Home / Browse projects / Mumbai Suburban, Maharashtra / AYESHA HEIGHTS

Registered No litigation declared Residential / Group Housing project

AYESHA HEIGHTS

By UMAIR CONSTRUCTION

RG-MH-60847 · RERA P51800046945 · Last updated on MahaRERA portal: 5 Dec 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
113 of 134Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

AYESHA HEIGHTS is a Residential / Group Housing project by UMAIR CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046945 on 26 Sep 2022. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 21 of the 134 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameAYESHA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • KOKNIPADA
    • KURAR VILLAGE
    • TRIVENI NAGAR
    • MALAD EAST
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046945
  • ReraGenie IDRG-MH-60847

Builder

  • NameUMAIR CONSTRUCTION
  • Entity typePartnership
  • PartnersPIRUBHAI BHIKHABHAI CHAUHAN, MOHAMMAD ZUBAIR PIRUBHAI CHAUHAN, USAMA PIRUBHAI CHAUHAN, NIYAZ AHMED ABDULLAH HANWARE

Key dates

this monthRegisteredSep 2022First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 25 Dec 2025)
  • Buildings1 building record
  • Documents filed87 files

Current status

16%21 of 134 units booked

Figures as on 5 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AYESHA HEIGHTSNA24231322134

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

AYESHA HEIGHTS: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 5 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Fitness CentreYes75%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,632 sq m
Land owned byThe promoter
Named landownersNone
Declared on9 Sep 2024

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY MUMBAI
Permissible FSI9678.53
Proposed, not sanctioned7,111 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSADGURU DARSHAN, ROAD NO 3, LIBERTY GARDEN, MALAD WEST, MUMBAI - 400064

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR ASAD KHAN
EngineerMR SHAIKH MOHAMMAD IRFAN
Chartered AccountantMR JAVED KAZI OF KAZI & ASSOCIATES
Chartered AccountantN P SHETTY & CO.
Chartered AccountantH.S.P. & Associates
PartnerRole in project
UMAIR CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20122518872Dec 2025 → Dec 2027

Reason as filed by the promoterDue to delay in receipt of statutory approvals and permissions from the concerned authorities, the construction activities of the project could not progress as per the originally declared schedule. Since commencement and execution of construction are strictly subject to receipt of such approvals, the delay was beyond the control of the promoter and resulted in unavoidable disruption of the project timeline.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: DocScanner 20 Oct 2025 12-11 pm (3).pdf5 Dec 2025
Form 2File: form 2.pdf5 Dec 2025
Form 3File: form 3.pdf5 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf30 Sep 2025
Form 1File: architect certificate form 1.pdf26 Jul 2025
Form 2File: Engineer certificate form 2.pdf26 Jul 2025
Form 3File: ca certificate form 3 compress.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold & book inventory.pdf26 Jul 2025
Form 1File: ARCHITECT CERTIFICATE MARCH 2025.pdf26 Jul 2025
Form 2File: Form 2 Engineer Certificate March-2025.pdf26 Jul 2025
Form 3File: FORM 3 CA certificate March-2025.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY March - 2025.pdf26 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE MARCH 2025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA certificate March-2025.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate March-2025.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY March - 2025.pdf21 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Site Supervisor Certificate March-2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DEC-2024.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 DEC-2024.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DEC-2024.pdf17 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 2024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 Sep 2024.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sep 2024.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Book and Sold inventory Sept 2024.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA OF MARCH 2024.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JUNE 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOLD UNSOLD INVENT JUNE 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE June 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE JUNE 2024.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ARCHITECT CERTIFICATE JUNE 2024.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENT JUNE 2024.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER CERTIFICATE JUNE 2024.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2024.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2.pdf2 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Supervisor Certificate form 2A.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate form 3.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY.pdf24 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf18 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2023.pdf18 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf18 Nov 2023
Disclosure of sold/ booked inventoryFile: BOOK AND SOLD INVENTORY SEP 2023.pdf18 Nov 2023
Disclosure of sold/ booked inventoryFile: BOOK AND SOLD INVENTORY SEP 2023.pdf18 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 JUNE 2023.pdf18 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 UMAIR MARCH 2023.pdf25 Oct 2023
Proforma of Agreement for saleFile: DRAFT AGREEMENT.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECT CERTIFICATE 31-03-2023.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DEC -2022.pdf6 Feb 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT TO AGREEMENT FOR SALE.pdf22 Sep 2022
Other - LegalFile: AGREEMENT_FOR_SALE.pdf22 Sep 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT TO AGREEMENT.pdf21 Sep 2022
Other - LegalFile: AGREEMENT_FOR_SALE.pdf21 Sep 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT FOR AGREEMENT FOR SALE.pdf17 Sep 2022
Other - LegalFile: AGREEMENT_FOR_SALE.pdf17 Sep 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION TO AGREEMENT.pdf13 Sep 2022
Other - LegalFile: AGREEMENT FOR SALE.pdf13 Sep 2022
Building plan approvalFile: IOA umair for rera.pdf12 Sep 2022
Building plan approvalFile: plan 2.pdf12 Sep 2022
Building plan approvalFile: plan 3.pdf12 Sep 2022
Building plan approvalFile: plan 4.pdf12 Sep 2022
Building plan approvalFile: plan 5.pdf12 Sep 2022
Building plan approvalFile: plan 6.pdf12 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA umair for rera.pdf12 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf12 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: plan 3.pdf12 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: plan 4.pdf12 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: plan 5.pdf12 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: plan 6.pdf12 Sep 2022
CERSAI detailsFile: Declaration for CERSAI report.pdf9 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf9 Sep 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT TO AGREEMENT FOR SALE.pdf9 Sep 2022
Other - TechnicalFile: SANCTIONED PLAN.pdf9 Sep 2022
Layout approvalFile: plan 1.pdf23 Aug 2022
Copy of Layout Approval (in case of layout)File: plan 1.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE -UMAIR CONSTRUCTION.pdf23 Aug 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf19 Aug 2022
Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf19 Aug 2022

How this compares with Mumbai Suburban

16%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AYESHA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD EAST6,700+ in Mumbai Suburban

2 kmAYESHA HEIGHTSCompleted 74Lapsed / revoked 52Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 225 registered projects within 2 km.

Builder: UMAIR CONSTRUCTION

UMAIR CONSTRUCTION has 1 registration on MahaRERA, including AYESHA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AYESHA HEIGHTS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AYESHA HEIGHTS?

The registered promoter entity is UMAIR CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AYESHA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AYESHA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AYESHA HEIGHTS?

The professionals named in the filing: Architect: MR ASAD KHAN; Engineer: MR SHAIKH MOHAMMAD IRFAN; Chartered Accountant: MR JAVED KAZI OF KAZI & ASSOCIATES; Chartered Accountant: N P SHETTY & CO.; Chartered Accountant: H.S.P. & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AYESHA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AYESHA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AYESHA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.