ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / Aurum Subhalaya

Registered No litigation declared Residential / Group Housing project

Aurum Subhalaya

By Auracon Infra Prop. Manoj Kapurchand Kala

RG-MH-08711 · RERA P51500022033 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 53 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 53 months from the original
21 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Aurum Subhalaya is a Residential / Group Housing project by Auracon Infra Prop. Manoj Kapurchand Kala in Aurangabad, Maharashtra, registered with MahaRERA as P51500022033 on 25 Aug 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 53 months from the original filing.

At a glance

Project

  • NameAurum Subhalaya
  • TypeResidential / Group Housing
  • Location
    • Beed Bypass
    • Satara Parisar
    • Devlai
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500022033
  • ReraGenie IDRG-MH-08711

Builder

  • NameAuracon Infra Prop. Manoj Kapurchand Kala
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2019First promiseJul 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Aug 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Jul 2023)
  • Buildings3 building records
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA107000
B WingNA97000
C WingNA97000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 95%.

A Wing90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B Wing87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
C Wing39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes65%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes65%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes65%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes20%
Open ParkingYes0%

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered42
Open Space30
BuildingClosed/CoveredOpen SpaceTotal
A Wing141024
B Wing141024
C Wing141024

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,840 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Shobha HouzwalaAurangabad (M Corp.)Aurangabad
Manoj Kapurchand KalaGarkhedaAurangabad
Manisha Ramesh MundheAurangabad (M Corp.)Aurangabad
Neeraj Kulbhushan TaandonAurangabad (M Corp.)Aurangabad
Mystical RadianceAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation, Aurangabad
Permissible FSI6470.52
Proposed, not sanctioned6,471 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSpace Olympia, Sutgirni Chowk, Aurangabad

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaurabh Deshmukh
Engineerrajesh kala
EngineerER SHRIPAD DESHMUKH
Chartered AccountantAmol Kapurchandji Kala
PartnerRole in project
Auracon Infra Prop. Manoj Kapurchand Kala-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500013248Jul 2023 → Dec 2024

Reason as filed by the promoterDue to Technical Issues we requested the Extension and Agreed by more than 51% Purchasers

EXT51500027971Jul 2023 → Dec 2027

Reason as filed by the promoterThe said project completion is pending due to non completion of MHADA building. That Building Publication is delayed By MHADA and which is done in the year 24-25 so 2 years time period required to complete the MHADA building by the Land Owner of the Project . The Land Owner already taken RERA for MHADA building and it her responsiblity to complete the same. So we required time 31/12/2027 to get the completion certificate from the Authority.... Hence we required extension .... consent also obtained from the Allottees.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Mar 26.pdf28 May 2026
Form 2File: Form-2 Mar 26.pdf28 May 2026
Form 3File: Form-3 Mar 26.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Mar 26.pdf28 May 2026
Form 2A (FY 2019-2020)File: 1 Form 2A 2019-20.pdf26 May 2026
Form 2A (FY 2020-2021)File: 2 Form 2A 2020-21.pdf26 May 2026
Form 2A (FY 2021-2022)File: 3 Form 2A 2021-22.pdf26 May 2026
Form 2A (FY 2022-2023)File: 4 Form 2A 2022-23.pdf26 May 2026
Form 2A (FY 2023-2024)File: 5 Form 2A 2023-24.pdf26 May 2026
Form 2A (FY 2024-2025)File: 6 Form 2A 2024-25.pdf26 May 2026
Form 2A (FY 2025-2026)File: 7 Form 2A 2025-26.pdf26 May 2026
Form 1File: 1 Form 1 SEP 25.pdf6 May 2026
Form 2File: 2 Form 2 SEP 25.pdf6 May 2026
Form 3File: 3 Form 3 - Sep 25.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: 4 Sold Sep 25.pdf6 May 2026
Form 1File: Form-1 Dec 25.pdf1 Apr 2026
Form 2File: Form-2 Dec 25.pdf1 Apr 2026
Form 3File: Form-3 Dec 25.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD DEC 25.pdf1 Apr 2026
Form 1File: 1 Form-1 June 25.pdf1 Apr 2026
Form 2File: 2 Form-2 June 25.pdf1 Apr 2026
Form 3File: 3 Form-3 Jun 25.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: 4 Sold Jun 25.pdf1 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Mar 25.pdf1 May 2025
Certificates of CA (Form 3)File: 4 Form 3 Mar 25.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Mar 25.pdf1 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Mar 2024.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Sep 2024 .pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Dec 2024.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 2024.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-2024.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Mar 2024.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Sep 2024 .pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Dec 2024.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 2024.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-2024.pdf14 Apr 2025
Declaration in FORM BFile: Form- B Manoj Kala.pdf12 Apr 2025
Declaration in FORM BFile: Form- B Manoj Kala.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form-1 Mar-23.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form-1 Jun-23.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form-1 Sep-23.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form-1 Dec-23.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form-2 Mar-23.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form-2 Jun-23.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form-2 Sep-23.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form-2 Dec-23.pdf15 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 13 Form 2A Mar-23.pdf15 Mar 2024
Disclosure of sold/ booked inventoryFile: 14 Disc of Booking Mar-23.pdf15 Mar 2024
Disclosure of sold/ booked inventoryFile: 17 Dis of Booking Dec-23.pdf15 Mar 2024
Certificates of CA (Form 3)File: 9 Form-3 Declaration Mar-23.pdf15 Mar 2024
Certificates of CA (Form 3)File: 10 Form-3 Declaration Jun-23.pdf15 Mar 2024
Certificates of CA (Form 3)File: 11 Form-3 Declaration Sep-23.pdf15 Mar 2024
Certificates of CA (Form 3)File: 12 Form-3 Declaration Dec-23.pdf15 Mar 2024
Details of encumbrances concerned to FinanceFile: No ENC.pdf25 Jan 2023
Details of encumbrances concerned to LegalFile: No ENC.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5 march 22.pdf25 Jan 2023
Certificates of CA (Form 3)File: Aurum Form 3compressed.pdf12 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch cert march 2022_compressed.pdf20 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2022.pdf20 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A march 2022.pdf20 Jun 2022
Disclosure of sold/ booked inventoryFile: sold un sold march 2022.pdf20 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2021.pdf14 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2021.pdf14 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Dec 2021.pdf14 Mar 2022
Disclosure of sold/ booked inventoryFile: Sol Unsold_compressed.pdf14 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200225726322_For_Asset_Based_Search_11_12_2021_19_52_59_513.pdf11 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf13 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf13 Oct 2021
Disclosure of sold/ booked inventoryFile: Inventory Discloser_compressed.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2Amarch.pdf16 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Commpressed.pdf15 Aug 2021

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 53 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Aurum Subhalaya on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Satara Parisar1,400+ in Aurangabad

2 kmAurum SubhalayaCompleted 14Lapsed / revoked 14Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: Auracon Infra Prop. Manoj Kapurchand Kala

Auracon Infra Prop. Manoj Kapurchand Kala has 1 registration on MahaRERA, including Aurum Subhalaya. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Aurum Subhalaya is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aurum Subhalaya?

The registered promoter entity is Auracon Infra Prop. Manoj Kapurchand Kala, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aurum Subhalaya?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aurum Subhalaya?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aurum Subhalaya?

The professionals named in the filing: Architect: Saurabh Deshmukh; Engineer: rajesh kala; Engineer: ER SHRIPAD DESHMUKH; Chartered Accountant: Amol Kapurchandji Kala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aurum Subhalaya?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aurum Subhalaya. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aurum Subhalaya to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.