ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / BALAJI APARTMENT

Registered No litigation declared Residential / Group Housing project

BALAJI APARTMENT

By TRIDEV REALTY AND CONSTRUCTION PVT LTD

RG-MH-34905 · RERA P51800011083 · Last updated on MahaRERA portal: 21 Jul 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
9 of 11Construction stages donefurthest along: Installation of Lifts, 99%
0Complaints at MahaRERAon this registration
Jump to the 147 documents Report an error

BALAJI APARTMENT is a Residential / Group Housing project by TRIDEV REALTY AND CONSTRUCTION PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011083 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing.

At a glance

Project

  • NameBALAJI APARTMENT
  • TypeResidential / Group Housing
  • Location
    • Devidayal Road
    • Mulund West
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011083
  • ReraGenie IDRG-MH-34905

Builder

  • NameTRIDEV REALTY AND CONSTRUCTION PVT LTD
  • Entity typeCompany
  • Managing DirectorsDEEPAK MULCHAND GOSAR, MEHUL HARISH GOSAR, CHANDRAKANT RAVJI HARIA
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed147 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BALAJI APARTMENTNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 99%.

BALAJI APARTMENT: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Progress on shared amenities15

As on 21 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,672 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9029.88
Proposed, not sanctioned3,950 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOLE BANGLOW N S ROAD MULUND WEST MUMBAI - 400080

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV S VAIDYA AND ASSOCIATES
PartnerRole in project
TRIDEV REALTY AND CONSTRUCTION PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018789Dec 2023 → Dec 2024

Reason as filed by the promoterRCC slab work of the building is completed in full and finishing internal work is in progress of the project, as is evidenced by the latest Form 1 that is Architect Certificate dated 23rd December-2023 submitted for the period of 30th November-2023. In the light of the abovementioned reasons, we seek extension of one year for due date of completion of the project i.e. 29-Dec-2024. Self Declaration dated 13.01.2024 for extension of due date for the said project is enclosed herewith. Scan copy of Original Notarized Affidavit cum declaration on Rs. 100/- stamp paper in Form B with extension date

EXT51800027908Dec 2023 → Dec 2026

Reason as filed by the promoterConstruction of the building is completed at around 99% as evidenced from the latest Architect Certificate for the quarter ended 31-Dec-2025 as uploaded. In light of one Car Lift work, obtaining of the Occupation Certificate (OC) and related compliances we seek extension of the project completion date till 31-12-2026. We request you to kindly grant extension of the project completion date till 31-12-2026. More than 51% Allottee's consent (Other than Existing Members) on promoter letter head duly stamped and signed in format B Mentioning Proposed Extension Date (31-Dec-2026) is attached. Form 1

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed147

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 147 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan_Form 1_30-06-2025 Balaji.pdf21 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sacn_Form 1_31-12-2024.pdf15 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan_Form 1_31-03-2025.pdf15 Apr 2025
Declaration in FORM BFile: Form B- Promoter_26-03-2025_Balaji_compressed.pdf27 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_31-12-24.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_31-03-24.pdf19 Mar 2025
Certificates of CA (Form 3)File: Form 3_31-12-24_Balaji Apartment_compressed.pdf12 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Balaji FY 2023-2024.pdf3 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Balaji Apartment_Form 2_31-03-2024.pdf27 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Balaji Apartment_Form 2_30-06-2024.pdf27 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Balaji Apartment_Form 2_30-09-2024.pdf27 Dec 2024
Certificates of CA (Form 3)File: Form 3_31-03-2024_compressed.pdf17 Dec 2024
Certificates of CA (Form 3)File: Form 3_30-06-2024_compressed.pdf17 Dec 2024
Certificates of CA (Form 3)File: Form 3_30-09-2024_compressed.pdf17 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji_30-06-2024.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji_30-09-2024.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji_31-12-23.pdf4 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji_31-03-24.pdf4 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_31-03-23.PDF1 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_30-06-23.PDF1 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_30-09-23.PDF1 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_31-12-23.PDF1 Feb 2024
Declaration in FORM BFile: Scan_Declaratation_Form B- Promoter_compressed.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Balaji_31-03-2023.PDF15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Balaji_30-06-2023.PDF15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Balaji_30-09-2023.PDF15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Balaji_30-11-2023.PDF15 Jan 2024
Disclosure of sold/ booked inventoryFile: Balaji Apartment Disclosure 31-12-2023.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_31-12-2021.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_31-03-2022.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_30-06-2022.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_30-09-2022.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_31-12-2022.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_31-03-2023.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_30-06-2023.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_30-09-2023.PDF15 Jan 2024
Certificates of CA (Form 3)File: Form_3_31-12-2023.pdf15 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Balaji FY 2022-2023.PDF15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Final_Form-2A-Balaji_Apartment_31-03-2023.PDF24 Jun 2023
Details of encumbrances concerned to FinanceFile: No-encumbrance concerned to legal_Balaji.pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: No-encumbrance concerned to legal_Balaji.pdf15 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest-Balaji.pdf15 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Balaji_Declaration for separate bank account.pdf15 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_31-12-2021.PDF5 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_31-03-2022_Balaji.PDF5 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_30-06-2022_Balaji.PDF5 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_30-09-2022_Balaji.PDF5 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_31-12-2022_Balaji.PDF5 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scan_Form 5 - Balaji FY 2021-2022.PDF11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji 31-12-2021.pdf6 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji 31-03-2022.pdf6 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji 30-06-2022.pdf6 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji 30-09-2022.pdf6 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji 31-12-2022.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: TRC_Form 2A - Quality Assurance Certificate_31-03-2022.PDF20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form No 5 Balaji 20-21.pdf14 Jan 2023
Layout approvalFile: Final_Plan_1.pdf8 Nov 2022
Layout approvalFile: Final_Plan_2.pdf8 Nov 2022
Layout approvalFile: Final_Plan_3.pdf8 Nov 2022
Copy of Layout Approval (in case of layout)File: Final_Plan_1.pdf8 Nov 2022
Copy of Layout Approval (in case of layout)File: Final_Plan_2.pdf8 Nov 2022
Copy of Layout Approval (in case of layout)File: Final_Plan_3.pdf8 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.PDF8 Nov 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.PDF8 Nov 2022
Certificates of CA (Form 3)File: Form 3 Balaji Apartment 31-03-2021.PDF28 Oct 2021
Certificates of CA (Form 3)File: Form 3 Balaji Apartment 30-06-2021.PDF28 Oct 2021
Certificates of CA (Form 3)File: Form 3 Balaji Tridev Realty 30-09-2021.PDF28 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 31-03-2021 Balaji Apartment_compressed.pdf19 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-06-2021 Balaji Apartment_compressed.pdf19 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-09-2021 Balaji Apartment_compressed.pdf19 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C05 03 31032018.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C06 06 30062018.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C07 09 30092018.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C08 12 31122018.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C09 03 31032019.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C10 06 31062019.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C11 09 30092019.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C12 12 31122019.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C13 03 31032020.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5160 RERA C14 06 30062020.pdf13 Oct 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
NANDJA CHS LTDNandja CHS ltd BPS Rd no 2 Mulund west Mumbai 40008015CompletedNov 2015Nov 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BALAJI APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmBALAJI APARTMENTCompleted 102Lapsed / revoked 74Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 310 registered projects within 2 km.

Builder: TRIDEV REALTY AND CONSTRUCTION PVT LTD

TRIDEV REALTY AND CONSTRUCTION PVT LTD has 3 registrations on MahaRERA, including BALAJI APARTMENT and TRIDEV ANUBHAV. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if BALAJI APARTMENT is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BALAJI APARTMENT?

The registered promoter entity is TRIDEV REALTY AND CONSTRUCTION PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BALAJI APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BALAJI APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BALAJI APARTMENT?

The professionals named in the filing: Architect: V S VAIDYA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BALAJI APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BALAJI APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BALAJI APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.