Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
113 of 123Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

AVINYA NIRMAN JAYRAJ APARTMENT CHSL is a Others project by SHREE BALAJI ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000078614 on 27 Dec 2024. Possession is promised by 31 Dec 2028. 10 of the 123 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameAVINYA NIRMAN JAYRAJ APARTMENT CHSL
  • TypeOthers
  • Location
    • DIWANMAN
    • VASAI WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401202
  • Pincode401202
  • RERA no.P99000078614
  • ReraGenie IDRG-MH-23306

Builder

  • NameSHREE BALAJI ENTERPRISES
  • Entity typePartnership
  • GSTIN27AEZFS5305R1ZW
  • Other registrations9 more →
  • Completed3 of 10
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed69 files

Current status

8%10 of 123 units booked

Figures as on 10 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVINYA NIRMAN JAYRAJ APARTMENT CHSL B WINGNA8756056
AVINYA NIRMAN JAYRAJ APARTMENT CHSL A WINGNA87561167

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

AVINYA NIRMAN JAYRAJ APARTMENT CHSL B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AVINYA NIRMAN JAYRAJ APARTMENT CHSL A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
AVINYA NIRMAN JAYRAJ APARTMENT CHSL B WING11
AVINYA NIRMAN JAYRAJ APARTMENT CHSL A WING11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,637 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Sep 2026
LandownerVillageDistrict
JAYRAJ APARTMENT CO OP HSG SOC LTDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityvvcmc
Permissible FSI5918.6
Proposed, not sanctioned5,919 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREE APARTMENT, NEAR RAILWAY STATION, NALLASOPARA (W), DIST. THANE - 401 203

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL R PRAJAPATI
EngineerSANJAY B BELNEKAR
EngineerASRAR AHMED SABBIR KHAN JATTO
Chartered AccountantKUMAR VAMAN MHATRE
Chartered Accountantk S SUBRAHMANYAM
PartnerRole in project
SHREE BALAJI ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf10 Sep 2026
Withdrawal Update Form 2File: 2 form.pdf10 Sep 2026
Withdrawal Update Form 3File: March 26 Form 3.pdf10 Sep 2026
Form 2A (FY 2024-2025)File: 24-25.pdf1 Sep 2026
Form 2A (FY 2025-2026)File: 25-26.pdf1 Sep 2026
Form 5 (FY 2025-2026)File: Form 5 Shree Balaji Enterprises.pdf21 Aug 2026
Form 5 (FY 2024-2025)File: 5.pdf20 Aug 2026
Form 1File: FORM 1 QPR Apr-Jun.pdf7 Aug 2026
Form 2File: FORM 2.pdf7 Aug 2026
Form 3File: Form3 june 26.pdf7 Aug 2026
Disclosure of Sold and Booked InventoryFile: cir 29 june26.pdf7 Aug 2026
Form 1File: Form 1 -.pdf7 Aug 2026
Form 2File: Form 2.pdf7 Aug 2026
Form 3File: form 3 March 26.pdf7 Aug 2026
Disclosure of Sold and Booked InventoryFile: cir 29 MARCH 26.pdf7 Aug 2026
Form 1File: Form 1 Dec 25.pdf20 Jan 2026
Form 2File: Form 2 Dec 25.pdf20 Jan 2026
Form 3File: Form 3 Dec 25.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Cir 29.pdf20 Jan 2026
OthersFile: Form 2 A.pdf29 Oct 2025
Disclosure of Sold and Booked InventoryFile: Cir 29.pdf29 Oct 2025
Form 1File: form 1.pdf29 Oct 2025
Form 2File: Form 2.pdf29 Oct 2025
Form 3File: Form 3(3).pdf29 Oct 2025
Form 1File: form 1 Avinya june.pdf23 Jul 2025
Form 2File: Form 2 Avinya.pdf23 Jul 2025
Form 3File: Form 3 Avinya.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: cir 29 Avinya.pdf23 Jul 2025
OthersFile: Form 2 A Avinya.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MARCH 2025.pdf17 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 dec 24.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 march 25.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Dec 24.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 B WING dec 24.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 B WINGmarch 25.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 march 25 A.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 dec 24 A.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: CIR29.pdf8 Apr 2025
Details of encumbrances concerned to FinanceFile: enc to finance.pdf6 Dec 2024
Details of encumbrances concerned to FinanceFile: enc to LEGAL.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW.pdf6 Dec 2024
CERSAI detailsFile: cersai.pdf6 Dec 2024
Details of encumbrances concerned to LegalFile: enc to finance.pdf6 Dec 2024
Details of encumbrances concerned to LegalFile: enc to LEGAL.pdf6 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf6 Dec 2024
Proforma of Agreement for saleFile: AFS 2.pdf28 Nov 2024
Proforma of Allotment letterFile: al.pdf19 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: format A.pdf19 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: secure unsecured dec.pdf19 Nov 2024
Declaration about Commencement CertificateFile: 32.pdf16 Oct 2024
Other - TechnicalFile: Anx A order 50.pdf16 Oct 2024
Building plan approvalFile: B Wing Building Plan.pdf14 Oct 2024
Building plan approvalFile: A wing Building Plan.pdf14 Oct 2024
Layout approvalFile: Layout Plan.pdf14 Oct 2024
PAN CardFile: Co Pan card.pdf14 Oct 2024
Copy of the legal title reportFile: legal title.pdf14 Oct 2024
Details of encumbrances concerned to FinanceFile: enc to legal.pdf14 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf14 Oct 2024
Declaration in FORM BFile: Form B s r patil.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 form.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 7 PAGES.pdf14 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: B Wing Building Plan.pdf14 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: A wing Building Plan.pdf14 Oct 2024
Deviation Report with respect to Allotment letterFile: deviation of allotment letter.pdf14 Oct 2024
Details of encumbrances concerned to LegalFile: enc to legal.pdf14 Oct 2024
Deviation Report with respect to model copy of AgreementFile: deviation of agreement.pdf14 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of int.pdf14 Oct 2024

How this compares with Palghar

8%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVINYA NIRMAN JAYRAJ APARTMENT CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI WEST3,200+ in Palghar

Builder: SHREE BALAJI ENTERPRISES

SHREE BALAJI ENTERPRISES has 10 registrations on MahaRERA, including JAY BALAJI HIGHTS and MADHUSHREE PARK - DEODHAR. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if AVINYA NIRMAN JAYRAJ APARTMENT CHSL is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVINYA NIRMAN JAYRAJ APARTMENT CHSL?

The registered promoter entity is SHREE BALAJI ENTERPRISES, a partnership as per the filing. Its GSTIN 27AEZFS5305R1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVINYA NIRMAN JAYRAJ APARTMENT CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVINYA NIRMAN JAYRAJ APARTMENT CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVINYA NIRMAN JAYRAJ APARTMENT CHSL?

The professionals named in the filing: Architect: ATUL R PRAJAPATI; Engineer: SANJAY B BELNEKAR; Engineer: ASRAR AHMED SABBIR KHAN JATTO; Chartered Accountant: KUMAR VAMAN MHATRE; Chartered Accountant: k S SUBRAHMANYAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVINYA NIRMAN JAYRAJ APARTMENT CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVINYA NIRMAN JAYRAJ APARTMENT CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVINYA NIRMAN JAYRAJ APARTMENT CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.