Home / Browse projects / Thane, Maharashtra / Ayodhya Imperial
Ayodhya Imperial
RG-MH-07104 · RERA P51700054104 · Last updated on MahaRERA portal: 13 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ayodhya Imperial is a Others project by Nirmaan Realty in Thane, Maharashtra, registered with MahaRERA as P51700054104 on 27 Dec 2023. Possession was promised by 19 Apr 2026 and is now 6 months past that date. The completion date has moved by 6 months from the original filing. 3 of the 29 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameAyodhya Imperial
- TypeOthers
- Location
- Chedda Road
- Pendse Nagar
- DOMBIVLI
- Kalyan
- Thane
- 421201
- Pincode421201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700054104
- ReraGenie IDRG-MH-07104
Builder
- NameNirmaan Realty
- Entity typePartnership
- PartnersAnurag Praveen Dudhe, Rupesh Rajaram Soshte, Pravin Vasant Dudhe
- Other registrations3 more →
- Completed2 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Dec 2023
- Promised completion19 Apr 2026
- Revised completionRevised to 19 Apr 2026 (originally 19 Oct 2025)
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 13 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ayodhya Imperial | NA | 7 | 7 | 15 | 14 | 29 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.
Ayodhya Imperial: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Progress on shared amenities15
As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ram Niwas | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Ayodhya Imperial | NA | Rs 5.00 cr | Rs 4.00 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shreyas S Brid |
| Engineer | Gopal M Bennur |
| Engineer | Akash Bhadarge |
| Chartered Accountant | Tejal A Mahajan |
| Chartered Accountant | Tejal Mahajan |
| Chartered Accountant | Abhijit Deshpande |
| Partner | Role in project |
|---|---|
| Nirmaan Realty | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe are requesting an extension for the completion of the Ayodhya Imperial project due to certain unforeseen challenges encountered during the early stages of construction. The approved project includes a provision for pit parking, which required deep excavation. During this process, we encountered a hard rock layer that was not anticipated. The removal of this hard rock took considerable time, as it required specialized machinery and techniques to break and clear, which delayed progress significantly up to the plinth level. In addition to this, the project also faced consistent labour shortage
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form1 Architect Certificate.pdf | 13 Apr 2026 |
| Withdrawal Update Form 2File: Form2 Engineer Certificate.pdf | 13 Apr 2026 |
| Withdrawal Update Form 3File: Ayodhya Form 3 31_03_26Signed.pdf | 13 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form2A QA Certificate FY25-26.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Architect Rera certificate_Ayodhya Imperial-2025-12-31.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: Engineers Rera Certificate Ayodhya31_12_25.pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 for RERA Ayodhya 31_12_25SIGNED.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: Architect Rera certificate.pdf | 27 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 30_09_25 Signed.pdf | 27 Oct 2025 |
| Withdrawal Update Form 1File: 000-Architect Rera certificate_Ayodhya Imperial-2025-06-30.pdf | 3 Sep 2025 |
| Withdrawal Update Form 1File: 000-Architect Rera certificate_Ayodhya Imperial-2025-06-30.pdf | 3 Sep 2025 |
| Withdrawal Update Form 2File: Form2 Upload.pdf | 3 Sep 2025 |
| Withdrawal Update Form 2File: Form2 Upload.pdf | 3 Sep 2025 |
| Withdrawal Update Form 3File: Form3 signed.pdf | 3 Sep 2025 |
| Withdrawal Update Form 3File: Form3 signed.pdf | 3 Sep 2025 |
| Withdrawal Update Form 1File: 000-Architect Rera certificate_Ayodhya Imperial-2025-06-30.pdf | 21 Aug 2025 |
| Withdrawal Update Form 2File: Form2 Upload.pdf | 21 Aug 2025 |
| Withdrawal Update Form 3File: Form3 signed.pdf | 21 Aug 2025 |
| Form 5 (FY 2024-2025)File: Form 5 FY24-25 Signed.pdf | 20 Aug 2025 |
| Form 5 (FY 2023-2024)File: Form5 FY23-24.pdf | 19 Aug 2025 |
| Withdrawal Update Form 1File: 000-Architect Rera certificate_Ayodhya Imperial-2025-06-30.pdf | 30 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer.pdf | 30 Jul 2025 |
| Withdrawal Update Form 3File: 15 - CA Certificate Form 3.pdf | 30 Jul 2025 |
| Form 1File: 10 - Architect’s Certificate of Percentage of Completion of Work.pdf | 19 Jul 2025 |
| Form 2File: Form2 Engineer Certificate 31_10_23.pdf | 19 Jul 2025 |
| Form 3File: Form3 RERA Uploaded.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 13 - Disclosure of sold Inventory.pdf | 19 Jul 2025 |
| Form 1File: 000-ARCHITECT STATUS CERTIFICATE-AYODHYA IMPERIAL-2025-03-31.pdf | 19 Jul 2025 |
| Form 2File: Engineer Certificate310325.pdf | 19 Jul 2025 |
| Form 3File: Engineer Certificate310325.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Ayodhya Disclosure of sold -210425.pdf | 19 Jul 2025 |
| Form 1File: ARCHITECT STATUS CERTIFICATE-AYODHYA 2024-12-31.pdf | 19 Jul 2025 |
| Form 2File: Engineer Certificate Ayodhya 31 12 24.pdf | 19 Jul 2025 |
| Form 3File: Engineer Certificate Ayodhya 31 12 24.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: LH Ayodhya Disclosure of sold -110325.pdf | 19 Jul 2025 |
| Form 1File: Ayodhya Architect Certificate sEPT 24 041024.pdf | 19 Jul 2025 |
| Form 2File: Ayodhya Engineer Certificate - 041024.pdf | 19 Jul 2025 |
| Form 3File: Ayodhya Engineer Certificate - 041024.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: LH Ayodhya Disclosure of sold -041024.pdf | 19 Jul 2025 |
| Form 1File: Ayodhya Architect Certificate sEPT 24 041024.pdf | 19 Jul 2025 |
| Form 2File: Ayodhya Engineer Certificate - 041024.pdf | 19 Jul 2025 |
| Form 3File: LH Ayodhya Disclosure of sold -041024.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: LH Ayodhya Disclosure of sold -041024.pdf | 19 Jul 2025 |
| Form 2A (FY 2023-2024)File: Form2A Ayodhya Engineer LH Annexure C Quality Assurance Cert FY23-24.pdf | 18 Jul 2025 |
| Form 2A (FY 2024-2025)File: Ayodhya - Quality Assuarance Supervisior Certi. Annexure C-210425.pdf | 18 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 000-ARCHITECT STATUS CERTIFICATE-AYODHYA IMPERIAL-2025-03-31.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate310325.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Ayodhya Disclosure of sold -210425.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: LH Ayodhya Disclosure of sold -110325.pdf | 11 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT STATUS CERTIFICATE-AYODHYA 2024-12-31.pdf | 26 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Ayodhya 31 12 24.pdf | 26 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Ayodhya Disclosure of sold 17022025.pdf | 26 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Ayodhya Disclosure of sold 17022025.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ayodhya Architect Certificate sEPT 24 041024.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ayodhya Engineer Certificate - 041024.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: LH Ayodhya Disclosure of sold -041024.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: LH Ayodhya Disclosure of sold -JUNE 24.pdf | 2 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ayodhya Engineer LH Annexure C Quality Assurance Cert FY23-24.pdf | 2 Jan 2025 |
| CERSAI detailsFile: 14 - CERSAI details_R2.pdf | 18 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 16 - Disclosure of Interest in Other Real Estate Organizations_R2.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: 02 - Copy of the legal title report.pdf | 29 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: 03 - a Details of encumbrances concerned to Finance.pdf | 27 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: 04 - b Details of encumbrances concerned to Legal.pdf | 27 Nov 2023 |
| Details of encumbrances concerned to LegalFile: 03 - a Details of encumbrances concerned to Finance.pdf | 27 Nov 2023 |
| Details of encumbrances concerned to LegalFile: 04 - b Details of encumbrances concerned to Legal.pdf | 27 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 15 - CA Certificate Form 3.pdf | 27 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 23 - Separate Bank Account details including no encumbrances on the Bank Account or no esc | 27 Nov 2023 |
| Declaration about Commencement CertificateFile: 08 - Declaration about Commencement Certificate.pdf | 16 Nov 2023 |
| Layout approvalFile: 05 - Copy of Layout Approval_compressed.pdf | 10 Nov 2023 |
| Building plan approvalFile: 06 - Building Plan Approval_compressed.pdf | 10 Nov 2023 |
| PAN CardFile: 01 - Pancard.pdf | 10 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 05 - Copy of Layout Approval_compressed.pdf | 10 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 - Building Plan Approval_compressed.pdf | 10 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 07 - Commencement Certificates.pdf | 10 Nov 2023 |
| Declaration in FORM BFile: 09 - Declaration in FORM B.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 - Architect’s Certificate of Percentage of Completion of Work.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 - Engineer’s Certificate on Cost Incurred on Project.pdf | 10 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: 13 - Disclosure of sold Inventory.pdf | 10 Nov 2023 |
| Proforma of Agreement for saleFile: 18 - Proforma of Agreement for sale.pdf | 10 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ayodhya Imperial on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pendse Nagar7,600+ in Thane
Filed coordinates, straight-line distance. 318 registered projects within 2 km.
MY CITY PHASE II CLUSTER 5 PART II
HORIZON PROJECTS PVT LTD
MY CITY PHASE II CLUSTER 5 PART III
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 3 Bldg No 27-28
Runwal Residency Private Limited
Runwal Gardens Phase 4 Bldg No. 35-36
Runwal Residency Private Limited
VASTU LUXURIA
LAUKIK DEVELOPMENT CORPORATION
KAPLESHWARA RESIDENCY
KAPLESHWARA HOMES LLP
See every Thane project, with the district possession charts
Builder: Nirmaan Realty
Nirmaan Realty has 4 registrations on MahaRERA, including Aaraadhy Imperial and Saket Imperial. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Ayodhya Imperial shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Ayodhya Imperial is delayed beyond 19 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ayodhya Imperial?
The registered promoter entity is Nirmaan Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ayodhya Imperial?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Ayodhya Imperial?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ayodhya Imperial?
The professionals named in the filing: Architect: Shreyas S Brid; Engineer: Gopal M Bennur; Engineer: Akash Bhadarge; Chartered Accountant: Tejal A Mahajan; Chartered Accountant: Tejal Mahajan; Chartered Accountant: Abhijit Deshpande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ayodhya Imperial?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback