Home / Browse projects / Thane, Maharashtra / Balaji Kanha

Registered No litigation declared Residential / Group Housing project

Balaji Kanha

By Sai Balaji Enterprises

RG-MH-77118 · RERA P51700048490 · Last updated on MahaRERA portal: 3 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
83 of 193Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Balaji Kanha is a Residential / Group Housing project by Sai Balaji Enterprises in Thane, Maharashtra, registered with MahaRERA as P51700048490 on 3 Jan 2023. Possession is promised by 31 Dec 2027. 110 of the 193 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameBalaji Kanha
  • TypeResidential / Group Housing
  • Location
    • Kanchangaon
    • Dombivli west
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700048490
  • ReraGenie IDRG-MH-77118

Builder

  • NameSai Balaji Enterprises
  • Entity typePartnership
  • PartnersAjay Ramnarayan Singh, Deepak Chetandas Sawlani
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed88 files

Current status

57%110 of 193 units booked
63.9%Work done, per cost certificate

Figures as on 3 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA24241845189
Building No 2NA55404

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building No 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed71

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots71
Closed/Covered67
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
Building No 164468
Building No 2303

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,630 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025
LandownerVillageDistrict
Thakubai Gauru PatilDOMBIVLIThane
Ravindra Gauru PatilDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI12274.66
Proposed, not sanctioned12,275 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3,4,5 AND 6 ON GND FLR AND OFFICE 4 AND 5 ON 1ST FLR , PATEL ESTATE , NEAR GANDHI CHOWK , BAZAR PETH ROAD , KALYAN - 421301
Estimated costRs 49.04 cr
Cost incurredRs 31.35 cr
Work done63.93%
BuildingWingEstimatedIncurred
Building No 1NARs 24.27 crRs 15.68 cr
Building No 2NARs 24.27 crRs 15.68 cr
-NARs 50.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSthapatya Nirmaan
EngineerShanti Consultants
EngineerPratahmesh Shivaji Patil
Chartered AccountantKapure and Kapure
Chartered AccountantPatel Patel & Co. Chartered Accountant
PartnerRole in project
Sai Balaji Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form -2A - Balaji Kanha March 2026.pdf3 Jul 2026
Withdrawal Update Form 1File: Form 1 - Balaji Kanha - Dt 01-04-2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Balaji Kanha - Form 2 - Dt 22-04-2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 Balaji Kanha March 26.pdf28 Apr 2026
Withdrawal Update Form 1File: Balaji kanha - Form 1 - Dt 01-01-2026.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 - Balaji Kanha - Dt 23-01-2026.pdf28 Jan 2026
Withdrawal Update Form 3File: Form - 3 Balaji Kanha Dt 31-12-2025.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: Balaji Kanha - Form 5 - Dt 30-09-2025.pdf22 Dec 2025
Withdrawal Update Form 1File: Balaji Kanha Form 1 - Dt 01102025.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2 Balaji Kanha Sept 25.pdf7 Nov 2025
Withdrawal Update Form 3File: SBE KANHA FORM 3 SEPT 25_compressed.pdf7 Nov 2025
Withdrawal Update Form 1File: Balaji kanha - From 1 - Dt - 01-07-2025.pdf23 Aug 2025
Withdrawal Update Form 2File: Form 2 kanha June 25.pdf23 Aug 2025
Withdrawal Update Form 3File: Form 3 Balaji Kanha June 2025_compressed.pdf23 Aug 2025
Form 1File: Form 1 - Balaji Kanha - Dt 01-04-2025.pdf20 Jun 2025
Form 2File: Form -2 - Balaji Kanha -Dt - 17-04-2025.pdf20 Jun 2025
Form 3File: Signed Form 3 Balaji Kanha march 2025compressed.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory dislosure balaji kanha march 2025_compressed.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Balaji Kanha - Dt 01-04-2025.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Balaji Kanha march 2025_compressed.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 - Balaji Kanha -Dt - 17-04-2025.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory dislosure balaji kanha march 2025_compressed.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kanha Dec 2024_compressed.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Balaji Kanha - Dt 25 - 01 -2025 .pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Kanha Dec 2024_compressed.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Kanha- Form 1 - Dt 01-01-2025 .pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 kanha 23 24 .pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Kanha Form 1 01102024.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Balaji kanha - Form 3 - 30092024_compressed.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Kanha - Form 2 19102024.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory disclosure Balaji Kanha sept 2024.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Kanha - Form 1 - Dt 01-07-2024.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Kanha - Form 2 - Dt 26-07-2024.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Balaji Kanha Jun 24_compressed.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Balaji Kanha - Form 3 - Dt 30-06-2024_compressed.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SBE KANHA FORM 2A MAR 24.pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Balaji Kanha March 2024.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: Inventory Dislosiure of Balaji Kanha.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Balaji Kanha March 2024.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Kanha - Form 1 - Dt 01-04-2024.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Kanha - Form 1 - Dt - 01012024.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 balaji kanha Dec 23.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: sbe - kanha SOLD UNSOLD SHEET_compressed.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SBE Kanha_compressed.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Kanha Form -1 - 01102023_compressed.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Balaji Kanha Sept 2023_compressed.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Balaji Kanha September 2023_1.pdf21 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Balaji Kanha 22 23.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Kanha Form 2 - 01072023_compressed.pdf3 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SBE KANHA FORM 2A MAR 23.pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Balaji Kanha - June 2023-1-6.pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Balaji Kanha - June 2023-7-12.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Kanha - Form - 1 - Dt - 010423_compressed.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Kanha- Form - 1 - Dt - 010723_compressed.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Kanha - Form - 2_compressed.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: kanha Form 3 March 2023-1.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: kanha Form 3 March 2023-2.pdf21 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT - A - DECLARATION ABOUT BANK Account.pdf20 Dec 2022
Other - FinanceFile: Balaji Kanha - Explanation for thre query.pdf20 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Kanha Revised_compressed.pdf19 Dec 2022
Layout approvalFile: PLan 1.pdf3 Dec 2022
Layout approvalFile: Plan 2.pdf3 Dec 2022
Layout approvalFile: Plan 3.pdf3 Dec 2022
Building plan approvalFile: PLan 1.pdf3 Dec 2022
Building plan approvalFile: Plan 2.pdf3 Dec 2022
Building plan approvalFile: Plan 3.pdf3 Dec 2022
PAN CardFile: SBE NEW PAN.pdf3 Dec 2022
Copy of the legal title reportFile: Title Report- Balaji Kanha.pdf3 Dec 2022
Details of encumbrances concerned to FinanceFile: FORMAT - A - DECLARATION OF no encumbrance to Finance.pdf3 Dec 2022
Details of encumbrances concerned to FinanceFile: Declaration of no encumbrances Concerned To Legal.pdf3 Dec 2022
Details of encumbrances concerned to LegalFile: FORMAT - A - DECLARATION OF no encumbrance to Finance.pdf3 Dec 2022
Details of encumbrances concerned to LegalFile: Declaration of no encumbrances Concerned To Legal.pdf3 Dec 2022
Copy of Layout Approval (in case of layout)File: PLan 1.pdf3 Dec 2022
Copy of Layout Approval (in case of layout)File: Plan 2.pdf3 Dec 2022
Copy of Layout Approval (in case of layout)File: Plan 3.pdf3 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: PLan 1.pdf3 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf3 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf3 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 Dec 2022
Declaration about Commencement CertificateFile: DECLARATION of CC.pdf3 Dec 2022

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Balaji Kanha on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivli west7,600+ in Thane

Builder: Sai Balaji Enterprises

Sai Balaji Enterprises has 3 registrations on MahaRERA, including Balaji Gopal and Balaji Govind. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Balaji Kanha is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Balaji Kanha?

The registered promoter entity is Sai Balaji Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Balaji Kanha?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Balaji Kanha?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Balaji Kanha?

The professionals named in the filing: Architect: Sthapatya Nirmaan; Engineer: Shanti Consultants; Engineer: Pratahmesh Shivaji Patil; Chartered Accountant: Kapure and Kapure; Chartered Accountant: Patel Patel & Co. Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Balaji Kanha?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Balaji Kanha. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Balaji Kanha to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.