AVESA

By JAGDALE INFRASTRUCTURE PVT. LTD.

RG-MH-30327 · RERA P51700030171 · Last updated on MahaRERA portal: 17 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 60%
178 of 278Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

AVESA is a Others project by JAGDALE INFRASTRUCTURE PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700030171 on 5 Aug 2021. Possession is promised by 2 Oct 2026. 100 of the 278 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameAVESA
  • TypeOthers
  • Location
    • Pokhran Road no 2
    • Pokhran Road 2
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700030171
  • ReraGenie IDRG-MH-30327

Builder

  • NameJAGDALE INFRASTRUCTURE PVT. LTD.
  • Entity typeCompany
  • CINU45200MH2007PTC174171
  • GSTIN27AACCJ0653K1ZJ
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsRAHUL HANMANT JAGDALE, ROHIT HANMANT JAGDALE
  • Other registrations4 more →
  • Completed1 of 5
  • Past their filed date2
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2021PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2021
  • Promised completion2 Oct 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Current status

36%100 of 278 units booked
73.9%Work done, per cost certificate

Figures as on 17 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVESANA353525226278

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

AVESA: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed250

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots250
Closed/Covered199
Open Space51

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,514 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Aug 2025

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI16643.05
Proposed, not sanctioned16,643 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHANE
Estimated costRs 47.88 cr
Cost incurredRs 35.39 cr
Work done73.93%
BuildingWingEstimatedIncurred
AVESANARs 47.88 crRs 35.39 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNexstep Consultant
EngineerEpicons Consultants Pvt Ltd
Engineerjacob dsouza
Chartered AccountantSalunke Jayawant & Phadke Chartered Accountants
Chartered AccountantNEHALI & CO
PartnerRole in project
JAGDALE INFRASTRUCTURE PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Avesa.pdf17 May 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE AVESA.pdf17 May 2026
Withdrawal Update Form 3File: Form 3 Avesa.pdf17 May 2026
Withdrawal Update Form 1File: form 1.pdf11 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf11 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf11 Mar 2026
Withdrawal Update Form 1File: form 1.pdf13 Dec 2025
Withdrawal Update Form 2File: engineers certificate (2).pdf13 Dec 2025
Withdrawal Update Form 3File: form 3.pdf13 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: avesa form 3 (1).pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jagdale Avesa Form 2 Jan 25 (2).pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avesa Form 2.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avesa.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avesa.pdf27 Jan 2025
Details of encumbrancesFile: Encumbrance financial.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (1).pdf26 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Avesa.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avesa.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 12 23.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 09 23.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 12 23.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 july 2023.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fom 1 sep 2023.pdf13 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Avesa CC.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 03 22.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 06 22.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 09 22.pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 03 22.pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 06 22.pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf6 May 2023
Details of encumbrancesFile: Encumrbance financial.pdf8 Apr 2023
Proforma of Agreement for saleFile: AFS - JAGDALE - AVESA 06-04-2023 (1).pdf8 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: jagdale bank.pdf20 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf25 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf9 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf9 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Avesa CC 26-8-21 (2) (2).pdf4 Jan 2022
Proforma of Allotment letterFile: draft agreement.pdf4 Jan 2022
Copy of the legal title reportFile: AVESA Title .pdf3 Aug 2021
Layout approvalFile: scan_compressed.pdf22 Jul 2021
Building plan approvalFile: AVESA IOA (1).pdf22 Jul 2021
Details of encumbrancesFile: Encumbrances Avesa .pdf22 Jul 2021
Copy of Layout Approval (in case of layout)File: scan_compressed.pdf22 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: AVESA IOA (1).pdf22 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: PRIYADARSHINI (1)_compressed.pdf22 Jul 2021
Declaration about Commencement CertificateFile: RERA declaraation.pdf22 Jul 2021
Declaration in FORM BFile: FORM - B.pdf22 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed certificate- form 3.pdf22 Jul 2021
Proforma of Allotment letterFile: RERA Draft.pdf22 Jul 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
AMIZRAOpp Runwal Plaza Anand Next To Dosti MMRDA Kores Road Vartak Nagar164CompletedDec 2018Late, Dec 2019

How this compares with Thane

36%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVESA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pokhran Road 27,600+ in Thane

2 kmAVESACompleted 132Lapsed / revoked 61Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 333 registered projects within 2 km.

Builder: JAGDALE INFRASTRUCTURE PVT. LTD.

JAGDALE INFRASTRUCTURE PVT. LTD. has 5 registrations on MahaRERA, including AMIZRA and JAGDALE AASTHA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AVESA is delayed beyond 2 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVESA?

The registered promoter entity is JAGDALE INFRASTRUCTURE PVT. LTD., a company as per the filing. Its CIN U45200MH2007PTC174171 and GSTIN 27AACCJ0653K1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVESA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVESA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVESA?

The professionals named in the filing: Architect: Nexstep Consultant; Engineer: Epicons Consultants Pvt Ltd; Engineer: jacob dsouza; Chartered Accountant: Salunke Jayawant & Phadke Chartered Accountants; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVESA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVESA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVESA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.