30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 wing C D up to Dec 2021.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 wing C D up to March 2022.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 Bella wing CD up to Sept 2022.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Bella wing C D up to March 2023.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 Bella wing C D up to June 2023.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 BELLA RERA WING CD March 2023.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 BELLA Wing CD JUNE 2023.pdf2 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 BELLA WING C D SEPT 2022.pdf30 Sep 2022
Declaration about Commencement CertificateFile: BELLA Wing CD 24082022.pdf9 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Bella Wing C D- JUNE 2022.pdf9 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLA wing C D JUNE 2022.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Approval Letter 25042022.pdf30 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 28022022.pdf2 Mar 2022
Layout approvalFile: Amended Approval Letter Dt 28012022.pdf2 Feb 2022
Copy of Layout Approval (in case of layout)File: Amended Approval Letter Dt 28012022.pdf2 Feb 2022
Building plan approvalFile: AMENDED IOD LETTER 18082021.pdf18 Aug 2021
Copy of the legal title reportFile: RERA_Title_Certificate-_Luceat_090821.pdf18 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: AMENDED IOD LETTER 18082021.pdf18 Aug 2021
Proforma of Allotment letterFile: BHANDUP AFS MEHERNAAZ.pdf18 Aug 2021
Building plan approvalFile: Proforma For upload.pdf28 May 2021
Building Plan Approval / NA Order for plotted developmentFile: Proforma For upload.pdf28 May 2021
Building plan approvalFile: IOD Drawing CONVERTED.pdf27 May 2021
Building plan approvalFile: IOD Drawing CONVERTED.pdf27 May 2021
Building plan approvalFile: 1.pdf27 May 2021
Building plan approvalFile: 2.pdf27 May 2021
Building plan approvalFile: 3.pdf27 May 2021
Building plan approvalFile: 5.pdf27 May 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing CONVERTED.pdf27 May 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing CONVERTED.pdf27 May 2021
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf27 May 2021
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf27 May 2021
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf27 May 2021
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf27 May 2021
Proforma of Allotment letterFile: BELLA booking form_compressed_1.pdf27 May 2021
Proforma of Allotment letterFile: BELLA booking form_compressed_2.pdf27 May 2021
Layout approvalFile: IOD letter signed.pdf25 May 2021
PAN CardFile: Luceat Realtors PAN.pdf25 May 2021
Copy of the legal title reportFile: RERA Title Certificate Luceat FORMAT A.pdf25 May 2021
Details of encumbrancesFile: Luceat Encumbrance Certificate C D.pdf25 May 2021
Copy of Layout Approval (in case of layout)File: IOD letter signed.pdf25 May 2021
Commencement Certificates / NA Order for plotted developmentFile: BELLA CC FOR CD WING.pdf25 May 2021
Declaration in FORM BFile: Form-B- BELLA WING CD.pdf25 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate BELLA CD.pdf25 May 2021
Proforma of Allotment letterFile: Bella C D AFS DECLARATION.pdf25 May 2021
OtherFile: SRO CERTIFICATE BELLA -RPM_MCHI_518000_MSUB_781.pdf25 May 2021

How this compares with Mumbai Suburban

95%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BELLA - WING C AND D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near S/WEST WARD6,700+ in Mumbai Suburban

2 kmBELLA - WING C AND DCompleted 58Lapsed / revoked 39Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: LUCEAT REALTORS PRIVATE LIMITED

LUCEAT REALTORS PRIVATE LIMITED has 2 registrations on MahaRERA, including BELLA - WING C AND D and BELLA- WING A AND B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that BELLA - WING C AND D shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BELLA - WING C AND D is delayed beyond 1 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BELLA - WING C AND D?

The registered promoter entity is LUCEAT REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BELLA - WING C AND D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BELLA - WING C AND D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BELLA - WING C AND D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BELLA - WING C AND D?

The professionals named in the filing: Architect: MANISH SAVANT; Engineer: OPTIMAL CONSULTANCY SERVICES PVT LTD; Chartered Accountant: V A SHIMPI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BELLA - WING C AND D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BELLA - WING C AND D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BELLA - WING C AND D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.