Atmosphere O2 Tower-G

By Atmosphere Realty Pvt Ltd

RG-MH-99632 · RERA P51800033845 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • Rs 405.00 crore secured on the land, in favour of Aditya Birla Finance Ltd

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 57%
185 of 435Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Atmosphere O2 Tower-G is a Residential / Group Housing project by Atmosphere Realty Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033845 on 14 Mar 2022. Possession is promised by 31 Dec 2028. 250 of the 435 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameAtmosphere O2 Tower-G
  • TypeResidential / Group Housing
  • Location
    • GM Road
    • Chembur (West)
    • Kurla
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800033845
  • ReraGenie IDRG-MH-99632

Builder

  • NameAtmosphere Realty Pvt Ltd
  • Entity typeCompany
  • DirectorNavin Amarlal Makhija
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

57%250 of 435 units booked
43.0%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Atmosphere O2 Tower-GNA51474350435

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 57%.

Atmosphere O2 Tower-G: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises44%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks46%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,122 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Ltd
Secured amountRs 405.00 crore
CERSAI search filedYes
Declared on15 Sep 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI34823.0
Proposed, not sanctioned21,909 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANDRA WEST MUMBAI
Estimated costRs 302.43 cr
Cost incurredRs 130.07 cr
Work done43.01%
BuildingWingEstimatedIncurred
Atmosphere O2 Tower-GNARs 272.19 crRs 124.86 cr
-NARs 30.24 crRs 5.20 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre and Associates Pvt Ltd
EngineerJW Consultant LLP
EngineerMillion Jobs Private limited
Chartered AccountantTaishete Mehta Associates
Chartered AccountantMA Parikh Shah & Associates LLP
Chartered AccountantN.A Shah Associates LLP
PartnerRole in project
Atmosphere Realty Pvt Ltd-

Litigation declared4

CaseCourtStatus
629/2013Bombay High CourtDisposed off
35/2015High CourtDISPOSED OFF
599/2015High CourtPending
609/2014Bombay High CourtPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 - Atmosphere Tower G - 2025-26.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1 (2).pdf10 Dec 2025
Withdrawal Update Form 1File: Form 1 (2).pdf10 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf10 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf10 Dec 2025
Withdrawal Update Form 3File: Form 3 - Atmosphere Tower G Sep-25 Final Signed_11zon.pdf10 Dec 2025
Withdrawal Update Form 3File: Form 3 - Atmosphere Tower G Sep-25 Final Signed_11zon.pdf10 Dec 2025
Form 5 (FY 2024-2025)File: SIGNED FORM5 FY 24-25 ATMOSHPHERE TOWER G.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Tower G.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower G.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Tower G.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Atmosphere O2 Tower-G Sept 24_compressed.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 Tower G R1.pdf27 Nov 2024
Details of encumbrancesFile: Mortgage undertaking.pdf17 Oct 2024
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_200059714264- Tower G.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ATMOSPHERE-O2G-FORM 5.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form1 G Tower.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Tower-G_March 24.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Atmosphere O2 Tower G.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_AtmosphereO2 Tower G dec-22.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate_AtmosphereO2 Tower G_Mar23.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Tower-G Jun-23.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_AtmosphereO2 Tower G_sep-23.pdf2 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Atmosphere O2 Tower-G Jun-23.pdf2 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Atmosphere O2 Tower-G Jun-23-compressed.pdf2 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ATMOSPHERE-FORM-5-O2-TOWER G- FY-22-23.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 AtmosphereO2 Tower G.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect AtmosphereO2 TowerG Jun22 Signed BW.pdf9 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate_Tower-G_Sep-22.pdf9 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Tower-G Jun-22.pdf9 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Signed Architect TowerG Mar 22.pdf8 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed TowerG Mar 22.pdf8 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AtmoshereO2 Tower G Mar 22 compressed.pdf8 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 AtmosphereO2 Tower G.pdf8 Jul 2022
Copy of the legal title reportFile: Supplemental Title Report 10 03 2022.PDF21 Jun 2022
Layout approvalFile: 1 Ground floor plan.pdf11 Mar 2022
Layout approvalFile: First floor plan-compressed.pdf11 Mar 2022
Layout approvalFile: 2nd and 3rd floor plan-compressed.pdf11 Mar 2022
Layout approvalFile: 4th floor plan_compressed.pdf11 Mar 2022
Layout approvalFile: Typical floor plan_compressed.pdf11 Mar 2022
Layout approvalFile: Refuge floor plan_compressed.pdf11 Mar 2022
Copy of Layout Approval (in case of layout)File: 1 Ground floor plan.pdf11 Mar 2022
Copy of Layout Approval (in case of layout)File: First floor plan-compressed.pdf11 Mar 2022
Copy of Layout Approval (in case of layout)File: 2nd and 3rd floor plan-compressed.pdf11 Mar 2022
Copy of Layout Approval (in case of layout)File: 4th floor plan_compressed.pdf11 Mar 2022
Copy of Layout Approval (in case of layout)File: Typical floor plan_compressed.pdf11 Mar 2022
Copy of Layout Approval (in case of layout)File: Refuge floor plan_compressed.pdf11 Mar 2022
Proforma of Allotment letterFile: Declaration for Allotment letter.pdf11 Mar 2022
Layout approvalFile: Block plan Signed_compressed.pdf8 Mar 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT RERA Format_compressed.pdf8 Mar 2022
Copy of Layout Approval (in case of layout)File: Block plan Signed_compressed.pdf8 Mar 2022
Declaration in FORM BFile: Form-B revised_compressed.pdf8 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_AtmosphereO2 Tower G compressed.pdf8 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate.pdf8 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200231098827.pdf25 Feb 2022
CERSAI detailsFile: CTS NO 848 TOWER-G.pdf25 Feb 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf24 Feb 2022
Building plan approvalFile: WING-G _TYPICAL FLOOR PLAN.pdf23 Feb 2022
Building plan approvalFile: Amended Plan Approval Letter IOD 30122021.pdf23 Feb 2022
Layout approvalFile: 20220222_Block plan for RERA.pdf23 Feb 2022
PAN CardFile: Atmosphere Realty Pan Card.pdf23 Feb 2022
Copy of the legal title reportFile: Legal title report.pdf23 Feb 2022
Details of encumbrancesFile: Letter of Encumbrances.pdf23 Feb 2022
Copy of Layout Approval (in case of layout)File: 20220222_Block plan for RERA.pdf23 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Approval Letter IOD 30122021.pdf23 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: WING-G _TYPICAL FLOOR PLAN.pdf23 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: CC DEF 47 G Plinth Comm 18 18022022.pdf23 Feb 2022
Declaration in FORM BFile: FORM B NEW-compressed.pdf23 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower G 230222_compressed.pdf23 Feb 2022
Proforma of Allotment letterFile: AgreementForSale-Phase-Building-G.pdf23 Feb 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Atmosphere O2P51800019950Chembur (West), Mumbai Suburban830Mar 2019OngoingDec 2026Not due yet

How this compares with Mumbai Suburban

57%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Atmosphere O2 Tower-G on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur (West)6,700+ in Mumbai Suburban

Builder: Atmosphere Realty Pvt Ltd

Atmosphere Realty Pvt Ltd has 4 registrations on MahaRERA, including Atmosphere Phase 1 and Atmosphere O2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Atmosphere O2 Tower-G is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Atmosphere O2 Tower-G?

The registered promoter entity is Atmosphere Realty Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Atmosphere O2 Tower-G?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Atmosphere O2 Tower-G?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Atmosphere O2 Tower-G?

The professionals named in the filing: Architect: Sandeep Shikre and Associates Pvt Ltd; Engineer: JW Consultant LLP; Engineer: Million Jobs Private limited; Chartered Accountant: Taishete Mehta Associates; Chartered Accountant: MA Parikh Shah & Associates LLP; Chartered Accountant: N.A Shah Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Atmosphere O2 Tower-G?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Atmosphere O2 Tower-G. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Atmosphere O2 Tower-G to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.