Home / Browse projects / Thane, Maharashtra / Balaji Siddhivinayak Complex Building No. 1 B Wing
Balaji Siddhivinayak Complex Building No. 1 B Wing
RG-MH-67790 · RERA P51700018430 · Last updated on MahaRERA portal: 29 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Completion date moved by 9 months
- 1 extension taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Balaji Siddhivinayak Complex Building No. 1 B Wing is a Residential / Group Housing project by M/s Onkareshwar Developers in Thane, Maharashtra, registered with MahaRERA as P51700018430 on 1 Nov 2018. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 9 months from the original filing. 124 of the 168 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameBalaji Siddhivinayak Complex Building No. 1 B Wing
- TypeResidential / Group Housing
- Location
- Mahatma Phule Road
- Gaondevi - Dombivli West
- DOMBIVLI
- Kalyan
- Thane
- 421202
- Pincode421202
- RERA no.P51700018430
- ReraGenie IDRG-MH-67790
Builder
- NameM/s Onkareshwar Developers
- Entity typePartnership
- PartnersAjay Ramnarayan Singh, Anil Tulsiram Bhoir
- Other registrations1 more →
- Completed1 of 2
- Past their filed date1
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Nov 2018
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 30 Dec 2025)
- Buildings1 building record
- Documents filed212 files
Current status
Figures as on 29 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Balaji Siddhivinayak Complex Building No 1 B Wing | NA | 26 | 25 | 168 | 0 | 168 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.
Balaji Siddhivinayak Complex Building No 1 B Wing: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 97% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 97% |
Progress on shared amenities15
As on 29 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| M/s Siddhivinayak Developers | DOMBIVLI | Thane |
| Dilip Kashinath More | DOMBIVLI | Thane |
| Vijay Babu Mhatre | DOMBIVLI | Thane |
| Kisan Babu Mhatre | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Balaji Siddhivinayak Complex Building No 1 B Wing | NA | Rs 35.23 cr | Rs 29.53 cr |
| - | NA | Rs 75.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | De Con Associates |
| Engineer | Arvind Patel |
| Engineer | Amit Ansari |
| Chartered Accountant | Kapyre and Kapure |
| Chartered Accountant | Patel Patel and Co |
| Partner | Role in project |
|---|---|
| M/s Onkareshwar Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project was registered with the Maharashtra Real Estate Regulatory Authority in November 2018, with an estimated completion timeline up to 30/12/2025. We hereby seek an extension of the project timeline up to 30/09/2026 under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. The construction of the project has been completed, and the Occupancy Certificate has been obtained as of 25/02/2026. Possession has also been handed over to allottees. All requisite NOCs have been duly submitted by the Promoter, and there are no pending compliances on the part of the Promoter. As
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 267/2019 | Hon Civil Judge Senior Division Kalyan | Pending |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000120934 | Bharat Dattu Bhoir | M/s Onkareshwar Developers | 16/09/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed212
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 212 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: OD- B Wing - Form 1 - Dt 01-04-2026.pdf | 29 Aug 2026 |
| Withdrawal Update Form 1File: OD- B Wing - Form 1 - Dt 01-04-2026.pdf | 29 Aug 2026 |
| Withdrawal Update Form 2File: OD -B Wing- Form 2 - Dt 22-04-2026.pdf | 29 Aug 2026 |
| Withdrawal Update Form 2File: OD -B Wing- Form 2 - Dt 22-04-2026.pdf | 29 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Balaji Siddhivinayak B wing March 26.pdf | 29 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Balaji Siddhivinayak B wing March 26.pdf | 29 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form -2A - Balaji Siddhivi B Wing March 2026.pdf | 3 Jul 2026 |
| Form 1File: OD - B Wing - Form 1 - Dt 01012024.pdf | 24 Mar 2026 |
| Form 2File: Form 2 Balaji siddhivinayak B wing Dec 23.pdf | 24 Mar 2026 |
| Form 3File: Form 3 OD_compressed.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory OD B WIng Dec 2023_c.pdf | 24 Mar 2026 |
| Form 1File: OD- B wing - From 1 Dt 01-04-2024 .pdf | 24 Mar 2026 |
| Form 2File: Balaji Siddhivinayak - Form 2- Dt - 31-05-2024.pdf | 24 Mar 2026 |
| Form 3File: Balaji Siddhivinay B wing Form 3 march 2024_compressed.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Siddhivinayak B wing.pdf | 24 Mar 2026 |
| Form 1File: OD - B Wing - Form 1 Dt - 01-07-2024 .pdf | 24 Mar 2026 |
| Form 2File: Balaji Siddhivinayak - B Wing - Form 2 - Dt 26-07-2024.pdf | 24 Mar 2026 |
| Form 3File: Balaji Siddhivinayak B Wing - Form 3 - Dt 30-06-2024_compressed.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory Balaji Siddhivinayak B Wing Jun24.pdf | 24 Mar 2026 |
| Form 1File: Form 1 Siddhivinayak B wing sept 2024.pdf | 24 Mar 2026 |
| Form 2File: Form 2 Siddhivinayak B wing Sept 24.pdf | 24 Mar 2026 |
| Form 3File: Form 3 Balaji Siddhivinayak Sept 2024.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Balaji siddhivinayak B wing.pdf | 24 Mar 2026 |
| Form 1File: Form 1 Balaji Siddhivinayak B wing Dec 24.pdf | 24 Mar 2026 |
| Form 2File: Form - 2 - OD - B Wing - Dt 25 - 01 -2025 .pdf | 24 Mar 2026 |
| Form 3File: Form 3 Siddhivinayak B wing Dec 2024_compressed.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory Siddhivinayak Bwing Dec 2024.pdf | 24 Mar 2026 |
| Form 1File: OD B Wing- Form 1 -Dt 01-04-2025 .pdf | 24 Mar 2026 |
| Form 2File: Form -2 - Balaji Siddhivinayak - B Wing -Dt - 17-04-2025.pdf | 24 Mar 2026 |
| Form 3File: Signed Form 3 Siddhivinayak March 2025_compressed.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory disclosure siddhivinayak B wing march 2025.pdf | 24 Mar 2026 |
| Form 1File: OD B Wing- Form 1 -Dt 01-04-2025 .pdf | 24 Mar 2026 |
| Form 2File: Form -2 - Balaji Siddhivinayak - B Wing -Dt - 17-04-2025.pdf | 24 Mar 2026 |
| Form 3File: Signed Form 3 Siddhivinayak March 2025_compressed.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory disclosure siddhivinayak B wing march 2025.pdf | 24 Mar 2026 |
| Form 1File: OD - B Wing - Form 1 - Dt 01-10-2025.pdf | 24 Mar 2026 |
| Form 2File: Form 2 Balaji Siddhivinayak B wing sept 25.pdf | 24 Mar 2026 |
| Form 3File: OD FORM 3 SEP 25_compressed.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Balaji Siddhivinayak B Wing - Sold AND Unsold Inventory Dt 30-09-2025.pdf | 24 Mar 2026 |
| Form 1File: Balaji Siddhivinayak - B Wing - Form 1 Dt 20-01-2026.pdf | 24 Mar 2026 |
| Form 2File: Form 2 - OD - Dt 23-01-2026.pdf | 24 Mar 2026 |
| Form 3File: Form - 3 OD B Wing Dt 31-12-2025.pdf | 24 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory disclosure Balaji siddhivinakay B Dec 25.pdf | 24 Mar 2026 |
| Form 2A (FY 2018-2019)File: B wing 31032019.pdf | 24 Mar 2026 |
| Form 2A (FY 2019-2020)File: B wing 31032020.pdf | 24 Mar 2026 |
| Form 2A (FY 2020-2021)File: B Wing 31032021.pdf | 24 Mar 2026 |
| Form 2A (FY 2021-2022)File: OD BALAJI SIDDHIVINAYAK B WING FORM 2A MAR 22.pdf | 24 Mar 2026 |
| Form 2A (FY 2022-2023)File: OD BALAJI SIDDHIVINAYAK B WING FORM 2A MAR 23.pdf | 24 Mar 2026 |
| Form 2A (FY 2023-2024)File: OD BALAJI SIDDHIVINAYAK B WING FORM 2A MAR 24.pdf | 24 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A Balaji Siddhivinayak B wing March 25.pdf | 24 Mar 2026 |
| Form 5 (FY 2018-2019)File: OD B wing -Form - 5 - 18-19.pdf | 24 Mar 2026 |
| Form 5 (FY 2019-2020)File: OD B wing -Form - 5 - 19-20.pdf | 24 Mar 2026 |
| Form 5 (FY 2020-2021)File: OD B wing -Form - 5 - 20-21.pdf | 24 Mar 2026 |
| Form 5 (FY 2021-2022)File: OD B wing -Form - 5 - 21-22.pdf | 24 Mar 2026 |
| Form 5 (FY 2022-2023)File: Form 5 22-23 OD.pdf | 24 Mar 2026 |
| Form 5 (FY 2023-2024)File: Form 5 Siddhivinyak B wing 23 24.pdf | 24 Mar 2026 |
| Form 5 (FY 2024-2025)File: Onkareshwar Developers - Form -5 -DT 30-09-2025.pdf | 24 Mar 2026 |
| Certificates of CA (Form 3)File: Signed Form 3 Siddhivinayak March 2025_compressed.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - Balaji Siddhivinayak - B Wing -Dt - 17-04-2025.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory disclosure siddhivinayak B wing march 2025.pdf | 30 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Siddhivinayak B wing Dec 24.pdf | 18 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Siddhivinayak B wing sept 2024.pdf | 29 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Balaji Siddhivinayak Sept 2024.pdf | 29 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Siddhivinayak B wing Dec 2024_compressed.pdf | 29 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Siddhivinayak B wing Sept 24.pdf | 29 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 - OD - B Wing - Dt 25 - 01 -2025 .pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Balaji siddhivinayak B wing.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Siddhivinayak Bwing Dec 2024_compressed.pdf | 29 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Siddhivinyak B wing 23 24.pdf | 8 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Siddhivinayak B wing sept 2024.pdf | 11 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OD - B Wing - Form 1 Dt - 01-07-2024 .pdf | 30 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Balaji Siddhivinayak - B Wing - Form 2 - Dt 26-07-2024.pdf | 30 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Balaji Siddhivinayak B Wing Jun24_compressed.pdf | 30 Jul 2024 |
| Certificates of CA (Form 3)File: Balaji Siddhivinayak B Wing - Form 3 - Dt 30-06-2024_compressed.pdf | 30 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OD- B wing - From 1 Dt 01-04-2024 .pdf | 3 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: OD BALAJI SIDDHIVINAYAK B WING FORM 2A MAR 24.pdf | 18 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Balaji Siddhivinayak - Form 2- Dt - 31-05-2024.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Siddhivinayak B wing.pdf | 6 Jun 2024 |
| Certificates of CA (Form 3)File: Balaji Siddhivinay B wing Form 3 march 2024_compressed.pdf | 6 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OD - B Wing - Form 1 - Dt 01012024.pdf | 12 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 212 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Balaji Siddhivinayak Complex Building No. 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Gaondevi - Dombivli West7,600+ in Thane
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: M/s Onkareshwar Developers
M/s Onkareshwar Developers has 2 registrations on MahaRERA, including Balaji Siddhivinayak Complex Building No. 1 A Wing and Balaji Siddhivinayak Complex Building No. 1 B Wing. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Balaji Siddhivinayak Complex Building No. 1 B Wing is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Balaji Siddhivinayak Complex Building No. 1 B Wing?
The registered promoter entity is M/s Onkareshwar Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Balaji Siddhivinayak Complex Building No. 1 B Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Balaji Siddhivinayak Complex Building No. 1 B Wing?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Balaji Siddhivinayak Complex Building No. 1 B Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Balaji Siddhivinayak Complex Building No. 1 B Wing?
The professionals named in the filing: Architect: De Con Associates; Engineer: Arvind Patel; Engineer: Amit Ansari; Chartered Accountant: Kapyre and Kapure; Chartered Accountant: Patel Patel and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Balaji Siddhivinayak Complex Building No. 1 B Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback