ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Gami and Jaydeep Elanza

Registration lapsed No litigation declared Others project

Gami and Jaydeep Elanza

By M/S REAL INFRASTRUCTURE CO

RG-MH-35701 · RERA P51800047428 · Last updated on MahaRERA portal: 30 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
18 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
65 of 175Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Gami and Jaydeep Elanza is a Others project by M/S REAL INFRASTRUCTURE CO in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047428 on 31 Oct 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 110 of the 175 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameGami and Jaydeep Elanza
  • TypeOthers
  • Location
    • TILAK NAGAR
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • RERA no.P51800047428
  • ReraGenie IDRG-MH-35701

Builder

  • NameM/S REAL INFRASTRUCTURE CO
  • Entity typePartnership
  • PartnersAMBALAL GAMI, KESHAVJI MINAT
  • Other registrations4 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

4 months past promisethis monthRegisteredOct 2022First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Oct 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed70 files

Current status

63%110 of 175 units booked
98.3%Work done, per cost certificate

Figures as on 30 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA171678886
B WingNA171689089

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

A wing90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,669 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Nov 2025
LandownerVillageDistrict
Tilak Nagar Siddheshwar CHS LtdKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI11032.2
Proposed, not sanctioned11,031 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKURLA WEST
Estimated costRs 60.00 cr
Cost incurredRs 59.01 cr
Work done98.34%
BuildingWingEstimatedIncurred
A wingNARs 28.88 crRs 28.50 cr
B WingNARs 28.88 crRs 28.50 cr
-NARs 2.24 crRs 2.01 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcho consultants
Engineerassociated structural negineer llp
EngineerZUBER JAGIRDAR
Chartered AccountantNEHALI & CO
Chartered AccountantJIMIT SHAH
PartnerRole in project
M/S REAL INFRASTRUCTURE CO-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05012619294Dec 2025 → Jun 2026

Reason as filed by the promoter1. Delay Due to Pile Collapse and Drainage Line Damage During Excavation: During the excavation stage, one of the piles collapsed and the drainage line was adversely affected, necessitating urgent rectification work. As a result, the project experienced an unavoidable delay of approximately 7 to 8 months. 2. Delay Due to Stop Work Notice Issued Pursuant to Objections Raised by Existing Developer through MHADA: The project was further delayed due to issuance of a Stop Work Notice by the competent authority pursuant to objections raised by the existing developer, M/s Global Homes Developer, befo

Litigation declared2

CaseCourtStatus
278/2022/2022HIGH COURT MUMBAIDisposed off
483/2019/2019HIGH COURT MUMBAIDisposed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Archo-Form 1 Architect Certificate (01-04-2026) Elanza.pdf30 Jul 2026
Withdrawal Update Form 2File: ASC-Form 2 Engineers Certificate (23-07-2026) Elanza.pdf30 Jul 2026
Withdrawal Update Form 3File: CA Form 3.pdf30 Jul 2026
Withdrawal Update Form 1File: Form-1-Elanza.pdf28 May 2026
Withdrawal Update Form 2File: Form-2-Elanza.pdf28 May 2026
Withdrawal Update Form 3File: Form-3-Elanza.pdf28 May 2026
Withdrawal Update Form 1File: Form 1- Architect Certificate.pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2- Engineers Certificate (Elanza).pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3- CA Certificate.pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1 (Architects Certificate)-Elanza.pdf5 Jan 2026
Withdrawal Update Form 2File: Form 2 (Engineers Certificate)-Elanza.pdf5 Jan 2026
Withdrawal Update Form 3File: Form-3 ( CA Certificate)-Elanza.pdf5 Jan 2026
Withdrawal Update Form 1File: Form-1-Elanza.pdf20 Dec 2025
Withdrawal Update Form 2File: Form-2-Elanza.pdf20 Dec 2025
Withdrawal Update Form 3File: Form-3 ( CA Certificate)-Elanza.pdf20 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A (Elanza).pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 (Elanza).pdf30 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-CA Certificate-Elanza (37).pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Architects Certificate-Elanza (37).pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Elanza.pdf21 Apr 2025
Layout approvalFile: IOA Full Plan.pdf20 Jan 2025
Building plan approvalFile: Full Amended Letter.pdf20 Jan 2025
Copy of Layout Approval (in case of layout)File: IOA Full Plan.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Full Amended Letter.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Architects Certificate-Elanza.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-CA Certificate-Elanza.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 -Engineers Certificate-Elanza.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 ( Architect's Certificate)-Elanza.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 ( Engineers Certificate)-Elanza.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 ( CA Certificate)-Elanza.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 23.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certificate Dec 23.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 BLDG NO 37 TN (Architect Certificate).pdf4 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2419__Real Infrastructure_Bldg NO 37__FORM 2.pdf4 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5 22-23.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf2 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Certificate Gami and Jaydeep Elenza.pdf6 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate.pdf24 Aug 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf17 Aug 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrance.pdf17 Aug 2023
Proforma of Agreement for saleFile: Draft Sale Agreement.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf13 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf13 Jun 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance(Financial).pdf21 Oct 2022
Details of encumbrances concerned to LegalFile: No Encumbrance(Financial).pdf21 Oct 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER new format.pdf21 Oct 2022
Proforma of Agreement for saleFile: Final agreement real infra.pdf21 Oct 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate Financial.pdf15 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sign.pdf3 Oct 2022
Declaration about Commencement CertificateFile: CC declaration.pdf1 Oct 2022
Building plan approvalFile: IOA.pdf30 Sep 2022
Layout approvalFile: IOA PLANS.pdf30 Sep 2022
PAN CardFile: pan card real infrastructure.pdf30 Sep 2022
Copy of the legal title reportFile: Legal Report Dt.pdf30 Sep 2022
Details of encumbrances concerned to LegalFile: Encumbrance Decleration Legal.pdf30 Sep 2022
Copy of Layout Approval (in case of layout)File: IOA PLANS.pdf30 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf30 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 Sep 2022
Declaration in FORM BFile: Form B (Real Infra Structure co).pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 20-9-2022.pdf30 Sep 2022
CERSAI detailsFile: Cersai Decleration.pdf30 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Letter axis bank.pdf30 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviatoion Report of Allotment Letter.pdf30 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviatoion Report of Aggrement.pdf30 Sep 2022

How this compares with Mumbai Suburban

63%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gami and Jaydeep Elanza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

Builder: M/S REAL INFRASTRUCTURE CO

M/S REAL INFRASTRUCTURE CO has 5 registrations on MahaRERA, including Gami and Jaydeep Elanza and Gami and Jaydeep Ventura Commercial Hub. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Gami and Jaydeep Elanza shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Gami and Jaydeep Elanza is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gami and Jaydeep Elanza?

The registered promoter entity is M/S REAL INFRASTRUCTURE CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gami and Jaydeep Elanza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gami and Jaydeep Elanza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gami and Jaydeep Elanza?

The professionals named in the filing: Architect: Archo consultants; Engineer: associated structural negineer llp; Engineer: ZUBER JAGIRDAR; Chartered Accountant: NEHALI & CO; Chartered Accountant: JIMIT SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gami and Jaydeep Elanza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gami and Jaydeep Elanza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gami and Jaydeep Elanza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.