Registration lapsed No litigation declared Residential / Group Housing project

Ave Maria Apartment

By SURAJ ESTATE DEVELOPERS LTD

RG-MH-60172 · RERA P51900021954 · Last updated on MahaRERA portal: 11 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Installation of Lifts, 98%
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Ave Maria Apartment is a Residential / Group Housing project by SURAJ ESTATE DEVELOPERS LTD in Mumbai City, Maharashtra, registered with MahaRERA as P51900021954 on 25 Aug 2019. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameAve Maria Apartment
  • TypeResidential / Group Housing
  • Location
    • College Lane
    • Agar Bazar
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • RERA no.P51900021954
  • ReraGenie IDRG-MH-60172

Builder

  • NameSURAJ ESTATE DEVELOPERS LTD
  • Entity typeCompany
  • CINU99999MH1986PTC040873
  • GSTIN27AAACS8375H1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorTHOMAS RAJAN
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

10 months past promisethis monthRegisteredAug 2019First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2019
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ave Maria ApartmentNA3115000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 98%.

Ave Maria Apartment: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 11 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,698 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI9798.54
Proposed, not sanctioned6,799 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUnit B/G01, Grd Floor, Marathon Innova, Marathon Next, Lower Parel, Mumbai - 400013

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPriyanka Rahate
EngineerSarthak Tekade
Chartered AccountantNaveen Tripathi
PartnerRole in project
SURAJ ESTATE DEVELOPERS LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900025841Dec 2024 → Dec 2025

Reason as filed by the promoter26th December, 2024 The Chairman MahaRERA, Bandra (East), Mumbai - 400 051 Dear Sir, Sub.: Redevelopment of property known as “Ave Maria” on property bearing F.P. 822, TPS IV of Mahim Division, situate at S.K.Bole Road, Dadar (West), Mumbai - 400 028. We have registered our above project known as “Ave Maria” vide registration No.P51900021954. The completion date as per the Certificate is 31st December, 2024. The construction work of the project is fully complete and we have obtained NOC from MHADA for issuance of OC. Accordingly, we have shifted existing tenants/occupants to their respective p

Litigation declared3

CaseCourtStatus
1652/2015Bombay City Civil CourtMatter referred to Lok Adalat for settlement awaiting report of Lok Adalat
1653/2015Bombay City Civil CourtMatter referred to Lok Adalat for settlement awaiting report of Lok Adalat
1654/2015Bombay City Civil CourtMatter referred to Lok Adalat for settlement awaiting report of Lok Adalat

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 822_AR.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ave -Maria Form 2A.pdf8 Apr 2025
Certificates of CA (Form 3)File: Fom 3 Ave Mari Dec 2024_compressed.pdf1 Apr 2025
Disclosure of sold/ booked inventoryFile: Ave Maria - inventory.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form III Ave Maria Sept 2024_compressed.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - FP822 Ave maria - September 24.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certificate- Form 5 Ave Maria 2024_compressed.pdf4 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf3 Jan 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf3 Jan 2025
Other - TechnicalFile: CPM.pdf3 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form -2.pdf3 Jan 2025
Declaration in FORM BFile: Declaration about CC.pdf2 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Rehab FCC.pdf31 Dec 2024
Declaration about Commencement CertificateFile: Declaration - Ave -Maria.pdf31 Dec 2024
Declaration in FORM BFile: AFFIDAVIT-CUM-DECLARATION AVE MARIA.pdf27 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 822_.pdf17 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 822_240408.pdf10 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 822_240408.pdf10 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 822_Architect Certificate 04 01 2024.pdf25 Jan 2024
Certificates of CA (Form 3)File: Final Form 3 AAve Maria Sept 2023 Final-compressed-compressed.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - FP822 Ave maria - September 23.pdf3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ava maria architect certificate.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Ave Maria March 2023.pdf28 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AVE MARIA.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ave Maria 18 April 23.pdf7 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE FP 822.pdf7 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Rehab FCC.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGINEERS CERTIFICATE FP 822.pdf6 Feb 2023
Certificates of CA (Form 3)File: FInal_Form 3 Ave Maria Dec 2022_compressed.pdf30 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - FP 822 - Mar 22_compressed.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ave Maria.pdf17 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE - FP 822 - September 22.pdf17 Nov 2022
Certificates of CA (Form 3)File: Form 3 avemaria sept 30 2022 final (1).pdf17 Nov 2022
Certificates of CA (Form 3)File: Final_Form 3 Ave maria March 2022_11zon.pdf27 Jul 2022
Certificates of CA (Form 3)File: Final_Form 3 Ave maria June 2022_11zon.pdf27 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ave Maria Percentage of work_11zon.pdf25 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - FP822 - March 22.pdf25 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - FP822 - July 22.pdf25 Jul 2022
OtherFile: MOEF 822.pdf23 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC2021.pdf28 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH2022.pdf28 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SEP2021.pdf28 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 March 2021 Signed copy.pdf14 Mar 2022
Proforma of Allotment letterFile: agreement.pdf19 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2A -JUNE.pdf3 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2A.pdf3 Feb 2022
Building plan approvalFile: ave maria 1.pdf3 Jan 2022
Building plan approvalFile: ave maria 2.pdf3 Jan 2022
Building plan approvalFile: ave maria 3.pdf3 Jan 2022
Building plan approvalFile: ave maria 4.pdf3 Jan 2022
Building plan approvalFile: Amend letter_signed Ave Maria.pdf3 Jan 2022
Building Plan Approval (IOD)File: Amend letter_signed Ave Maria.pdf3 Jan 2022
Building Plan Approval (IOD)File: ave maria 1.pdf3 Jan 2022
Building Plan Approval (IOD)File: ave maria 2.pdf3 Jan 2022
Building Plan Approval (IOD)File: ave maria 3.pdf3 Jan 2022
Building Plan Approval (IOD)File: ave maria 4.pdf3 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: 2309959_FurtherCC_signed (1).pdf3 Jan 2022
OtherFile: MOEF1.pdf1 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf13 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A-compressed.pdf14 Jun 2021
OtherFile: 6 monthly compl.pdf3 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 - FP 822-min.pdf10 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000638.pdf25 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR CERTIFICATE FP 822 0.pdf25 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: imgtopdf_20022021015541.pdf23 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR CERTIFICATE FP 822.pdf23 Feb 2021
Building plan approvalFile: Letter.pdf13 Feb 2021
Building Plan Approval (IOD)File: Letter.pdf13 Feb 2021
OtherFile: 123.pdf20 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form2a.pdf6 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: scanmarch_2020_compressed.pdf23 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form_2a_june_2020_compressed.pdf23 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form_2a_june_2020_compressed.pdf23 Nov 2020
OtherFile: EC.pdf20 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Rehab FCC - 10-11-2020.pdf18 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - FP 822.pdf14 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: 2221749_FurtherCC_signed.pdf9 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ave Maria Arch Certificate.pdf26 Jul 2019
Copy of the legal title reportFile: Title Certificate FP 822.pdf5 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR CERTIFICATE AVE MARIA.pdf12 Mar 2019

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PALETTEP51900008207DADAR-WEST, Mumbai City152Aug 2017OngoingDec 2025Registered original: Jun 2023Not delivered
HALLMARKCS 104 BHIMWADI WADALA EAST MUMBAI7-CompletedJul 2016Late, Nov 2016
ETERNITY APARTMENTFP 469 MMC CROSS ROAD MAHIM WEST MUMBAI 40001616-CompletedAug 2011Aug 2011
PARK SIDEFP 888 DATTA RAUL ROAD DADAR WEST MUMBAI 40002828-CompletedJul 2010Late, Feb 2011

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 12 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ave Maria Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Agar Bazar780+ in Mumbai City

Builder: SURAJ ESTATE DEVELOPERS LTD

SURAJ ESTATE DEVELOPERS LTD has 15 registrations on MahaRERA, including ST ANTHONY APARTMENT and TRANQUIL BAY. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Ave Maria Apartment shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ave Maria Apartment is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ave Maria Apartment?

The registered promoter entity is SURAJ ESTATE DEVELOPERS LTD, a company as per the filing. Its CIN U99999MH1986PTC040873 and GSTIN 27AAACS8375H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ave Maria Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ave Maria Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ave Maria Apartment?

The professionals named in the filing: Architect: Priyanka Rahate; Engineer: Sarthak Tekade; Chartered Accountant: Naveen Tripathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ave Maria Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ave Maria Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ave Maria Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.