AYODHYA PARK
RG-MH-98930 · RERA P52800049259 · Last updated on MahaRERA portal: 3 Jan 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 19 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AYODHYA PARK is a Residential / Group Housing project by PRAMAY ENTERPRISES in Ratnagiri, Maharashtra, registered with MahaRERA as P52800049259 on 3 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 19 months from the original filing. 7 of the 12 units on this registration are recorded sold or booked, and 24 of 66 construction stages are filed complete.
At a glance
Project
- NameAYODHYA PARK
- TypeResidential / Group Housing
- Location
- LASHKARWADI
- Jalgaon
- Dapoli
- Ratnagiri
- 415712
- Pincode415712
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52800049259
- ReraGenie IDRG-MH-98930
Builder
- NamePRAMAY ENTERPRISES
- Entity typePartnership
- PartnersPRASAD SUDHAKAR DABHOLE, MAYURESH MILIND SHETH
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Feb 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 May 2025)
- Buildings6 building records
- Documents filed64 files
Current status
Figures as on 3 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| UNIT 1 | NA | 2 | 2 | 2 | 0 | 2 |
| UNIT 2 | NA | 2 | 2 | 2 | 0 | 2 |
| UNIT 3 | NA | 2 | 2 | 2 | 0 | 2 |
| UNIT 4 | NA | 2 | 2 | 2 | 0 | 2 |
| UNIT 5 | NA | 2 | 2 | 2 | 0 | 2 |
| UNIT 6 | NA | 2 | 2 | 2 | 0 | 2 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 3 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 95%.
UNIT 161%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
UNIT 261%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
UNIT 361%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
UNIT 455%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
UNIT 555%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
UNIT 661%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 3 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 85% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| UNIT 1 | 10 | 10 |
| UNIT 2 | 10 | 10 |
| UNIT 3 | 10 | 10 |
| UNIT 4 | 10 | 10 |
| UNIT 5 | 10 | 10 |
| UNIT 6 | 10 | 10 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BHALCHANDRA YASHWANT KARAMBELKAR | Borivali | Mumbai Suburban |
| ASHA ASHOK KARAMBELKAR | Jalgaon | Ratnagiri |
| MAITHILI MANGESH GONDHALEKAR | Jalgaon | Ratnagiri |
| AMOL ASHOK KARAMBELKAR | Jalgaon | Ratnagiri |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| UNIT 1 | NA | Rs 38.09 lakh | Rs 36.19 lakh |
| UNIT 2 | NA | Rs 38.09 lakh | Rs 36.19 lakh |
| UNIT 3 | NA | Rs 38.09 lakh | Rs 36.19 lakh |
| UNIT 4 | NA | Rs 38.09 lakh | Rs 36.19 lakh |
| UNIT 5 | NA | Rs 38.09 lakh | Rs 36.19 lakh |
| UNIT 6 | NA | Rs 38.09 lakh | Rs 36.19 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NEHA PRASHANT JOSHI |
| Engineer | ABHAY ANIL TALATHI |
| Chartered Accountant | CA ANJALI PENDHARKAR |
| Chartered Accountant | Shreyas Kakirde |
| Partner | Role in project |
|---|---|
| PRAMAY ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe extension of the project is being sought as the construction work was delayed due to labour constraints. The availability of skilled and unskilled labour was significantly impacted during the execution period, which affected the overall project timeline. Hence, we request an extension to complete the remaining work in accordance with the approved plans. Accordingly, approximately time required for completion of the abovementioned work without any break is 31/12/2026.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Cert.pdf | 3 Jan 2026 |
| Withdrawal Update Form 2File: Engg cert sep 25.pdf | 3 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate Sept,2025.pdf | 3 Jan 2026 |
| Occupational CertificateFile: Ayodhya Park OC.pdf | 3 Jan 2026 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert March 25.pdf | 27 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Jan-March 25.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Sep24.pdf | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Dec25.pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Sep24.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Dec24.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Sept 24.pdf | 9 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Dec 24.pdf | 9 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Mrarch 25.pdf | 9 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Invemtory-Feb.pdf | 8 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert June 2024.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert June 2024.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA's Cert June 2024.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory Oct 2024.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert June 2024.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA's Cert June 2024.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert June 2024.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory Oct 2024.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of unsold.pdf | 9 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- March24.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate March 24_compressed.pdf | 8 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24_compressed.pdf | 8 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report-Form5-22-23.pdf | 22 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert- September23.pdf | 8 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert-December23.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert-September23.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert-December23.pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-September23.pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-December23.pdf | 8 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 9 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-June.pdf | 9 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Details of Inventory.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 6 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginners Certificate.pdf | 6 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA1.pdf | 6 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- June.pdf | 6 Oct 2023 |
| Building plan approvalFile: Plan- Ayodhya Park_compressed (2).pdf | 21 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan- Ayodhya Park_compressed (2).pdf | 21 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Mayuresh.pdf | 21 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Prasad.pdf | 21 Jan 2023 |
| Proforma of Allotment letterFile: Allotment Letter_compressed.pdf | 21 Jan 2023 |
| Proforma of Agreement for saleFile: Agreement For Sale - Marathi.pdf | 21 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: NO Deviation AL.pdf | 21 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: NO Deviation AFS.pdf | 21 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (3).pdf | 20 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: no encum.pdf | 5 Jan 2023 |
| Details of encumbrances concerned to LegalFile: no encum.pdf | 5 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 upd_compressed.pdf | 16 Dec 2022 |
| CERSAI detailsFile: 14 CERSAI_Search_Report.pdf | 15 Dec 2022 |
| Other - LegalFile: 7 DEED.PDF | 15 Dec 2022 |
| Layout approvalFile: 10 Ayodhya Park Plan PDF (1).pdf | 11 Dec 2022 |
| PAN CardFile: Pramay Enterprises PAN.PDF | 11 Dec 2022 |
| Copy of the legal title reportFile: Project1 Pramay search report RERA format.pdf | 11 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: 5 Encumbrance.PDF | 11 Dec 2022 |
| Details of encumbrances concerned to LegalFile: 5 Encumbrance.PDF | 11 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: 10 Ayodhya Park Plan PDF (1).pdf | 11 Dec 2022 |
| Declaration about Commencement CertificateFile: 8 Declaration comm certificate.PDF | 11 Dec 2022 |
| Declaration in FORM BFile: 6 FORM B.PDF | 11 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account.pdf | 11 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
Keep AYODHYA PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near LASHKARWADI1,100+ in Ratnagiri
Filed coordinates, straight-line distance. 29 registered projects within 2 km.
KONKAN TRAILS LIFESPACE
KONKANTRAILSLIFESPACELLP
Cape of Bliss Phase 1A
HOABL Management LLP
VIAA VISION
VIAA VISION
COASTAL BREEZE
UNIVERSAL PROPERTIES
VRUNDAVAN
EMPIRE REALTORS AND DEVELOPERS
Cape of Bliss Phase I
Lodha Management LLP
See every Ratnagiri project, with the district possession charts
Builder: PRAMAY ENTERPRISES
PRAMAY ENTERPRISES has 2 registrations on MahaRERA, including AYODHYA PARK and Shree Sadguru Krupa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What are my rights if AYODHYA PARK is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AYODHYA PARK?
The registered promoter entity is PRAMAY ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AYODHYA PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AYODHYA PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AYODHYA PARK?
The professionals named in the filing: Architect: NEHA PRASHANT JOSHI; Engineer: ABHAY ANIL TALATHI; Chartered Accountant: CA ANJALI PENDHARKAR; Chartered Accountant: Shreyas Kakirde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AYODHYA PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.