Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Stilt Floor, 95%
96 of 232Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Balaji Residency 2 is a Residential / Group Housing project by Om Swayambhu Siddhivinayak Builders and Developers in Thane, Maharashtra, registered with MahaRERA as P51700047050 on 27 Sep 2022. Possession is promised by 31 Dec 2027. 136 of the 232 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameBalaji Residency 2
  • TypeResidential / Group Housing
  • Location
    • Kanchangaon
    • Dombivli East
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700047050
  • ReraGenie IDRG-MH-49763

Builder

  • NameOm Swayambhu Siddhivinayak Builders and Developers
  • Entity typePartnership
  • PartnersSarvesh Ravindra Raut, Sachin Arun Kulkarni, Parag Arun Kulkarni, Krishnadas Kuttan Gurukal, Anil Tulsiram Bhoir
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Sep 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Current status

59%136 of 232 units booked
50.0%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Balaji Residency 2NA31292320232

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

Balaji Residency 2: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed228

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots228
Closed/Covered98
Open Space130

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,880 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Dec 2025
LandownerVillageDistrict
Satyavan fardeDOMBIVLIThane
Janardhan PatilDOMBIVLIThane
Sharad PatilDOMBIVLIThane
Shashikant PatilDOMBIVLIThane
Shalik MhatreDOMBIVLIThane
Harishchandra GaikwadDOMBIVLIThane
Rama GaikwadDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION
Permissible FSI15758.11
Proposed, not sanctioned15,758 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDombivli west 421201
Estimated costRs 64.76 cr
Cost incurredRs 32.36 cr
Work done49.96%
BuildingWingEstimatedIncurred
Balaji Residency 2NARs 64.26 crRs 32.36 cr
-NARs 50.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSTHAPATYA NIRMAAN
EngineerSHANTI CONSTJUTANTS
Chartered AccountantKapure & Kapure chartered accountats
Chartered AccountantC D Phadke
PartnerRole in project
Om Swayambhu Siddhivinayak Builders and Developers-

Litigation declared1

CaseCourtStatus
390/2007Civil Court Junior Divison KalyanPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Balaji Residency- 2 - Dt 01-04-2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Balaji Residency 2 - Form 2 - Dt 22-04-2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 Residency 2 March 26.pdf28 Apr 2026
Withdrawal Update Form 1File: Balaji Residency 2 - Form 1 - DT 01-01-2026.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2- Balaji Residency 2 - Dt 28-01-2026.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 Residency 2 Dec 25_compressed.pdf3 Feb 2026
Withdrawal Update Form 1File: Balaji Residency - 2 - Form 1 - Dt 01-07-2025.pdf28 Jan 2026
Withdrawal Update Form 1File: Balaji Residency - 2 Form 1 - Dt 01102025.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 Residency 2 June 25.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 Residency 2 Sept 25.pdf28 Jan 2026
Withdrawal Update Form 3File: OSSBD BR2 FORM 3 JUN 2025_compressed.pdf28 Jan 2026
Withdrawal Update Form 3File: Sigedn Form 3 - Sept 25_compressed.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: OSS - Form 5 - Residency 2 Dt 1-04-2024 To 31-03-2025.pdf6 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Balaji Residency-2 - Date 01-04-2025.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Residency 2 march 25_compressed.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Balaji Residency 2 - Date 01-04-2025.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory disclosure March 2025_compressed.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Residency 2 - Form 2 - Dt 01-01-2025.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Residency -2 - Form 1 - Dt 01-01-2025 .pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Residency 2 Dec 2024_compressed.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Residency -2 - Form 1 - Dt 01-01-2025 .pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Residency 2 2023 24.pdf21 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: OSSBD Balaji Residency 2.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Residency 2 Sept 2024.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory Residency 2 sept 24.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory Residency 2 sept 24.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Residency 2 - Form 2 - DT - 30-07-2024.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Residency 2 - Form 1 - Dt 01-07-2024.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: Balaji Residency 2 - Sold UNsold.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Balaji Residency 2 - Form 3 - Dt 30-06-2024_compressed.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OSSBD FORM 2 OF BR2.pdf12 Jun 2024
Disclosure of sold/ booked inventoryFile: OSSBD BR2 MRL SOLD UNSOLD SHEET_compressed.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: OSSBD BR 2 SOLD UNSOLD INVETORY MAR 24_compressed.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Balaji Residency Mar 2024_compressed.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Balaji Residency 2 - Dt 01-04-2024.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Residency 2 - Form 1 Dt 01012024.pdf19 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Balaji Residency2 Dec 23.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OSSBD BR2_compressed.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Balaji Residency 2 sept 2023.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Residency 2 Sept 2023-Promoter acceptance.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Residency 2 2022 23.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Residency 2 - Form 1 - 01102023.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Balaji Residency 2 June 2023_compressed.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Residency June 2023-1-6_compressed.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Residency June 2023-7-13_compressed.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Residency 2 - Form - 1 - Dt - 01072023.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: OSSBD BR 2 FORM 2A MAR 23.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Residency 2 - Form - 1 - 01012023.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Residency 2 - Form - 1 - Dt - 01042023.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Residency 2 - Form 2 - 01012023_compressed.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Residency 2 - Form 2 - 01042023_compressed.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Balaji Recidency Dec 22-1-6_compressed.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Balaji Recidency Dec 22-7-12_compressed.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Balaji Recidency Mar 23-1-6_compressed.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Balaji Recidency Mar 23-7-12_compressed.pdf27 Sep 2023
Copy of the legal title reportFile: 93-5 search and title.pdf24 Aug 2022
Copy of the legal title reportFile: OSSBD 92- TITLE SEARCH.pdf24 Aug 2022
Copy of the legal title reportFile: OSSBD 93-3 TITLE SEARCH.pdf24 Aug 2022
Copy of the legal title reportFile: OSSBD-91 TITLE SEARCH.pdf24 Aug 2022
Details of encumbrances concerned to LegalFile: Declaration of Legal For Project (New).pdf24 Aug 2022
Copy of the legal title reportFile: Search Report_compressed.pdf13 Aug 2022
Proforma of Allotment letterFile: ATS(NEW).pdf12 Aug 2022
Proforma of Allotment letterFile: Allotment letter-BALAJI RESIDENCY 2-RERA.pdf12 Aug 2022
Copy of the legal title reportFile: Title- Balaji residency 2_compressed.pdf3 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_1.pdf25 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3_2.pdf25 Jul 2022
CERSAI detailsFile: CERSAI.pdf21 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form- 2.pdf20 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration report for bank account.pdf20 Jul 2022
Deviation Report with respect to Allotment letterFile: Deviation report for Allotment report.pdf20 Jul 2022
Deviation Report with respect to model copy of AgreementFile: Deviation report for Draft agreement.pdf20 Jul 2022
Layout approvalFile: Plans sheet 1.pdf15 Jul 2022
Layout approvalFile: Plans Sheet 2.pdf15 Jul 2022
Building plan approvalFile: Plans sheet 1.pdf15 Jul 2022

How this compares with Thane

59%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Balaji Residency 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivli East7,600+ in Thane

Builder: Om Swayambhu Siddhivinayak Builders and Developers

OM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including BALAJI RESIDENCY and Balaji Residency 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Balaji Residency 2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Balaji Residency 2?

The registered promoter entity is Om Swayambhu Siddhivinayak Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Balaji Residency 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Balaji Residency 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Balaji Residency 2?

The professionals named in the filing: Architect: STHAPATYA NIRMAAN; Engineer: SHANTI CONSTJUTANTS; Chartered Accountant: Kapure & Kapure chartered accountats; Chartered Accountant: C D Phadke. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Balaji Residency 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Balaji Residency 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Balaji Residency 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.