BASIL MAXIMUS WING G

By BASIL AVANTE LLP

RG-MH-31757 · RERA P52100080092 · Last updated on MahaRERA portal: 6 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 80%
83 of 149Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

BASIL MAXIMUS WING G is a Residential / Group Housing project by BASIL AVANTE LLP in Pune, Maharashtra, registered with MahaRERA as P52100080092 on 23 Apr 2025. Possession is promised by 31 Dec 2029. 66 of the 149 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameBASIL MAXIMUS WING G
  • TypeResidential / Group Housing
  • Location
    • Punawale Village Road
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080092
  • ReraGenie IDRG-MH-31757

Builder

  • NameBASIL AVANTE LLP
  • Entity typePartnership
  • LLPINABB-7740
  • GSTIN27AAZFB8127G1ZY
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersCHETAN TANAJI MANGADE, KISAN SHIVRAJ VARMA, GOPAL SHIVRAJ VARMA, BASIL INFRA REALTY PRIVATE LTD, Ankit Soni
  • Other registrations4 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

44%66 of 149 units booked
5.0%Work done, per cost certificate

Figures as on 6 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING GNA23191490149

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 80%.

WING G: 24% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed318

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots318
Closed/Covered318

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,300 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jun 2025
LandownerVillageDistrict
P A INAMDARPune (M Corp.)Pune
PARVEZ INAMDARPune (M Corp.)Pune
ABEDA INAMDARPune (M Corp.)Pune
TANVEER INAMDARPune (M Corp.)Pune
IFTEKHAR INAMDARPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI17225.7
Proposed, not sanctioned17,226 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., 1194/8, Ramchandra Sabhamandap, Ghole Road , Shivaji Nagar, Pune.411005
Estimated costRs 59.62 cr
Cost incurredRs 3.00 cr
Work done5.03%
BuildingWingEstimatedIncurred
WING GNARs 54.44 crRs 2.94 cr
-NARs 5.18 crRs 5.50 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITECTS ASSOCIATES
EngineerCTM ENGINEER AND CONSULTANT
Chartered AccountantKJS and Associates
PartnerRole in project
Basil Avante LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: G Wing Architect Letter March 26.pdf6 Apr 2026
Withdrawal Update Form 2File: G Wing Engineer Certificate March 26.pdf6 Apr 2026
Withdrawal Update Form 3File: G Wing CA Certificate March 26.pdf6 Apr 2026
Withdrawal Update Form 1File: Architect Certificate ( Wing G).pdf22 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate G wing.pdf22 Jan 2026
Withdrawal Update Form 3File: CA Certificate Wing G_compressed.pdf22 Jan 2026
Withdrawal Update Form 1File: Basil Maximus Wing Wing G - Architect Certificate.pdf24 Dec 2025
Withdrawal Update Form 2File: Basil Maximus Wing Wing G - Engineer Certificate.pdf24 Dec 2025
Withdrawal Update Form 3File: Basil Maximus Wing Wing G - CA Certificate.pdf24 Dec 2025
Withdrawal Update Form 1File: Basil_Maximus_Wing_Wing D_u0026_E_Architect Certificate_Sep_25.pdf14 Oct 2025
Withdrawal Update Form 2File: Basil_Maximus_Wing_Wing_D_u0026_E_Engineer_Certificate_Sep_2025.pdf14 Oct 2025
Withdrawal Update Form 3File: Basil_Maximus_Wing_Wing_D_u0026_E_CA_Certificate_Sep_2025.pdf14 Oct 2025
Withdrawal Update Form 1File: Architects Certificate The Basil Avante LLP Wing G.pdf31 Jul 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate - Basil Maximus Wing G_compressed.pdf31 Jul 2025
Withdrawal Update Form 3File: CA Certificate - Basil Maximus Wing G.pdf31 Jul 2025
Building plan approvalFile: 1 (1) (1)_compressed.pdf2 May 2025
Building plan approvalFile: 1 (24).pdf2 May 2025
Building plan approvalFile: 1 (25).pdf2 May 2025
Building plan approvalFile: 1 (1) (1)_compressed.pdf2 May 2025
Building plan approvalFile: 1 (24).pdf2 May 2025
Building plan approvalFile: 1 (25).pdf2 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 (1) (1)_compressed.pdf2 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 (24).pdf2 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 (25).pdf2 May 2025
Other - TechnicalFile: DD.pdf21 Apr 2025
Layout approvalFile: Layout Plan_compressed.pdf14 Apr 2025
Building plan approvalFile: Layout Plan_compressed.pdf14 Apr 2025
Copy of Layout Approval (in case of layout)File: Layout Plan_compressed.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan_compressed.pdf14 Apr 2025
Other - TechnicalFile: Declaration.pdf12 Apr 2025
Other - LegalFile: Purawani kararnama Punawale dasta no 2725-2024 (1) - converted.pdf8 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf4 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf4 Apr 2025
Deviation Report with respect to Allotment letterFile: Self Declaration No Deviation in Allotment Letter Format.pdf30 Nov 2024
Other - FinanceFile: Self - Declaration - Revenue Share Basil Maximus G Wing.pdf30 Nov 2024
Building plan approvalFile: G Wing 1st floor Plan.pdf19 Nov 2024
Building plan approvalFile: G Wing - Refuge Floor Plan 5thFloor ,10th Floor.pdf19 Nov 2024
Proforma of Allotment letterFile: New Allotment.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Basil Maximus G wing CA Certificate.PDF19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: G Wing 1st floor Plan.pdf19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: G Wing - Refuge Floor Plan 5thFloor ,10th Floor.pdf19 Nov 2024
Other - LegalFile: LAND OWNERS DECLARATION.pdf19 Nov 2024
Proforma of Agreement for saleFile: AOS.pdf19 Nov 2024
Other - TechnicalFile: CC VERIFICATION.pdf11 Nov 2024
Copy of the legal title reportFile: Search AND Title Investigation Report rera_compressed.pdf7 Nov 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate .pdf7 Nov 2024
Other - TechnicalFile: Annexure A - Declaration Cum Undertaking G Wing.pdf7 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Self Declaration No Deviation in Agreement to sale Format.pdf7 Nov 2024
Layout approvalFile: Layout Sanction Plan.pdf22 Oct 2024
Building plan approvalFile: G Wing 1st floor Plan.pdf22 Oct 2024
PAN CardFile: 1 PAN Card.pdf22 Oct 2024
Details of encumbrances concerned to FinanceFile: Self Declaration about No Legal Litigation Encumbrances.pdf22 Oct 2024
Details of encumbrances concerned to FinanceFile: Self Declaration about Financial Non - Encumbrances.pdf22 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout Sanction Plan.pdf22 Oct 2024
Declaration in FORM BFile: FORM B DEVELOPER.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Basil Maximus Wing G.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - Basil Maximus Wing G_compressed.pdf22 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 30-2024 (Punawale).pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: G Wing 1st floor Plan.pdf22 Oct 2024
CERSAI detailsFile: Self Declaration No CERSAI Report.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: Self Declaration about Financial Non - Encumbrances.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: Self Declaration about No Legal Litigation Encumbrances.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organizations - Kisan Sir.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organizations - Chetan Sir.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organizations - GOPAL VARMA.pdf22 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured - unsecured finance availed for the project.pdf22 Oct 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
BASIL MAXIMUS WING FP52100056356-, Pune152May 2024OngoingDec 2028Not due yet
BASIL MAXIMUS WING D AND EP52100051323PUNAWALE, Pune305Jun 2023OngoingDec 2027Not due yet
BASIL MAXIMUS WING CP52100050916Punawale, Pune48May 2023OngoingDec 2026Not due yet

How this compares with Pune

44%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BASIL MAXIMUS WING G on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punawale13,700+ in Pune

2 kmBASIL MAXIMUS WING GCompleted 65Lapsed / revoked 35Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: BASIL AVANTE LLP

BASIL AVANTE LLP has 5 registrations on MahaRERA, including BASIL MAXIMUS WING C and BASIL MAXIMUS WING D AND E. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BASIL MAXIMUS WING G is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BASIL MAXIMUS WING G?

The registered promoter entity is BASIL AVANTE LLP, a partnership as per the filing. Its LLPIN ABB-7740 and GSTIN 27AAZFB8127G1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BASIL MAXIMUS WING G?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BASIL MAXIMUS WING G?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BASIL MAXIMUS WING G?

The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: CTM ENGINEER AND CONSULTANT; Chartered Accountant: KJS and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BASIL MAXIMUS WING G?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BASIL MAXIMUS WING G. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BASIL MAXIMUS WING G to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.