ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / ATHARVA SERENITY

Completed No litigation declared Residential / Group Housing project

ATHARVA SERENITY

By JMD BUILDERS AND DEVELOPERS

RG-MH-14827 · RERA P51600032471 · Last updated on MahaRERA portal: 15 May 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 23 documents Report an error

ATHARVA SERENITY is a Residential / Group Housing project by JMD BUILDERS AND DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600032471 on 4 Jan 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameATHARVA SERENITY
  • TypeResidential / Group Housing
  • Location
    • ANANDWALLI SHIVAR
    • NASHIK
    • Nashik (M Corp.)
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600032471
  • ReraGenie IDRG-MH-14827

Builder

  • NameJMD BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersCHANDRABHANUPRASAD DAROGA KUMBHAR, GURUGOVIND DAROGA KUMBHAR

Key dates

this monthRegisteredJan 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jan 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed23 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATHARVA SERENITYNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

ATHARVA SERENITY: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered7

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area368 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
JMD BUILDERS AND DEVELOPERSNashik (M Corp.)Nashik
ATUL GAJANAN CHAMPANERKARNashik (M Corp.)Nashik
PALLAVI ATUL CHAMPANERKARNashik (M Corp.)Nashik

Approvals and building plan

Permissible FSI585.34
Proposed, not sanctioned402 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHARANPUR RD NASHIK

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPravind s Lodhe
EngineerAbhishek Dnaneshwar kale
Chartered AccountantGeeta N Kale
PartnerRole in project
JMD BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Mar 2024

Documents filed23

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: architecturecertificateSIGN.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 [see Regulation 3]CA CERTIFICATE.pdf7 Mar 2024
Foreclosure of the ProjectFile: 1 Status of Conveyance.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg certificate.pdf1 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate (1) JMD.pdf1 Mar 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: JMD Buildersapartment dicleartion (2).pdf27 Jan 2024
Status of ConveyanceFile: JMD Buildersapartment dicleartion (2).pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEWFORM1 architect.pdf27 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW ENGINEERS form2.pdf27 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE atharva serenityupdated.pdf27 Dec 2021
Proforma of Allotment letterFile: 11deedandallotmentletter_merged.pdf27 Dec 2021
Building plan approvalFile: NMC PLAN COPY.pdf17 Dec 2021
Layout approvalFile: PLOTLAYOUT.pdf17 Dec 2021
PAN CardFile: 08 PAN FIRM PAN CARD.pdf17 Dec 2021
Copy of the legal title reportFile: 12 LEGAL TITLE REPORT.pdf17 Dec 2021
Details of encumbrancesFile: Letter to Encumbarnces.pdf17 Dec 2021
Copy of Layout Approval (in case of layout)File: PLOTLAYOUT.pdf17 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: NMC PLAN COPY.pdf17 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: 03 COMMECMENT.pdf17 Dec 2021
Declaration about Commencement CertificateFile: FORMDDECLARATION.pdf17 Dec 2021
Declaration in FORM BFile: MAHARERA Form B Declaration by Promoter.pdf17 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report_200226494504_For_Asset_Based_Search_23_12_2021_16_52_21_898.pdf17 Dec 2021
OtherFile: DEVELOPMENT AGREEMENT-1NEW.pdf17 Dec 2021

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATHARVA SERENITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmATHARVA SERENITYCompleted 47Lapsed / revoked 12Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: JMD BUILDERS AND DEVELOPERS

JMD BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including ATHARVA SERENITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if ATHARVA SERENITY is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATHARVA SERENITY?

The registered promoter entity is JMD BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATHARVA SERENITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATHARVA SERENITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATHARVA SERENITY?

The professionals named in the filing: Architect: Pravind s Lodhe; Engineer: Abhishek Dnaneshwar kale; Chartered Accountant: Geeta N Kale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATHARVA SERENITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATHARVA SERENITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATHARVA SERENITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.