Registration approved No litigation declared Residential/Group Housing project

Atharva Kanishka

By Atharva builders and developers

RG-KA-48054 · RERA PRM/KA/RERA/1257/334/PR/040524/006857 · Last updated on RERA Karnataka portal: 3 May 2024

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 99 documents Report an error

Atharva Kanishka is a Residential/Group Housing project by Atharva builders and developers in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/040524/006857 on 4 May 2024. Possession is promised by 25 Dec 2026.

At a glance

Project

  • NameAtharva Kanishka
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
    • 575004
  • Pincode575004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/040524/006857
  • ReraGenie IDRG-KA-48054

Builder

  • NameAtharva builders and developers
  • Entity typePartnership Firm
  • GSTIN29ABRFA5785G1ZR
  • Authorized SignatoryDhanraj Kumar
  • Other registrations6 more →
  • Declared earlier projects10 →

Key dates

this monthRegisteredMay 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 May 2024
  • Promised completion25 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Atharva Kanishka---29029

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 3 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 3 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area971 sq m
Named landowners2
LandownerVillageDistrict
RAMESH SHETTY K--
Atharva builders and developers--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.31 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 6.58 cr-
Payment of taxesRs 53.00 lakh-
On-site expenditure-Consultants FeesRs 10.00 lakh-
On-site expenditure-Site OverheadRs 5.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALVA AND ASSOCIATES
EngineerK ANIL HEGDE
Chartered AccountantSRINIVAS UDUPA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed99

As listed on the registration, under the names the promoter filed them with; the newest 80 of 99 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/040524/006857 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
project annual audit and quarterly updatedFile: previous project annual audit and quarterly updatated.pdf3 May 2024
chartered accountant certificate in prescribed format form -01File: CA CERTIFICATE @ Form 1.pdf3 May 2024
Sources of fund to complete the project with supporting documentsFile: Sources of Fund.pdf3 May 2024
updated financials with promoter signatureFile: FY 2022-23 Financials with promoter signature.pdf3 May 2024
advocate search reportFile: Advocate search report.pdf3 May 2024
JDA between landowner and developerFile: JDA.pdf3 May 2024
notarized non-litigation affidavitFile: AFFIDAVIT CUM DECLARATION.pdf3 May 2024
the plinth area and update the Area details properly as per the sanctioned drawing along with the AFile: PLINTH AREA CONSIDERED.pdf3 May 2024
the self-attested copy of the valid NOC issued by concerend Water Supply Authorities along with theFile: WATER NOC.pdf3 May 2024
Updated the plan well point.File: WELL POINT.pdf3 May 2024
Updated carpet areaFile: CARPET AREA KANISHKA.pdf3 May 2024
updated plinth areaFile: PLINTH AREA KANISHKA.pdf3 May 2024
Updated chartered accountant certificate in prescribed format form -01File: CA CERTIFICATE @.pdf19 Apr 2024
updated Total estimated cost of the project with CA certificateFile: CA CERTIFICATE @.pdf19 Apr 2024
Updated profit and loss account and balance sheet 2021-22 with CA UDIN along with scheduleFile: FY 21-22.pdf19 Apr 2024
Updated profit and loss account and balance sheet 2022-23 with CA UDIN along with scheduleFile: ATHARVA INCOME TAX SET 22-23.pdf19 Apr 2024
updated total estimated cost of the projectFile: ABSTRACT ESTIMATE.pdf19 Apr 2024
advocate search reportFile: advocate search report.pdf19 Apr 2024
deed of saleFile: deed of sale.pdf19 Apr 2024
notarized non-litigation affidavitFile: AFFIDAVIT CUM DECLARATION.pdf19 Apr 2024
updated Common Area Allottee and Common Area Alloted To Association on the projectFile: RERA COMMON ARE & AMENTIES.pdf19 Apr 2024
updated the Area details properly as per the sanctioned drawing along with the Area calculationFile: Required Details for RERA - Project Engineer Details - ATHARVA KANISHKA.pdf19 Apr 2024
Updated Amenities and Common area detailsFile: RERA COMMON ARE & AMENTIES.pdf19 Apr 2024
updated self-attested copy of the NOC issued by MESCOMFile: MESCOM NOC.pdf19 Apr 2024
upload the self-attested copy of the NOC issued by waterFile: WATER NOC.pdf19 Apr 2024
updated brief estimated cost of construction certified by the Engineer.File: ABSTRACT ESTIMATE.pdf19 Apr 2024
updated project name and project address and upload the signed copy of the project specification.File: SPECIFICATIONS.pdf19 Apr 2024
updated project name and project address and upload the section 3(1) notarized affidavit.File: AFFIDAVIT ACKNOWLEDGMENT.pdf19 Apr 2024
updated the Land cost calculation sheet as per the guidance valueFile: Land Cost.pdf19 Apr 2024
we have sufficient well water for the project attached well water pointFile: WELL POINT.pdf19 Apr 2024
area details updated in project details pageFile: AREA DETAILS UPDATED.pdf19 Apr 2024
FAR updatedFile: FAR Area.pdf19 Apr 2024
upadted certified carpet area calculation.File: CARPET AREA KANISHKA.pdf19 Apr 2024
updated CDP map showing the proposed site.File: CDP PLAN.pdf19 Apr 2024
updated village map showing the proposed site.File: village map.pdf19 Apr 2024
updated Height of the buildingFile: HEIGHT OF BUILDING.pdf19 Apr 2024
updated car parkingFile: PARKING DETAILS.pdf19 Apr 2024
updated commencement certificate.File: LICENSE.pdf19 Apr 2024
updated premium FARFile: FAR COPY.pdf19 Apr 2024
updated KSPCB NOCFile: PCB.pdf19 Apr 2024
updated relinquishment deed.File: GIFT DEED.pdf19 Apr 2024
RTC, survey 10/2B1A P, 10/2B1A-
Mutation, survey 10/2B1A P, 10/2B1A-
Encumbrance Certificate, survey 10/2B1A P, 10/2B1A-
Conversion/Alienation Order, survey 10/2B1A P, 10/2B1A-
Sale/Title/Gift Deed, survey 10/2B1A P, 10/2B1A-
Khatha, survey 10/2B1A P, 10/2B1A-
Registration CertificateFile: Form C.pdf-
Partnership DeedFile: Partership Deed - Atharva.PDF-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: CamScan_03-04-2024_10-16-44 CA certificate.pdf-
Certificate issued by Architect Form 2File: ARCHITECTS FORM (1).pdf-
Certificate issued by Engineer Form 3File: ENGINEER'S FORM.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: JOINT AFFIDAVIT CUM DECLARATION.pdf-
Certificate from Chartered AccountFile: CamScan_03-04-2024_10-16-44 CA certificate.pdf-
Balance Sheet 2022 - 2023File: ATHARVA INCOME TAX SET 23-24.pdf-
Balance Sheet 2021 - 2022File: FY 2022-23.pdf-
Balance Sheet 2020 - 2021File: atharva income tax 2021-22.pdf-
Audited Profit and Loss Statement 2022 - 2023File: ATHARVA INCOME TAX SET 23-24.pdf-
Audited Profit and Loss Statement 2021 - 2022File: FY 2022-23.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L Atharva 21-22.pdf-
Director's Report 2022 - 2023File: ATHARVA INCOME TAX SET 23-24.pdf-
Director's Report 2021 - 2022File: FY 2022-23_merged.pdf-
Director's Report 2020 - 2021File: atharva income tax 2021-22.pdf-
Cash Flow Statement 2022 - 2023File: ATHARVA INCOME TAX SET 23-24.pdf-
Cash Flow Statement 2021 - 2022File: FY 2022-23_merged.pdf-
Auditor's Report 2022 - 2023File: ATHARVA INCOME TAX SET 23-24.pdf-
Auditor's Report 2021 - 2022File: FY 2022-23_merged.pdf-
Auditor's Report 2020 - 2021File: atharva income tax 2021-22.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ATHARVA INCOME TAX SET 23-24.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: FY 2022-23_merged.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: atharva income tax 2021-22.pdf-
LICENSE-
PLAN-5-6-

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
ATHARVA PADMA KUSHABOLOOR 'B' VILLAGE URWA MARIGUDI MAIN ROAD OF MANGALORE TALUK WITHIN AND WITHIN NO. 26 DEREBAIL WARD OF MANGALORE CITY CORPORATION, WITHIN THE REGISTRATION SUB DISTRICT OF MANGALORE CITY, DAKSHINA KANNADA DISTRICTOngoingJun 2026Not delivered
ATHARVA GLORYATTAVARA VILLAGE PANDESHWARA WARD OF MANGALORE CITY CORPORATION WITHIN REGISTRATION SUB DISTRICT OF MANGALORE CITY 575001OngoingOct 2025Not delivered
ATHARVA KRISHNI87B KADRI VILLAGE, ANEGUNDI BEJAI, MANGALORE 575004Completed-No date filed

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Atharva Kanishka on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmAtharva KanishkaOther 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 122 registered projects within 2 km.

Builder: Atharva builders and developers

Atharva builders and developers has 7 registrations on RERA Karnataka, including Atharva Kanishka and Atharva Krishvi. Its filings declare 10 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Atharva Kanishka is delayed beyond 25 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Atharva Kanishka?

The registered promoter entity is Atharva builders and developers, a partnership firm as per the filing. Its GSTIN 29ABRFA5785G1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Atharva Kanishka?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Atharva Kanishka?

The professionals named in the filing: Architect: ALVA AND ASSOCIATES; Engineer: K ANIL HEGDE; Chartered Accountant: SRINIVAS UDUPA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Atharva Kanishka?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Atharva Kanishka. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Atharva Kanishka to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.