ATHARVA HEIGHTS
By SARLA BUILDERS AND DEVELOPERS
RG-MH-94076 · RERA P52700048673 · Last updated on MahaRERA portal: 15 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 27 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ATHARVA HEIGHTS is a Residential / Group Housing project by SARLA BUILDERS AND DEVELOPERS in Satara, Maharashtra, registered with MahaRERA as P52700048673 on 12 Jan 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 27 months from the original filing. 9 of the 30 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameATHARVA HEIGHTS
- TypeResidential / Group Housing
- Location
- Tamjainagar
- near Podar International School
- Karanje Tarf Satara (CT)
- Satara
- 415002
- Pincode415002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700048673
- ReraGenie IDRG-MH-94076
Builder
- NameSARLA BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersCHARUSHILA ANIL JADHAV, SAROJ SUDHAKAR NANGNURE, CHARUSHILA ANIL JADHAV, SAROJ SUDHAKAR NANGNURE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Jan 2023
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed83 files
Current status
Figures as on 15 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ATHARVA HEIGHTS | NA | 6 | 5 | 30 | 0 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
ATHARVA HEIGHTS: 88% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 15 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SARLA BUILDERS AND DEVELOPERS | Karanje Tarf Satara (CT) | Satara |
| SARLA BUILDERS & DEVELOPERS | Karanje Tarf Satara (CT) | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ATHARVA HEIGHTS | NA | Rs 2.92 cr | Rs 2.59 cr |
| - | NA | Rs 8.76 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASHAY JADHAV Anil Jadhav |
| Engineer | AKSHAY NANGNURE NANGNURE |
| Chartered Accountant | JIVAN JAGTAP |
| Chartered Accountant | HARSHVARDHAN JAIDEEP JADHAV |
| Chartered Accountant | GANESH KHATAVKAR |
| Chartered Accountant | MAYURESH BAGAL |
| Partner | Role in project |
|---|---|
| SARLA BUILDERS AND DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur project has faced significant delays due to unforeseen circumstances. One of our partner has been unable to oversee the project due to a sudden medical emergency. The said partner was recently diagnosed with cancer, requiring immediate attention and care, which has temporarily limited their involvement in key decision-making and execution causing slowdown. Additionally, a critical shortage of skilled labor from our contractors has further impeded progress. Despite proactive efforts to coordinate with alternative teams and suppliers, this labor unavailability has caused unavoidable delays i
Reason as filed by the promoterAs we have started our project after COVID 19 so we are receiving less response from market and customer as we have sold only 7 flats out of 30 flats till date. Besides, one of our partner was suffering from cancer. Thus, in view of reasons mentioned above, our project progress was slow. Now our project has taken a speed & nearly 60-70% is completed and we require some time for finishing work and completing office administrative procedure of obtaining occupancy certificate, society formation & conveyance deed etc. It is therefore requested to please give extension for project completion. Howev
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 3-8-26.pdf | 15 Aug 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 6-26.pdf | 15 Aug 2026 |
| Withdrawal Update Form 3File: Atharva Rera CA 2026-27.pdf | 15 Aug 2026 |
| Withdrawal Update Form 1File: Atharva Architect Certificate Q4 2025 26043.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 12 May 2026 |
| Withdrawal Update Form 3File: Atharva CA CerT Q4 25-26.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: Atharva Form 1 26 Jan 2026.pdf | 3 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (3).pdf | 3 Mar 2026 |
| Withdrawal Update Form 3File: Atharva Form 3 28 Jan 2026.pdf | 3 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf | 6 Jan 2026 |
| Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 1 Jan 2026 |
| Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 1 Jan 2026 |
| Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 31 Dec 2025 |
| Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf | 31 Dec 2025 |
| Form 1File: Form - 2 Engineer's Certificate till 31-12-2024.pdf | 6 Dec 2025 |
| Form 2File: Form - 2 Engineer's Certificate till 31-12-2024.pdf | 6 Dec 2025 |
| Form 3File: ca 31 -12 24.pdf | 6 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold inventory as on 1-1-25.pdf | 6 Dec 2025 |
| Form 1File: FORM -1 Architect's Certificate till 31-03-2025.pdf | 6 Dec 2025 |
| Form 2File: Form - 2 Engineer's Certificate till 31-03-2025.pdf | 6 Dec 2025 |
| Form 3File: ca 31- 3 - 25.pdf | 6 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold inventory as on 1-4-25.pdf | 6 Dec 2025 |
| Form 1File: FORM -1 Architect's Certificate till 30-06-2025.pdf | 6 Dec 2025 |
| Form 2File: Form - 2 Engineer's Certificate till 30-06-2025.pdf | 6 Dec 2025 |
| Form 3File: ca 30 -6-25.pdf | 6 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold inventory as on 1-7-25.pdf | 6 Dec 2025 |
| Form 1File: FORM -1 Architect's Certificate till 30-9-2025.pdf | 6 Dec 2025 |
| Form 2File: Form - 2 Engineer's Certificate till 30-9-2025.pdf | 6 Dec 2025 |
| Form 3File: ca 30 -9-25.pdf | 6 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold inventory as on 1-10-25.pdf | 6 Dec 2025 |
| Form 5 (FY 2024-2025)File: RERA FORM 5 24-25.pdf | 1 Oct 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD INVENTORY.pdf | 7 Jan 2025 |
| Other - TechnicalFile: DISCLOSURE OF SOLD-UNSOLD INVENTORY.pdf | 27 Dec 2024 |
| Other - TechnicalFile: WORK COMPLETION SCHEDULE CHART.pdf | 27 Dec 2024 |
| Declaration in FORM BFile: Atharva Heights form B Dec 2024 for Extension.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atharva heights_Architect_certificate Q1 2023-24.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atharva heights_Architect_certificate Q2 2023-24.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atharva heights_Architect_certificate Q3 2023-24.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atharva heights_Architect_certificate Q4 2023-24.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atharva heights_Architect_certificate Q1 2024-25.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atharva heights_Architect_certificate Q2 2024-25.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2023-24 Atharva Heights form 3.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 2023-24 Atharva Heights form 3.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 2023-24 Atharva Heights form 3.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 2023-24 Atharva Heights Form 2.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 2024-25 Atharva Heights form 3.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 2024-25 Atharva Heights form 3.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 2023-24 Atharva Heights form 3.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 2024-25 Atharva Heights Form 2.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 2024-25 Atharva Heights Form 2.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 2023-24 Atharva Heights Form 2.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 2023-24 Atharva Heights Form 2.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 2023-24 Atharva Heights Form 2.pdf | 18 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf | 18 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf | 18 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Atharva Heights 2023-24.pdf | 18 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SARLA BUILDERS FORM 5.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atharva heights_Architect_certificate Q4 2022-23.pdf | 18 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Atharva Heights Form 2 - Engineer's Certificate Q4 2022-23.pdf | 18 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Q4 FY 22-23 SARLA_compressed.pdf | 18 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Q4 FY 22-23 SARLA-compressed.pdf | 18 May 2023 |
| Copy of the legal title reportFile: Legal Search Dec 2022.pdf | 26 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: combine Declaration Finance and legal encumbrances.pdf | 22 Nov 2022 |
| Details of encumbrances concerned to LegalFile: combine Declaration Finance and legal encumbrances.pdf | 22 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate Atharva heights 19-11-22.pdf | 19 Nov 2022 |
| Building plan approvalFile: Atharva Heights Sanctioned plan scan_compressed (1).pdf | 15 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: combine Declaration Finance and legal encumbrances.pdf | 15 Nov 2022 |
| Details of encumbrances concerned to LegalFile: combine Declaration Finance and legal encumbrances.pdf | 15 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Atharva Heights Sanctioned plan scan_compressed (1).pdf | 15 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Atharva Heights -Building Permission order Satara MCL_compressed.pdf | 15 Nov 2022 |
| Declaration about Commencement CertificateFile: Declaration commencement.pdf | 15 Nov 2022 |
| Declaration in FORM BFile: Form B Declaration cum affidevit.pdf | 15 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf | 15 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf | 15 Nov 2022 |
| CERSAI detailsFile: Security interest declaration 17-11-2022.pdf | 15 Nov 2022 |
| Proforma of Allotment letterFile: Atharva heights allotment.pdf | 15 Nov 2022 |
| Proforma of Agreement for saleFile: Atharva heights Agreement.pdf | 15 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate bank account declaration 17-11-22.pdf | 15 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Atharva heights allotment Deviation (3).pdf | 15 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: Atharva heights Agreement Deviation.pdf | 15 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ATHARVA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near near Podar International School1,100+ in Satara
Filed coordinates, straight-line distance. 72 registered projects within 2 km.
Sukhodayam Villas
M/s Ultra Urban Greene Realty LLP
YASHWANT ELITE
RAHULDEV PROMOTERS SATARA
KRISHNAKUNJ VIHAR PHASE-3
Pooja Shridhar Kangralkar
SHATAKSHI TOWER
VISHAL DILIP PAWAR
SHREE VIHAR
M/s SHREE SAIDARSHAN DEVELOPERS
SHIVSAMARTH RESIDENCY
MS BHOSALE AND NALAWADE
See every Satara project, with the district possession charts
Builder: SARLA BUILDERS AND DEVELOPERS
SARLA BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including ATHARVA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if ATHARVA HEIGHTS is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ATHARVA HEIGHTS?
The registered promoter entity is SARLA BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ATHARVA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ATHARVA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ATHARVA HEIGHTS?
The professionals named in the filing: Architect: ASHAY JADHAV Anil Jadhav; Engineer: AKSHAY NANGNURE NANGNURE; Chartered Accountant: JIVAN JAGTAP; Chartered Accountant: HARSHVARDHAN JAIDEEP JADHAV; Chartered Accountant: GANESH KHATAVKAR; Chartered Accountant: MAYURESH BAGAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ATHARVA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback