ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / BELLA- WING A AND B

Completed Litigation declared Others project

BELLA- WING A AND B

By LUCEAT REALTORS PRIVATE LIMITED

RG-MH-29980 · RERA P51800031973 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2026Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
3 of 223Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 157 documents Report an error

BELLA- WING A AND B is a Others project by LUCEAT REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031973 on 29 Nov 2021. The registration is recorded completed; possession was promised by 1 Jul 2026. The completion date has moved by 6 months from the original filing. 220 of the 223 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameBELLA- WING A AND B
  • TypeOthers
  • Location
    • SUBHASH NAGAR BHANDUP WEST
    • S/WEST WARD
    • Bhandup
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800031973
  • ReraGenie IDRG-MH-29980

Builder

  • NameLUCEAT REALTORS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsVINEET JAWAHARLAL MEHTA, KARAN SURESH JOGANI, RAMESH TIKUCHAND JOGANI, JOHNSON FRANSIS ALMEIDA, NILESH BALKRISHNA NIMBALKAR
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2021First promiseJan 2026Revised toJul 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Nov 2021
  • Promised completion1 Jul 2026
  • Revised completionRevised to 1 Jul 2026 (originally 1 Jan 2026)
  • Buildings2 building records
  • Documents filed157 files

Current status

99%220 of 223 units booked
100.0%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BELLA WING ANA24239824122
BELLA WING BNA24231010101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

BELLA WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BELLA WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed172

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots172
Closed/Covered172
BuildingClosed/CoveredTotal
BELLA WING A8686
BELLA WING B8686

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,386 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10237.71
Proposed, not sanctioned10,238 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch349, Business Point Bldg, Andheri East, Mumbai 400069
Estimated costRs 180.77 cr
Cost incurredRs 180.77 cr
Work done100.0%
BuildingWingEstimatedIncurred
BELLA WING ANARs 90.07 crRs 90.07 cr
BELLA WING BNARs 90.07 crRs 90.07 cr
-NARs 62.75 lakhRs 62.75 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH D SAVANT
EngineerPRABHULAL CHOTANI
Chartered AccountantV A SHIMPI & ASSOCIATES
PartnerRole in project
LUCEAT REALTORS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30122519117Jan 2026 → Jul 2026

Reason as filed by the promoterDespite best efforts, due to circumstances beyond the control of the Promoter constituting Force Majeure, the CC for the 19th to 22nd Flrs of the Wings A and B was restricted. -The CC for the full project was updated regularly and on 13.05.2024 for Wings C&D (full) and upto 18th Flr for Wings A&B (remaining floors). Further, the CC of Wings A&B were restricted from the 19th to the 22nd flrs due to the requirement of release of FSI for the remaining floors from the environ clearance perspective. -The environ clearance for the remaining floors was already granted by the Sectoral Expert Appraisal

Litigation declared5

CaseCourtStatus
CHAMBER SUMMONS NO 934 OF 2013/2013CITY CIVIL COURT MUMBAIOngoing
CHAMBER ORDER NO 1183 OF 2019/2019BOMBAY HIGH COURTOngoing
LODGING NO 14292/2021BOMBAY HIGH COURTOngoing
CHAMBER SUMMONS NO 934 OF 2013/2013City Civil Court MumbaiOngoing
4538/2024City CivilOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed157

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 157 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 Bella A B.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Bella Wing A B.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3 Bella Wing A and B.pdf4 Jun 2026
Occupational CertificateFile: Bella Full OC 20032026.pdf4 Jun 2026
Occupational CertificateFile: OC PLAN 20032026.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Layout approvalFile: Ground Floor_Layout Plan.pdf27 Feb 2026
Building plan approvalFile: 1st Floor Plan.pdf27 Feb 2026
Building plan approvalFile: 2nd Floor Plan.pdf27 Feb 2026
Building plan approvalFile: 3rd Floor Plan.pdf27 Feb 2026
Building plan approvalFile: 4th Floor Plan.pdf27 Feb 2026
Building plan approvalFile: 5th-22nd Floor Plan.pdf27 Feb 2026
Building plan approvalFile: 8th Floor Plan.pdf27 Feb 2026
Building plan approvalFile: 11th Floor Plan.pdf27 Feb 2026
Building plan approvalFile: 15th Floor Plan.pdf27 Feb 2026
Building plan approvalFile: 20th Floor Plan.pdf27 Feb 2026
Building plan approvalFile: Amended IOD Letter.pdf24 Feb 2026
Form 1File: Form 1 2022 Q1.pdf29 Dec 2025
Form 2File: Form 2 2022 Q1.pdf29 Dec 2025
Form 3File: Form 3 2022 Q1.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Sold Unsold 2022 Q1.pdf29 Dec 2025
Form 1File: Form 1 2022 Q4.pdf29 Dec 2025
Form 2File: Form 2 2022 Q4.pdf29 Dec 2025
Form 3File: Form 3 2022 Q4.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Sold Unsold 2022 Q4.pdf29 Dec 2025
Form 1File: Form 1 2023 Q4.pdf29 Dec 2025
Form 2File: Form 2 2023 Q4.pdf29 Dec 2025
Form 3File: Form 3 2023 Q4.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Dosclosures Sold Unsold 2023 Q4.pdf29 Dec 2025
Form 1File: Form 1 2024 Q1.pdf29 Dec 2025
Form 2File: Form 2 2024 Q1.pdf29 Dec 2025
Form 3File: Form 3 2024 Q1.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Sold Unsold 2024 Q1.pdf29 Dec 2025
Form 1File: Form 1 2023 Q2.pdf29 Dec 2025
Form 2File: Form 2 2023_AB Q2.pdf29 Dec 2025
Form 3File: Form 3 2023 Q2.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Sold Unsold 2023 Q2.pdf29 Dec 2025
Form 1File: Form 1 2023 Q3.pdf29 Dec 2025
Form 2File: Form 2 2023_AB Q3.pdf29 Dec 2025
Form 3File: Form 3 2023 Q3.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Sold Unsold 2023 Q3.pdf29 Dec 2025
Form 1File: Form 1 2023 Q3.pdf29 Dec 2025
Form 2File: Form 2 2023_AB Q3.pdf29 Dec 2025
Form 3File: Form 3 2023 Q3.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Sold Unsold 2023 Q3.pdf29 Dec 2025
Form 1File: Form 1 2021 Q4.pdf29 Dec 2025
Form 2File: Form 2 2021 Q4.pdf29 Dec 2025
Form 3File: Form 3 2021 Q4.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Bella Dec 21 Disclosure.pdf29 Dec 2025
Form 1File: Form 1 2021 Q3.pdf29 Dec 2025
Form 2File: Form 2 2021 Q4.pdf29 Dec 2025
Form 3File: Form 3 Wing A_B 2021 Q3.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Sold Unsold 2021 Q3.pdf29 Dec 2025
Form 1File: FORM 1 wing A_B 2022 Q3.pdf29 Dec 2025
Form 2File: Form 2 2022 Q3.pdf29 Dec 2025
Form 3File: FORM 3 A_B 2022 Q3.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Discolsure Bella A_B Dec 22.pdf29 Dec 2025
Form 1File: Form 1 2022 Q2.pdf29 Dec 2025
Form 2File: Form 2 2022 Q2.pdf29 Dec 2025
Form 3File: Form 3 Bella A_B Sep 22 Q2.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Discolsure Bella A_B Sep 22.pdf29 Dec 2025
Form 1File: Form 1 2022 Q1.pdf29 Dec 2025
Form 2File: Form 2 2022 Q1.pdf29 Dec 2025
Form 3File: Form 3 2022 Q1.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Sold Unsold 2022 Q1.pdf29 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf29 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf29 Dec 2025
Form 2A (FY 2022-2023)File: Form 2A_Mar 2023.pdf29 Dec 2025
Form 2A (FY 2021-2022)File: 1 FORM 2A MARCH CD_AB 2022.pdf29 Dec 2025
Form 2A (FY 2025-2026)File: Form 2A A_B 2025_26.pdf29 Dec 2025
Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf29 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf29 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf29 Dec 2025
Form 1File: MAHARERA FORM 1 Wing A_B up to 31032025.pdf26 Dec 2025
Form 2File: Form 2 Bella Wing AB Q4.pdf26 Dec 2025
Form 3File: Form 3 Bella Wing AB Q4.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Bella Wing AB Q4.pdf26 Dec 2025
Form 1File: FORM 1 wing A_B up to 30092025 Q2.pdf22 Dec 2025

How this compares with Mumbai Suburban

99%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BELLA- WING A AND B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near S/WEST WARD6,700+ in Mumbai Suburban

2 kmBELLA- WING A AND BCompleted 49Lapsed / revoked 25Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: LUCEAT REALTORS PRIVATE LIMITED

LUCEAT REALTORS PRIVATE LIMITED has 2 registrations on MahaRERA, including BELLA - WING C AND D and BELLA- WING A AND B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if BELLA- WING A AND B is delayed beyond 1 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BELLA- WING A AND B?

The registered promoter entity is LUCEAT REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BELLA- WING A AND B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BELLA- WING A AND B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BELLA- WING A AND B?

The professionals named in the filing: Architect: MANISH D SAVANT; Engineer: PRABHULAL CHOTANI; Chartered Accountant: V A SHIMPI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BELLA- WING A AND B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BELLA- WING A AND B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BELLA- WING A AND B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.