Registered No litigation declared Residential / Group Housing project

Srushti Raj Siddhi

By CHINNAIAH VENKATESH GOWDA

RG-MH-09605 · RERA P51800002790 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • 17 complaints at MahaRERA
  • Completion date moved by 60 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 60 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 53%
45 of 133Units unsoldnot recorded sold or booked
17Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Srushti Raj Siddhi is a Residential / Group Housing project by CHINNAIAH VENKATESH GOWDA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002790 on 4 Aug 2017. Possession is promised by 25 Dec 2027. The completion date has moved by 60 months from the original filing. 88 of the 133 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 17 complaints are on record with the regulator.

At a glance

Project

  • NameSrushti Raj Siddhi
  • TypeResidential / Group Housing
  • Location
    • Road No. 13
    • Tilak Nagar
    • Kurla
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002790
  • ReraGenie IDRG-MH-09605

Builder

  • NameCHINNAIAH VENKATESH GOWDA
  • Entity typeIndividual
  • Other registrations8 more →
  • No longer live6 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Aug 2017
  • Promised completion25 Dec 2027
  • Revised completionRevised to 25 Dec 2027 (originally 25 Dec 2022)
  • Buildings1 building record
  • Documents filed81 files

Current status

66%88 of 133 units booked
53.0%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Srushtiraj Siddhi A and B WingNA18171330133

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 53%.

Srushtiraj Siddhi A and B Wing: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure53%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes8%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes5%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered45

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,201 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY (MHADA)
Permissible FSI6065.91
Proposed, not sanctioned6,066 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai Commercial Annex BKS Devashi Marg Govandi East
Estimated costRs 28.94 cr
Cost incurredRs 15.34 cr
Work done53.0%
BuildingWingEstimatedIncurred
Srushtiraj Siddhi A and B WingNARs 28.94 crRs 15.34 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIqbal Singh
EngineerAssociated Consultants through its Proprietor Mr Vikas Vinayak Gokhale
EngineerNeeraj Dubey
Chartered AccountantOmprakash Mishra
Chartered AccountantSuresh Agarwal
Chartered AccountantVishal Kumar Shaw
Chartered AccountantNITIN VARE
PartnerRole in project
CHINNAIAH VENKATESH GOWDA-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012183Dec 2022 → Dec 2023

Reason as filed by the promoterWe could not get the required approvals from MHADA in the right timeframe due to the ongoing pandemic and price fluctuations due to war which has caused the project's delay. Therefore we request you to extend the expiry date of the project under section 6 of Real Estate (Regulation and Development Act, 2016)

EXT51800018122Dec 2022 → Dec 2025

Reason as filed by the promoterDelay due to pandemic affects and new guidelines from BMC for pollution control which are resulting in expenses unaccounted for and therefore need more time to mitigate.

EA25122519004Dec 2022 → Dec 2027

Reason as filed by the promoterDue to materialsourcing difficulty, Labour team deficiency resulting from continuous rain through out the year which restricted construction. The project is 70 percent completed and the balance shall be completed within the proposed timeline

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC006000000197791Vilas KesarkarChinnaiah Gowda28/07/2021
CC006000000364528prakash pralhad tanksaleChinnaya Gauda28/02/2023
CC006000000479869Sunil Sadashiv KanseSrushti Raj Enterprises India Ltd.31/03/2024
CC006000000479859Sujit V NairSrushti Raj Enterprises India Ltd.31/03/2024
CC12500410Sandesh Vilas PatkarCHINNAIAH VENKATESH GOWDA07/02/2025
CC12503946Jignesh ShahCHINNAIAH VENKATESH GOWDA10/11/2025
CC12504385Savalaram Ganpat AgawaneCHINNAIAH VENKATESH GOWDA09/12/2025
CC12504203Avinash PoreCHINNAIAH VENKATESH GOWDA28/11/2025
CC12504382Sudam Laxman GiteCHINNAIAH VENKATESH GOWDA09/12/2025
CC12504384Sharad Rambhau GhugeCHINNAIAH VENKATESH GOWDA09/12/2025
CC12504469Tanvvi NaikCHINNAIAH VENKATESH GOWDA15/12/2025
CC12504470suhas desaiCHINNAIAH VENKATESH GOWDA15/12/2025
CC12604151CHINNAIAH VENKATESH GOWDASHARAD RAMBHAU GHUGE02/07/2026
CC12604166CHINNAIAH VENKATESH GOWDAsudam laxman gite and manisha sudam gite03/07/2026
CC12604228CHINNAIAH VENKATESH GOWDATanvi Amey Naik06/07/2026
CC12604237CHINNAIAH VENKATESH GOWDASavita Suhas Desai Suhas Sadanand Sesai06/07/2026
CC12604244CHINNAIAH VENKATESH GOWDASavalaram Ganpat Agawane Sangeeta Savalaram Agawane06/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 105.pdf24 Apr 2026
Withdrawal Update Form 2File: Bldg No 105 Form 2.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3 105 Dec 25.pdf24 Apr 2026
Form 1File: 105 FORM 1 Q4 2425.pdf25 Dec 2025
Form 2File: 105 FORM 2 Q4 2425.pdf25 Dec 2025
Form 3File: 105 FORM 3 Q4 2425 COMP.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: 105 DISCLOSURE Q4 2425.pdf25 Dec 2025
Form 1File: FORM 1 Q1 2526.pdf25 Dec 2025
Form 2File: FORM 2 Q1 2526.pdf25 Dec 2025
Form 3File: FORM 3105 Q1 of FY 2025 COMP.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Q1 2526.pdf25 Dec 2025
Form 1File: FORM 1 Q1 2526.pdf25 Dec 2025
Form 2File: FORM 2 Q1 2526.pdf25 Dec 2025
Form 3File: FORM 3 Q2 FY 2025-26.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Q2 2526.pdf25 Dec 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 105 Rera FORM 1 29 01 2025.pdf23 Feb 2025
Certificates of CA (Form 3)File: FORM 3 Q3 FY 2425.pdf23 Feb 2025
Certificates of CA (Form 5)File: FORM 5 105.pdf23 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 105 q3.pdf23 Feb 2025
Disclosure of sold/ booked inventoryFile: 105_Disc Sold_Booked Inventory 31_12_24.pdf23 Feb 2025
Disclosure of sold/ booked inventoryFile: 4.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf10 Apr 2024
Building plan approvalFile: iod.pdf5 Apr 2024
Building plan approvalFile: iod.pdf5 Apr 2024
Building Plan Approval (IOD)File: iod.pdf5 Apr 2024
Building Plan Approval (IOD)File: iod.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A 105- 31-03-23.pdf12 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 105 22-23.pdf11 Dec 2023
Declaration in FORM BFile: form b 105_NOTARIZED.pdf9 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A 105-30-09-23.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE 105- 30-09-23.pdf9 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 2018-19.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-213.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf23 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: FCC 13 06 2023.pdf14 Jun 2023
Other - TechnicalFile: Bldg no 105 CC.pdf1 Jun 2023
Other - TechnicalFile: 1 (1)_11zon.pdf1 Jun 2023
Other - TechnicalFile: 2_11zon.pdf1 Jun 2023
Other - TechnicalFile: 05 Office Note 5.pdf29 May 2023
Other - TechnicalFile: MYSCAN_20230411_0004.PDF29 May 2023
Other - TechnicalFile: MYSCAN_20230411_0005.PDF29 May 2023
Other - TechnicalFile: MYSCAN_20230411_0003.PDF29 May 2023
Other - TechnicalFile: MYSCAN_20230411_0007.PDF29 May 2023
Other - TechnicalFile: MYSCAN_20230411_0008.PDF29 May 2023
Other - TechnicalFile: DOC.pdf13 Apr 2023
Other - TechnicalFile: NEW OFFER LETTER.pdf13 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 2018-19 Form 1 Final Architect Certificate Digital Signed.pdf19 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 2019-20 Form 1 Final Architect Certificate Digital Signed.pdf19 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 2020-21 Form 1 Final Architect Certificate Digital Signed_compressed.pdf19 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 2021-22 Form 1 Final Architect Certificate Digital Signed.pdf19 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FY 2020-21 Form 2A.pdf19 Sep 2022
Certificates of CA (Form 5)File: Final Form 5 105 Signed.pdf19 Sep 2022
Certificates of CA (Form 5)File: Final Form 5 -Signed.pdf19 Sep 2022
Certificates of CA (Form 5)File: Final Form 5 - Signed.pdf19 Sep 2022
Certificates of CA (Form 5)File: Final Form 5 Signed_compressed.pdf19 Sep 2022
Declaration about Commencement CertificateFile: Commencement Certificate.pdf5 Aug 2022
Disclosure of sold/ booked inventoryFile: Disclosure_compressed.pdf5 Aug 2022
CERSAI detailsFile: CERSAI_compressed.pdf5 Aug 2022
Proforma of Allotment letterFile: Allottment Letter1.pdf5 Aug 2022
Proforma of Allotment letterFile: sale (1)_compressed.pdf5 Aug 2022
Proforma of Allotment letterFile: sale (2)_compressed.pdf5 Aug 2022
Proforma of Allotment letterFile: sale (3)_compressed.pdf5 Aug 2022
Layout approvalFile: Amended Plan_compressed.pdf17 Oct 2019
Copy of Layout Approval (in case of layout)File: Amended Plan_compressed.pdf17 Oct 2019
Certificates of CA (Form 3)File: Form 3 Bldg 105 March 2018.pdf30 Jan 2019
Certificates of CA (Form 5)File: Form 5 CA Signed Bldg No105.pdf30 Jan 2019
Declaration in FORM BFile: Form B 105.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 1.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 2.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA Certificate 3.pdf28 Jul 2017
Certificates of CA (Form 5)File: CA Certificate 5.pdf28 Jul 2017
Proforma of Allotment letterFile: RERA Draft Agreement 105.pdf28 Jul 2017
Details of encumbrancesFile: IMG_20100101_0002.pdf10 Jul 2017
Layout approvalFile: PLAN.pdf8 Jul 2017
PAN CardFile: IMG_20100101_0001.pdf8 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf8 Jul 2017
Copy of Layout Approval (in case of layout)File: PLAN.pdf8 Jul 2017
Building plan approvalFile: pg 931 to 935 IOD_signed (4).pdf7 Jul 2017
Building Plan Approval (IOD)File: pg 931 to 935 IOD_signed (4).pdf7 Jul 2017

How this compares with Mumbai Suburban

66%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 60 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Srushti Raj Siddhi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tilak Nagar6,700+ in Mumbai Suburban

2 kmSrushti Raj SiddhiCompleted 171Lapsed / revoked 137Other 202Dot size: filed unitsN

Filed coordinates, straight-line distance. 510 registered projects within 2 km.

Builder: CHINNAIAH VENKATESH GOWDA

CHINNAIAH VENKATESH GOWDA has 9 registrations on MahaRERA, including SRUSHTIRAJ TOWER and Srushti Raj Siddhi. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Srushti Raj Siddhi is delayed beyond 25 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Srushti Raj Siddhi?

The registered promoter entity is CHINNAIAH VENKATESH GOWDA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Srushti Raj Siddhi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Srushti Raj Siddhi?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Srushti Raj Siddhi?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Srushti Raj Siddhi?

The professionals named in the filing: Architect: Iqbal Singh; Engineer: Associated Consultants through its Proprietor Mr Vikas Vinayak Gokhale; Engineer: Neeraj Dubey; Chartered Accountant: Omprakash Mishra; Chartered Accountant: Suresh Agarwal; Chartered Accountant: Vishal Kumar Shaw. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Srushti Raj Siddhi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Srushti Raj Siddhi. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Srushti Raj Siddhi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.