ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / ASHTAVINAYAK APARTMENTS

Registration lapsed No litigation declared Others project

ASHTAVINAYAK APARTMENTS

By SHIV SHRUTI DEVELOPERS LLP

RG-MH-39945 · RERA P51800049920 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken
  • Rs 30.00 crore secured on the land, in favour of STATE BANK OF INDIA

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
15 of 173Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

ASHTAVINAYAK APARTMENTS is a Others project by SHIV SHRUTI DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049920 on 6 Mar 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 158 of the 173 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameASHTAVINAYAK APARTMENTS
  • TypeOthers
  • Location
    • JOGESHWARI EAST
    • ANDHERI EAST
    • Majas
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049920
  • ReraGenie IDRG-MH-39945

Builder

  • NameSHIV SHRUTI DEVELOPERS LLP
  • Entity typePartnership
  • PartnersNIRAJ MAHESH DOSHI, CHIRAG ASHOK SHAH, KARAN MAHESH DOSHI, HETANSHU CHIRAG SHAH
  • Declared earlier projects1 →

Key dates

4 months past promisethis monthRegisteredMar 2023First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Mar 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed83 files

Current status

91%158 of 173 units booked
63.2%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PTC A WING - SALENA240000
WING B - SALE BUILDINGNA24231730173

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

PTC A WING - SALE78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
WING B - SALE BUILDING78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterYes25%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Closed/Covered66

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,218 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofSTATE BANK OF INDIA
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on16 Oct 2025
LandownerVillageDistrict
M/S AISHWARYA LIGHT CONSTRUCTION COMPANYAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI18877.6
Proposed, not sanctioned11,987 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCORPORATE PARK NO 11, PLOT NO 8, UNIT NO 11, SION TROMBAY ROAD, MUMBAI - 400071
Estimated costRs 120.00 cr
Cost incurredRs 75.84 cr
Work done63.2%
BuildingWingEstimatedIncurred
PTC A WING - SALENARs 57.50 crRs 37.92 cr
WING B - SALE BUILDINGNARs 57.50 crRs 37.92 cr
-NARs 5.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJIYANI CONSULTANCY LLP
EngineerDHAVAL H SHAH
Chartered AccountantY R GOSWAMI & CO
Chartered AccountantRAJAN MENDA
Chartered AccountantJ.J.SANGANEE & COMPANY
PartnerRole in project
SHIV SHRUTI DEVELOPERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16102518140Dec 2025 → Jun 2026

Reason as filed by the promoterDUE TO SHORTAGE OF LABOUR THE PROJECT WAS NOT ABLE TO GET COMPLETED IN TIME

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - 31-03-2026.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2 - 31-03-2026.pdf15 May 2026
Withdrawal Update Form 3File: form 3 31-03-2026.pdf15 May 2026
Withdrawal Update Form 1File: FORM -1 31-03-2026.pdf5 May 2026
Withdrawal Update Form 2File: form 2 31-03-2026.pdf5 May 2026
Withdrawal Update Form 3File: form 3 31-03-2026.pdf5 May 2026
Withdrawal Update Form 1File: FORM 1 - 31-12-2025.pdf2 Apr 2026
Withdrawal Update Form 2File: FORM 2 - 31-12-2025.pdf2 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf2 Apr 2026
Form 2A (FY 2022-2023)File: FY - 2022-23.pdf12 Dec 2025
Form 2A (FY 2023-2024)File: FY - 2023-24.pdf12 Dec 2025
Form 2A (FY 2024-2025)File: FY - 2024-25.pdf12 Dec 2025
Form 5 (FY 2023-2024)File: FY - 2023-24.pdf12 Dec 2025
Form 5 (FY 2022-2023)File: FORM 5 2022-23.pdf8 Dec 2025
Form 5 (FY 2024-2025)File: FY - 2024-25.pdf4 Dec 2025
Withdrawal Update Form 1File: FORM 1 - 30-09-2025.pdf20 Nov 2025
Withdrawal Update Form 2File: FORM 2 30-09-2025.pdf20 Nov 2025
Withdrawal Update Form 3File: FORM 3 - 30-09-2025.pdf20 Nov 2025
Withdrawal Update Form 1File: FORM 1 - 30-09-2025.pdf29 Oct 2025
Withdrawal Update Form 1File: FORM 1 - 30-09-2025.pdf29 Oct 2025
Withdrawal Update Form 2File: FORM 2 30-09-2025.pdf29 Oct 2025
Withdrawal Update Form 2File: FORM 2 30-09-2025.pdf29 Oct 2025
Withdrawal Update Form 3File: FORM 3 - 30-09-2025.pdf29 Oct 2025
Withdrawal Update Form 3File: FORM 3 - 30-09-2025.pdf29 Oct 2025
Form 1File: FORM 1 30-06-2025.pdf19 Jul 2025
Form 2File: FORM 2 30-06-2025.pdf19 Jul 2025
Form 3File: FORM 3 30-06-2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY 30-06-2025.pdf19 Jul 2025
Declaration about Commencement CertificateFile: DECLARATION OF CC SHIV SHRUTI SIGN.pdf16 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf10 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD INVENTORY.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE SHIV SHRUTI DEVELOPERS LLP.pdf17 Jul 2024
Details of encumbrances concerned to FinanceFile: SHIV SHRUTI LEGAL.pdf25 Oct 2023
Details of encumbrances concerned to LegalFile: SHIV SHRUTI LEGAL.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: ashtavinayak 1.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: ashtavinayak 2.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: ashtavinayak 3.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASHTVINAYAK APARTMENT Rera - Form - 3 - (1)_compressed.pdf6 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSD LLP - Form 3 - Ashtavinayak-Sign with stamp (1) (1).pdf28 Jun 2023
Copy of the legal title reportFile: Ashtavinayak TItle Reprt.pdf28 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf28 Feb 2023
Proforma of Agreement for saleFile: Ashtavinayak -Proforma Agreement for RERA Registration.pdf28 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-2.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-3.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-4.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-5.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-6.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-7.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-8.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-9.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-10.pdf21 Feb 2023
Building plan approvalFile: 1Amended IOA Sale Plan-11.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-2.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-3.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-4.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-5.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-6.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-7.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-8.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-9.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-10.pdf21 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1Amended IOA Sale Plan-11.pdf21 Feb 2023
Declaration about Commencement CertificateFile: ASHTVINAYAK-DECLARATION ABOUT COMMENCEMENT CERTIFICATE-FORM-D.pdf21 Feb 2023
Layout approvalFile: Layout HIGHLIGHT 01.pdf20 Feb 2023
Copy of Layout Approval (in case of layout)File: Layout HIGHLIGHT 01.pdf20 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SSANEXURE.pdf11 Feb 2023
Building plan approvalFile: IOA Letter.pdf10 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: IOA Letter.pdf10 Feb 2023
Deviation Report with respect to Allotment letterFile: ASHTVINAYAK-AL.pdf6 Feb 2023
Deviation Report with respect to model copy of AgreementFile: ASHTVINAYAK - AFS.pdf6 Feb 2023
Proforma of Allotment letterFile: AA.pdf4 Feb 2023
PAN CardFile: 1 PAN Card.pdf1 Feb 2023
Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal (2).pdf1 Feb 2023
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal (2).pdf1 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Sale Bldg 2.pdf1 Feb 2023
Declaration in FORM BFile: 1 Declaration in FORM B.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf1 Feb 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationRegisteredStatusPromisedDelivered
NEW INDIA HEIGHTSP51800029165ANDHER EAST NEAR RAILWAY STATION, Mumbai SuburbanMay 2021OngoingDec 2023Not delivered

How this compares with Mumbai Suburban

91%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASHTAVINAYAK APARTMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI EAST6,700+ in Mumbai Suburban

2 kmASHTAVINAYAK APARTMENTSCompleted 65Lapsed / revoked 26Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 158 registered projects within 2 km.

Builder: SHIV SHRUTI DEVELOPERS LLP

SHIV SHRUTI DEVELOPERS LLP has 1 registration on MahaRERA, including ASHTAVINAYAK APARTMENTS. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that ASHTAVINAYAK APARTMENTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ASHTAVINAYAK APARTMENTS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHTAVINAYAK APARTMENTS?

The registered promoter entity is SHIV SHRUTI DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHTAVINAYAK APARTMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHTAVINAYAK APARTMENTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHTAVINAYAK APARTMENTS?

The professionals named in the filing: Architect: JIYANI CONSULTANCY LLP; Engineer: DHAVAL H SHAH; Chartered Accountant: Y R GOSWAMI & CO; Chartered Accountant: RAJAN MENDA; Chartered Accountant: J.J.SANGANEE & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHTAVINAYAK APARTMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHTAVINAYAK APARTMENTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHTAVINAYAK APARTMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.