Home / Browse projects / Dakshina Kannada, Karnataka / MANDARA EXCELLENCY

Registration approved No litigation declared Residential/Group Housing project

MANDARA EXCELLENCY

By M S PRANAAM BUILDERS AND DEVELOPERS

RG-KA-44510 · RERA PRM/KA/RERA/1257/334/PR/110422/004830 · Last updated on RERA Karnataka portal: 19 Mar 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 112 documents Report an error

MANDARA EXCELLENCY is a Residential/Group Housing project by M S PRANAAM BUILDERS AND DEVELOPERS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/110422/004830 on 11 Apr 2022. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameMANDARA EXCELLENCY
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
    • 575004
  • Pincode575004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/110422/004830
  • ReraGenie IDRG-KA-44510

Builder

  • NameM S PRANAAM BUILDERS AND DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29AAZFP7690J1ZZ
  • Authorized SignatoryKRISHNARAJ SALIAN

Key dates

this monthRegisteredApr 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Apr 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed112 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANDARA EXCELLENCY---48048

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 19 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,519 sq m
Named landowners4
LandownerVillageDistrict
IRENE NORONHA AND OTHERS--
ARTHURNELSON NORONHA AND OTHERS--
IGNATIUS ORWIN NORONHA AND OTHERS--
STEVEN MELVYN NORONHA AND OTHERS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 16.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 16.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS.RATHANRAJ ADHIKARI
EngineerH ANAND BHAT
Chartered AccountantKESHAVA NARSHA BALLAKURAYA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed112

As listed on the registration, under the names the promoter filed them with; the newest 80 of 112 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/110422/004830 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
sanctioned single layoutFile: Single Site.pdf19 Mar 2022
original ground floor planFile: Ground Floor Plan Colour Scan_compressed.pdf19 Mar 2022
original typical floor planFile: Typical Floor Plan Colour Scan_compressed.pdf19 Mar 2022
original terrace elevation site planFile: Terrace section elevation and site Plan Colour Scan_compressed.pdf19 Mar 2022
keyplan highlighted in sanction planFile: site location highliht in key plan.jpg19 Mar 2022
Original legible Relinquishment DeedFile: Relinquishment Deed 95 cents.pdf19 Mar 2022
pollution NOC self attestedFile: pollution noc.pdf19 Mar 2022
CFE PAYMENT RECEIPTFile: CFE payment receipt.pdf19 Mar 2022
ZONAL CERTIFICATE FOR CHANGE OF LAND USEFile: Zonal certficate-chnage of land use.pdf19 Mar 2022
EXTRACT OF MASTER PLANFile: extract of master plan.jpeg19 Mar 2022
LOCATION OF SITEFile: site location.jpeg19 Mar 2022
sanction plan mergedFile: orginal sanction plan.pdf19 Mar 2022
clarificationFile: clarification on notice.pdf19 Mar 2022
RTC, survey 18/3A1D(P)-
Mutation, survey 18/3A1D(P)-
Encumbrance Certificate, survey 18/3A1D(P)-
Conversion/Alienation Order, survey 18/3A1D(P)-
JDA, survey 18/3A1D(P)-
Khatha, survey 18/3A1D(P)-
RTC, survey 18/3A1D(P)-
Mutation, survey 18/3A1D(P)-
Encumbrance Certificate, survey 18/3A1D(P)-
Conversion/Alienation Order, survey 18/3A1D(P)-
JDA, survey 18/3A1D(P)-
Khatha, survey 18/3A1D(P)-
RTC, survey 18/3A1D(P)-
Mutation, survey 18/3A1D(P)-
Encumbrance Certificate, survey 18/3A1D(P)-
Conversion/Alienation Order, survey 18/3A1D(P)-
JDA, survey 18/3A1D(P)-
Khatha, survey 18/3A1D(P)-
RTC, survey 18/3A1D(P)-
Mutation, survey 18/3A1D(P)-
Encumbrance Certificate, survey 18/3A1D(P)-
Conversion/Alienation Order, survey 18/3A1D(P)-
JDA, survey 18/3A1D(P)-
Khatha, survey 18/3A1D(P)-
Registration CertificateFile: firm registartion certficate_compressed.pdf-
Partnership DeedFile: Partnership Deed_compressed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: CA Certificate compressed.pdf-
Certificate issued by Architect Form 2File: Architect's Certificate.pdf-
Certificate issued by Engineer Form 3File: Engineer's Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit for Non Litigation on Land.pdf-
Certificate from Chartered AccountFile: Cost of Approval by CA.pdf-
Balance Sheet 2020 - 2021File: BS 2021-21.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L 2020-21.pdf-
Cash Flow Statement 2020 - 2021File: income statment 2020-21.pdf-
Auditor's Report 2020 - 2021File: AR 2020-21.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2021-22.pdf-
Mandara License Copy_compressed-
SANCTION PLAN-
Revised Single Site - Irene Noronha-
SANCTION PLAN-
SANCTION PLAN-
Revised Single Site - Irene Noronha-
Project Specification-
Revised Single Site - Irene Noronha-
SANCTION PLAN-
STABILITY CERTFICATE-
titel deed of land owner as per jda-
Conversion order merge_compressed-
Conversion order merge_compressed-
title deed of james noronha-
proforma AOS-
proforma allotment-
Brochure-
form b_compressed-
Affidavit 3(1)-
Affidavit cum Declaration with Land Owners-
MESCOM NOC-
Water NOC MCC-
Unnamed document-
Unnamed document-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep MANDARA EXCELLENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmMANDARA EXCELLENCYOther 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: M S PRANAAM BUILDERS AND DEVELOPERS

M S PRANAAM BUILDERS AND DEVELOPERS has 1 registration on RERA Karnataka, including MANDARA EXCELLENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if MANDARA EXCELLENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MANDARA EXCELLENCY?

The registered promoter entity is M S PRANAAM BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AAZFP7690J1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MANDARA EXCELLENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MANDARA EXCELLENCY?

The professionals named in the filing: Architect: S.RATHANRAJ ADHIKARI; Engineer: H ANAND BHAT; Chartered Accountant: KESHAVA NARSHA BALLAKURAYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANDARA EXCELLENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANDARA EXCELLENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANDARA EXCELLENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.