Home / Browse projects / Pune, Maharashtra / AURA DIVINE

Completed No litigation declared Residential / Group Housing project

AURA DIVINE

By RANAWAT REALTORS

RG-MH-50720 · RERA P52100054869 · Last updated on MahaRERA portal: 30 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Stilt Floor, 0%
11 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

AURA DIVINE is a Residential / Group Housing project by RANAWAT REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100054869 on 15 Feb 2024. The registration is recorded completed; possession was promised by 30 Dec 2026. 1 of the 12 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAURA DIVINE
  • TypeResidential / Group Housing
  • Location
    • Survey No 589B
    • Plot No.40
    • Bibvewadi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411037
  • Pincode411037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054869
  • ReraGenie IDRG-MH-50720

Builder

  • NameRANAWAT REALTORS
  • Entity typePartnership
  • GSTIN27ABEFR5583L1ZK
  • PartnersSushil Vilas Jain, Prince Prakash Kankariya, Meet Mahavir Oswal, Mahavir Jalamchand Oswal

Key dates

this monthRegisteredFeb 2024PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Feb 2024
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

8%1 of 12 units booked

Figures as on 30 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AURA DIVINENA4412012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

AURA DIVINE: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area502 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Sep 2024
LandownerVillageDistrict
Mr Vijaykumar Devichand NibjiyaMarket YardPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI1650.0
Proposed, not sanctioned1,606 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3,4,5 and 10, ADITI APARTMENTS, 344/1 NARAYAN PETH NEAR MODI GANAPATI, PUNE MAHARASHTRA 4110

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. Sachin Solanki
EngineerMr.Parag Chopada
EngineerSiddhant Milind Adhav
Chartered AccountantM/s. Golesha and Company
Chartered AccountantPatel & Sharma
Chartered AccountantMilan Shah
PartnerRole in project
RANAWAT REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_Aura Divine_Q4-31 Mar 2024.pdf30 Jan 2026
Form 2File: Form 2_Aura Divine_Q4-31 Mar 2024.pdf30 Jan 2026
Form 3File: Form 3_Aura Divine_Q4-31 Mar 2024.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: RERA Sold and Unsold Inventory_Aura Divine_31 Mar 24.pdf30 Jan 2026
Form 1File: Architect Certificate Aura Divine 2-7-24.pdf30 Jan 2026
Form 2File: Form 2.pdf30 Jan 2026
Form 3File: Form 3 New Aura Divine Upto 30-06-2024_ Rotated.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: Aura Divine RERA Sold Unsold Inventory.pdf30 Jan 2026
Form 1File: Aura Divine (Architect Certificate).pdf30 Jan 2026
Form 2File: Form 2 - Sept 24.pdf30 Jan 2026
Form 3File: Q2 Aura Divine RERA Form 3.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: Aura Divine RERA Sold Unsold Inventory.pdf30 Jan 2026
Form 1File: Ranawat Realtors Aura Divine Form 1.pdf30 Jan 2026
Form 2File: Form-2 AURA DIVINE Dec 24.pdf30 Jan 2026
Form 3File: Form-3.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: RERA Sold and Unsold Inventory Aura Divine.pdf30 Jan 2026
Form 1File: Form 1 Aura Divine.pdf30 Jan 2026
Form 2File: Form 2 Aura Divine.pdf30 Jan 2026
Form 3File: Form 3 New organized.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: RERA Sold and Unsold Inventory Aura Divine.pdf30 Jan 2026
Form 1File: Architect Certificate-Form 1- Divine.pdf30 Jan 2026
Form 2File: Aurav Divine-Form2-Engg_Certificate.pdf30 Jan 2026
Form 3File: Form 3 New Aura Divine Upto 31-12-25.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf30 Jan 2026
Form 5 (FY 2023-2024)File: RANAWAT REALTORS.pdf30 Jan 2026
Form 2A (FY 2024-2025)File: From 2A_Aura Divine.pdf15 Nov 2025
Form 1File: Form 1.pdf29 Oct 2025
Form 2File: Form 2_Aura Divine_Engineer Certificate.pdf29 Oct 2025
Form 3File: Form 3 New Aura Divine Upto 30-09-25.pdf29 Oct 2025
Disclosure of Sold and Booked InventoryFile: Aura Divine RERA Sold & Unsold Data.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Ranawat Realtors-Aura Divine-ok.pdf6 Oct 2025
Form 1File: Architect Certificate Aura Divine.pdf24 Jul 2025
Form 2File: Form -2 Engineers Certificate (Aura Divine).pdf24 Jul 2025
Form 3File: FORM 3 Aura Divine.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Aura Divine RERA Sold - Unsold .pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aura Divine.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New organized.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Aura Divine).pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sept 24.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 AURA DIVINE Dec 24.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Dec 24.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Dec 24.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RANAWAT REALTORS.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ranawat Realtors.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 Aura Divine RERA Form 3.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aura Divine (Architect Certificate).pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Aura Divine RERA Sold Unsold Inventory.pdf17 Oct 2024
Proforma of Agreement for saleFile: Yashwant.pdf17 Aug 2024
Layout approvalFile: Aura Divine_compressed.pdf13 Aug 2024
Copy of Layout Approval (in case of layout)File: Aura Divine_compressed.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aura Divine.pdf19 Jul 2024
Layout approvalFile: Aura Divine-Revised full sanction_11zon.pdf16 Jul 2024
Copy of Layout Approval (in case of layout)File: Aura Divine-Revised full sanction_11zon.pdf16 Jul 2024
Declaration about Commencement CertificateFile: 20240716131753.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (Aura Divine 2-7-24.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Aura Divine RERA Sold Unsold Inventory.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Aura Divine Upto 30-06-2024_ Rotated.pdf16 Jul 2024
Layout approvalFile: Layout Approval - Highlight.pdf2 Jul 2024
Building plan approvalFile: Layout Approval - Highlight.pdf2 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout Approval - Highlight.pdf2 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Approval - Highlight.pdf2 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Aura Divine_Q4-31 Mar 2024.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Aura Divine_Q4-31 Mar 2024.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Aura Divine_Q4-31 Mar 2024.pdf11 May 2024
Proforma of Agreement for saleFile: Draft Agreement for Sale.pdf8 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report -4.pdf8 Feb 2024
Other - TechnicalFile: SS for Order 45.pdf30 Jan 2024
Layout approvalFile: Sanction Plan - Aura Divine_Highlighted.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan - Aura Divine_Highlighted.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Updated_rotated.pdf12 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Authority Letter.pdf11 Jan 2024
Proforma of Allotment letterFile: Allotment Letter.pdf11 Jan 2024
Other - TechnicalFile: Authority Letter.pdf11 Jan 2024
Copy of the legal title reportFile: Updated Legal Title Report.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sushil Sir.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Vishal Sir.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Mahavir Sir.pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Meet Sir.pdf6 Jan 2024

How this compares with Pune

8%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AURA DIVINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bibvewadi13,700+ in Pune

2 kmAURA DIVINECompleted 37Lapsed / revoked 26Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: RANAWAT REALTORS

RANAWAT REALTORS has 1 registration on MahaRERA, including AURA DIVINE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AURA DIVINE is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AURA DIVINE?

The registered promoter entity is RANAWAT REALTORS, a partnership as per the filing. Its GSTIN 27ABEFR5583L1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AURA DIVINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AURA DIVINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AURA DIVINE?

The professionals named in the filing: Architect: Mr. Sachin Solanki; Engineer: Mr.Parag Chopada; Engineer: Siddhant Milind Adhav; Chartered Accountant: M/s. Golesha and Company; Chartered Accountant: Patel & Sharma; Chartered Accountant: Milan Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AURA DIVINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AURA DIVINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AURA DIVINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.