Completed No litigation declared Residential / Group Housing project

AYODHYA PARK

By PRAMAY ENTERPRISES

RG-MH-98930 · RERA P52800049259 · Last updated on MahaRERA portal: 3 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 19 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
24 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 95%
5 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

AYODHYA PARK is a Residential / Group Housing project by PRAMAY ENTERPRISES in Ratnagiri, Maharashtra, registered with MahaRERA as P52800049259 on 3 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 19 months from the original filing. 7 of the 12 units on this registration are recorded sold or booked, and 24 of 66 construction stages are filed complete.

At a glance

Project

  • NameAYODHYA PARK
  • TypeResidential / Group Housing
  • Location
    • LASHKARWADI
    • Jalgaon
    • Dapoli
    • Ratnagiri
    • 415712
  • Pincode415712
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800049259
  • ReraGenie IDRG-MH-98930

Builder

  • NamePRAMAY ENTERPRISES
  • Entity typePartnership
  • PartnersPRASAD SUDHAKAR DABHOLE, MAYURESH MILIND SHETH
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredFeb 2023First promiseMay 2025Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 May 2025)
  • Buildings6 building records
  • Documents filed64 files

Current status

58%7 of 12 units booked
95.0%Work done, per cost certificate

Figures as on 3 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIT 1NA22202
UNIT 2NA22202
UNIT 3NA22202
UNIT 4NA22202
UNIT 5NA22202
UNIT 6NA22202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 3 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 95%.

UNIT 161%
ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
UNIT 261%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
UNIT 361%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
UNIT 455%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT 555%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT 661%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 3 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Open Space60
BuildingOpen SpaceTotal
UNIT 11010
UNIT 21010
UNIT 31010
UNIT 41010
UNIT 51010
UNIT 61010

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,575 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jul 2025
LandownerVillageDistrict
BHALCHANDRA YASHWANT KARAMBELKARBorivaliMumbai Suburban
ASHA ASHOK KARAMBELKARJalgaon Ratnagiri
MAITHILI MANGESH GONDHALEKARJalgaon Ratnagiri
AMOL ASHOK KARAMBELKARJalgaon Ratnagiri

Approvals and building plan

Sanctioning authorityTown Planning Ratnagiri
Permissible FSI1090.62
Proposed, not sanctioned1,091 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR,DAPOLI NAGARPANCHAYAT BUILDING,TAL DAPOLI, DIST RATNAGIRI, 415712,MAHARASHTRA
Estimated costRs 2.29 cr
Cost incurredRs 2.17 cr
Work done95.0%
BuildingWingEstimatedIncurred
UNIT 1NARs 38.09 lakhRs 36.19 lakh
UNIT 2NARs 38.09 lakhRs 36.19 lakh
UNIT 3NARs 38.09 lakhRs 36.19 lakh
UNIT 4NARs 38.09 lakhRs 36.19 lakh
UNIT 5NARs 38.09 lakhRs 36.19 lakh
UNIT 6NARs 38.09 lakhRs 36.19 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNEHA PRASHANT JOSHI
EngineerABHAY ANIL TALATHI
Chartered AccountantCA ANJALI PENDHARKAR
Chartered AccountantShreyas Kakirde
PartnerRole in project
PRAMAY ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28072502228May 2025 → Dec 2026

Reason as filed by the promoterThe extension of the project is being sought as the construction work was delayed due to labour constraints. The availability of skilled and unskilled labour was significantly impacted during the execution period, which affected the overall project timeline. Hence, we request an extension to complete the remaining work in accordance with the approved plans. Accordingly, approximately time required for completion of the abovementioned work without any break is 31/12/2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Cert.pdf3 Jan 2026
Withdrawal Update Form 2File: Engg cert sep 25.pdf3 Jan 2026
Withdrawal Update Form 3File: CA Certificate Sept,2025.pdf3 Jan 2026
Occupational CertificateFile: Ayodhya Park OC.pdf3 Jan 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert March 25.pdf27 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Jan-March 25.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Sep24.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Dec25.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Sep24.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Dec24.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Sept 24.pdf9 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Dec 24.pdf9 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Mrarch 25.pdf9 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Invemtory-Feb.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert June 2024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert June 2024.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA's Cert June 2024.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory Oct 2024.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert June 2024.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA's Cert June 2024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert June 2024.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory Oct 2024.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of unsold.pdf9 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- March24.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate March 24_compressed.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24_compressed.pdf8 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report-Form5-22-23.pdf22 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert- September23.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert-December23.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert-September23.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Cert-December23.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-September23.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-December23.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-June.pdf9 Oct 2023
Disclosure of sold/ booked inventoryFile: Details of Inventory.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginners Certificate.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA1.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- June.pdf6 Oct 2023
Building plan approvalFile: Plan- Ayodhya Park_compressed (2).pdf21 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan- Ayodhya Park_compressed (2).pdf21 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Mayuresh.pdf21 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Prasad.pdf21 Jan 2023
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf21 Jan 2023
Proforma of Agreement for saleFile: Agreement For Sale - Marathi.pdf21 Jan 2023
Deviation Report with respect to Allotment letterFile: NO Deviation AL.pdf21 Jan 2023
Deviation Report with respect to model copy of AgreementFile: NO Deviation AFS.pdf21 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (3).pdf20 Jan 2023
Details of encumbrances concerned to FinanceFile: no encum.pdf5 Jan 2023
Details of encumbrances concerned to LegalFile: no encum.pdf5 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 upd_compressed.pdf16 Dec 2022
CERSAI detailsFile: 14 CERSAI_Search_Report.pdf15 Dec 2022
Other - LegalFile: 7 DEED.PDF15 Dec 2022
Layout approvalFile: 10 Ayodhya Park Plan PDF (1).pdf11 Dec 2022
PAN CardFile: Pramay Enterprises PAN.PDF11 Dec 2022
Copy of the legal title reportFile: Project1 Pramay search report RERA format.pdf11 Dec 2022
Details of encumbrances concerned to FinanceFile: 5 Encumbrance.PDF11 Dec 2022
Details of encumbrances concerned to LegalFile: 5 Encumbrance.PDF11 Dec 2022
Copy of Layout Approval (in case of layout)File: 10 Ayodhya Park Plan PDF (1).pdf11 Dec 2022
Declaration about Commencement CertificateFile: 8 Declaration comm certificate.PDF11 Dec 2022
Declaration in FORM BFile: 6 FORM B.PDF11 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account.pdf11 Dec 2022

How this compares with Ratnagiri

58%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one moved by 19 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep AYODHYA PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LASHKARWADI1,100+ in Ratnagiri

2 kmAYODHYA PARKCompleted 10Lapsed / revoked 5Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: PRAMAY ENTERPRISES

PRAMAY ENTERPRISES has 2 registrations on MahaRERA, including AYODHYA PARK and Shree Sadguru Krupa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if AYODHYA PARK is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AYODHYA PARK?

The registered promoter entity is PRAMAY ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AYODHYA PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AYODHYA PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AYODHYA PARK?

The professionals named in the filing: Architect: NEHA PRASHANT JOSHI; Engineer: ABHAY ANIL TALATHI; Chartered Accountant: CA ANJALI PENDHARKAR; Chartered Accountant: Shreyas Kakirde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AYODHYA PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AYODHYA PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AYODHYA PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.