Red flags
- Registration lapsed
- Possession 15 months past the filed date
- Litigation declared, 4 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BELLA - WING C AND D is a Others project by LUCEAT REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029526 on 4 Jun 2021. Possession was promised by 1 Jul 2025 and is now 15 months past that date. 210 of the 222 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameBELLA - WING C AND D
- TypeOthers
- Location
- SUBHASH NAGAR BHADUP WEST
- S/WEST WARD
- Kurla
- Mumbai Suburban
- 400078
- Pincode400078
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800029526
- ReraGenie IDRG-MH-29957
Builder
- NameLUCEAT REALTORS PRIVATE LIMITED
- Entity typeCompany
- DirectorsVINEET JAWAHARLAL MEHTA, KARAN SURESH JOGANI, RAMESH TIKUCHAND JOGANI, JOHNSON FRANSIS ALMEIDA, NILESH BALKRISHNA NIMBALKAR
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Jun 2021
- Promised completion1 Jul 2025
- Revised completionNone
- Buildings2 building records
- Documents filed74 files
Current status
Figures as on 30 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BELLA- WING C | NA | 26 | 1 | 101 | 0 | 101 |
| BELLA- WING D | NA | 26 | 1 | 97 | 24 | 121 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 85%.
BELLA- WING C83%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 71% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 55% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
BELLA- WING D81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 71% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 55% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities21
As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| PODIUM LANDSCAPE | Yes | 0% |
| MULTIPURPOSE HALL | Yes | 0% |
| KIDS PLAY ZONE | Yes | 0% |
| INDOOR GAME ZONES | Yes | 0% |
| GYMNASIUM | Yes | 0% |
| BUSINESS CENTER | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANISH SAVANT |
| Engineer | OPTIMAL CONSULTANCY SERVICES PVT LTD |
| Chartered Accountant | V A SHIMPI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| LUCEAT REALTORS PRIVATE LIMITED | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| CHAMBER SUMMONS NO 934 OF 2013/2013 | CITY CIVIL COURT MUMBAI | THIS CHEMBER SUMMONS IS TAKEN OUT IN EXECUTION APPLICATION TO QUASH AND SET ASIDE ORDER PASSED IN E |
| CHAMBER ORDER NO 1183 OF 2019/2019 | BOMBAY HIGH COURT | PENDING PLIANTIFF TO FILE AFFIDAVIT OF SERVICE |
| LODGING NO 14292/2021 | BOMBAY HIGH COURT | NEW SUIT AT THE STAGE OF LODGING |
| CHAMBER SUMMONS NO 934/2013 | City Civil Court Mumbai | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000500458 | Luceat Realtors Pvt Ltd | Mr. Piyush Ajay Singh | 18/06/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Aug 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Oct 2024
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 - Bella Wing C&D.pdf | 30 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bella Wing CD.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella CD - Form 2 - Dec 2024.pdf | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bella CD.pdf | 10 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10-MAHA RERA FORM 1 wing C D up to June 2024.pdf | 25 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12-MAHA RERA FORM 1 wing C D up to Dec 2024.pdf | 25 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure - Bella Wing C D.pdf | 25 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Bella C D Sold and Unsold Inventory.pdf | 24 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Bella - C D wing 2A.pdf | 22 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bella CD September 2024.pdf | 31 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella - C D wing 2.pdf | 31 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LETTER - Bella.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Bella Wing C and D.pdf | 17 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate MARCH 2024.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BELLA RERA JUNE 2024 WING CD.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella CD Engineer Certificate.pdf | 7 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella C D.pdf | 13 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella CD Form 2.pdf | 13 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1 Wing CD march 2024.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 04 20 RG LRPL BELLA FORM 3 MAR 2024 WING CD.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bella Enginner Certificate CD Form 2 March 2023.pdf | 22 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 BELLA WING CD - MARCH 2022.pdf | 21 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bella C and D wing June 2022.pdf | 21 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Bella Quality Certificate C D wing 2023.pdf | 21 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 01 20 RG LRPL RERA FORM 3 DEC 23 BELLA WING CD.pdf | 21 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Bella wing CD December 2023.pdf | 27 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 BELLA RERA SEPT 2023 WING CD.pdf | 8 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14-MAHA RERA FORM 1 wing CD September 2023.pdf | 23 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Bella Wing C D March 2023.PDF | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 wing C D up to Dec 2021.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 wing C D up to March 2022.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 Bella wing CD up to Sept 2022.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Bella wing C D up to March 2023.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 Bella wing C D up to June 2023.pdf | 21 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 BELLA RERA WING CD March 2023.pdf | 2 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 BELLA Wing CD JUNE 2023.pdf | 2 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 BELLA WING C D SEPT 2022.pdf | 30 Sep 2022 |
| Declaration about Commencement CertificateFile: BELLA Wing CD 24082022.pdf | 9 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Bella Wing C D- JUNE 2022.pdf | 9 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLA wing C D JUNE 2022.pdf | 23 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Approval Letter 25042022.pdf | 30 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 28022022.pdf | 2 Mar 2022 |
| Layout approvalFile: Amended Approval Letter Dt 28012022.pdf | 2 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Amended Approval Letter Dt 28012022.pdf | 2 Feb 2022 |
| Building plan approvalFile: AMENDED IOD LETTER 18082021.pdf | 18 Aug 2021 |
| Copy of the legal title reportFile: RERA_Title_Certificate-_Luceat_090821.pdf | 18 Aug 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: AMENDED IOD LETTER 18082021.pdf | 18 Aug 2021 |
| Proforma of Allotment letterFile: BHANDUP AFS MEHERNAAZ.pdf | 18 Aug 2021 |
| Building plan approvalFile: Proforma For upload.pdf | 28 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Proforma For upload.pdf | 28 May 2021 |
| Building plan approvalFile: IOD Drawing CONVERTED.pdf | 27 May 2021 |
| Building plan approvalFile: IOD Drawing CONVERTED.pdf | 27 May 2021 |
| Building plan approvalFile: 1.pdf | 27 May 2021 |
| Building plan approvalFile: 2.pdf | 27 May 2021 |
| Building plan approvalFile: 3.pdf | 27 May 2021 |
| Building plan approvalFile: 5.pdf | 27 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing CONVERTED.pdf | 27 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing CONVERTED.pdf | 27 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 1.pdf | 27 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 27 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 27 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 27 May 2021 |
| Proforma of Allotment letterFile: BELLA booking form_compressed_1.pdf | 27 May 2021 |
| Proforma of Allotment letterFile: BELLA booking form_compressed_2.pdf | 27 May 2021 |
| Layout approvalFile: IOD letter signed.pdf | 25 May 2021 |
| PAN CardFile: Luceat Realtors PAN.pdf | 25 May 2021 |
| Copy of the legal title reportFile: RERA Title Certificate Luceat FORMAT A.pdf | 25 May 2021 |
| Details of encumbrancesFile: Luceat Encumbrance Certificate C D.pdf | 25 May 2021 |
| Copy of Layout Approval (in case of layout)File: IOD letter signed.pdf | 25 May 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: BELLA CC FOR CD WING.pdf | 25 May 2021 |
| Declaration in FORM BFile: Form-B- BELLA WING CD.pdf | 25 May 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate BELLA CD.pdf | 25 May 2021 |
| Proforma of Allotment letterFile: Bella C D AFS DECLARATION.pdf | 25 May 2021 |
| OtherFile: SRO CERTIFICATE BELLA -RPM_MCHI_518000_MSUB_781.pdf | 25 May 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep BELLA - WING C AND D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near S/WEST WARD6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 188 registered projects within 2 km.
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai Suburban project, with the district possession charts
Builder: LUCEAT REALTORS PRIVATE LIMITED
LUCEAT REALTORS PRIVATE LIMITED has 2 registrations on MahaRERA, including BELLA - WING C AND D and BELLA- WING A AND B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that BELLA - WING C AND D shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BELLA - WING C AND D is delayed beyond 1 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BELLA - WING C AND D?
The registered promoter entity is LUCEAT REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BELLA - WING C AND D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against BELLA - WING C AND D?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for BELLA - WING C AND D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BELLA - WING C AND D?
The professionals named in the filing: Architect: MANISH SAVANT; Engineer: OPTIMAL CONSULTANCY SERVICES PVT LTD; Chartered Accountant: V A SHIMPI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BELLA - WING C AND D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback