Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 39 complaints at MahaRERA
  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 11Construction stages donefurthest along: Installation of Lifts, 90%
32 of 222Units unsoldnot recorded sold or booked
39Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

ASHOKA HEIGHTS is a Residential / Group Housing project by Om Builders and Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003394 on 5 Aug 2017. Possession was promised by 29 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing. 190 of the 222 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 39 complaints are on record with the regulator.

At a glance

Project

  • NameASHOKA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • NAHUR VILLAGE ROAD
    • MULUND WEST
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003394
  • ReraGenie IDRG-MH-26960

Builder

  • NameOm Builders and Developers
  • Entity typePartnership
  • PartnersSachin Ashok Yadav, Ashok Tukaram Yadav
  • Other registrations8 more →
  • Completed3 of 9
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Aug 2017
  • Promised completion29 Dec 2025
  • Revised completionRevised to 29 Dec 2025 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed87 files

Current status

86%190 of 222 units booked

Figures as on 6 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A and B WINGNA25232184222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

A and B WING: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 6 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed96

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots96
Closed/Covered90
Open Space6

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,118 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 May 2025

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI9290.23
Proposed, not sanctioned9,290 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNAV BHAGHAYSHREE GROUND FLOOR OPP C D DESHMUKH GARDEN MAHATMA PHULE ROAD MULUND EAST MUMBAI 400081

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHREE ASSOCIATES
EngineerVinayak Chopdekar & Associates
Chartered AccountantCA Esha Bhanushali
PartnerRole in project
Om Builders and Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012945Dec 2022 → Dec 2023

Reason as filed by the promoterShortage of material, Covid-19 situation, Labour shortage

EXT51800018921Dec 2022 → Dec 2024

Reason as filed by the promoterApplied for OC. Project is Almost 95% Complete

EXT51800025837Dec 2022 → Dec 2025

Reason as filed by the promoterThere is a delay in the completion of the project Ashoka Heights., which has MahaRERA registration No P51800003394. The following factors have contributed to this delay: 1. We procured financing from Kotak Mahindra Bank Ltd by pledging unsold units in the project. Due to non-payment of consecutive instalments, our flats were highlighted in an auction, putting us under financial burden. 2. Payments that we were supposed to receive according to the construction-linked payment plan were halted by banks following instructions from buyers due to the auction news. 3. Our main contractor was unable t

Complaints filed with MahaRERA39

Case no.ComplainantRespondentFiled
CC006000000000119Anthony Ashwin PeterOm Builders and Developers16/08/2017
CC006000000000207Dipak Annapa PatilOm builders and developers06/09/2017
CC006000000000974Ankit Pankaj PanchalMilind Ashok Yadav29/09/2017
CC006000000057093Kundip Sunderji ThakkerOm Builders And Developers30/11/2018
CC006000000057891SUNIL VISHNU KUBALOM Builders and Developers31/01/2019
CC006000000195789SUDRIK ARVIND PUNDLIKOM BUILDERS AND DEVELOPERS29/01/2021
CC006000000197594Durgasankar B SahuOm Builders and Developers14/07/2021
CC006000000210118Prasad PadalkarMilind Yadav21/02/2022
CC006000000209857ELUMALAI MUNIYAPPAN PILLAIOM BUILDER AND DEVELOPER28/01/2022
CC006000000375399PRITISH SATISH LOKHANDEM/S.OM BUILDERS AND DEVELOPERS26/04/2023
CC006000000375403PURTI ASHOK SHENVIM/S OM BUILDERS AND DEVELOPERS26/04/2023
CC006000000375408RAVINDRA MOHAN KOCHREKAROM BUILDER AND DEVELOPER26/04/2023
CC006000000480079VINAYAK VISHNU TAKALKARMilind Ashok Yadav14/04/2024
CC12500827Shilpa Sachin GadekarOm Builders and Developers10/03/2025
CC12500828Tilottama Shrikant PimpalkhareOm Builders and Developers10/03/2025
CC12500825Maria Romeo FernandesOm Builders and Developers10/03/2025
CC12500829Yeshwant Ravindra SarmalkarOm Builders and Developers10/03/2025
CC12500826Chandrakant Rajaram DeshmukhOm Builders and Developers10/03/2025
CC12500819Vikramkumar Dayalal PanchalOm Builders and Developers10/03/2025
CC12500823Jitendra Lingraj PandaOm Builders and Developers10/03/2025
CC12500830Preksha Janardhan SalianOm Builders and Developers10/03/2025
CC12500836Jayendra Shrikant TavsalkarOm Builders and Developers11/03/2025
CC12500844Sachin Shioshankar GajbhiyeOm Builders and Developers11/03/2025
CC12500857Nilesh Arjun BhujbalOm Builders and Developers12/03/2025
CC12500865Aarti Harshad LavateOm Builders and Developers12/03/2025
CC12500866Manasi Nilesh ParabOm Builders and Developers12/03/2025
CC12500891Chandra Sekhar ChadalavadaOm Builders and Developers13/03/2025
CC12500885Akash Amrutrao DesaiOm Builders and Developers13/03/2025
CC12500896Jignesh Shivji KariyaOm Builders and Developers15/03/2025
CC12500900Anil Purushothama SanilOm Builders and Developers15/03/2025
CC12500905Prafull Manhoar DangoreOm Builders and Developers15/03/2025
CC12500909Priyatosh Sadhan SinhaOm Builders and Developers15/03/2025
CC12500913Rushikesh Madhukar DaradeOm Builders and Developers16/03/2025
CC12500915Deepak Laxman BidayeOm Builders and Developers16/03/2025
CC12500918Tanmay Maruti TalekarOm Builders and Developers16/03/2025
CC12501048Sujeet Mahadev GuptaOm Builders and Developers28/03/2025
CC12501092Prashant Rajesh KotwalOm Builders and Developers01/04/2025
CC12501094Prashant Rajesh KotwalOm Builders and Developers01/04/2025
CC12501295Ramesh Ramkishan YadavOm Builders and Developers19/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architech certificate-Ashoka Height-31-12-2023.pdf6 Jan 2026
Withdrawal Update Form 1File: Architech certificate-Ashoka Height-31-12-2023.pdf6 Jan 2026
Withdrawal Update Form 1File: Architech certificate-Ashoka Height-31-12-2023.pdf6 Jan 2026
Withdrawal Update Form 1File: Architech certificate-Ashoka Height-31-12-2023.pdf6 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate-Ashoka Heights -31-12-2023.pdf6 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate-Ashoka Heights -31-12-2023.pdf6 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate-Ashoka Heights -31-12-2023.pdf6 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate-Ashoka Heights -31-12-2023.pdf6 Jan 2026
Withdrawal Update Form 3File: ashoka old form 3.pdf6 Jan 2026
Withdrawal Update Form 3File: ashoka old form 3.pdf6 Jan 2026
Withdrawal Update Form 3File: ashoka old form 3.pdf6 Jan 2026
Withdrawal Update Form 3File: ashoka old form 3.pdf6 Jan 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: A Form- 2A.pdf4 Jan 2025
Declaration in FORM BFile: Declaration Form B- Builder docx.pdf27 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 31032024.pdf27 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 30062024.pdf27 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 30092024.pdf27 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31032024.pdf27 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30062024.pdf27 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30092024.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory final.pdf27 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed.pdf27 Dec 2024
Declaration in FORM BFile: Form B Dec 30 Dec 2024.pdf20 Apr 2024
Details of encumbrances concerned to FinanceFile: Non encumbrance.pdf13 Feb 2024
Details of encumbrances concerned to LegalFile: Non encumbrance.pdf13 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Sale.pdf13 Feb 2024
Declaration in FORM BFile: Affidavit Cum Declaration Askoka Heights.pdf13 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech certificate-Ashoka Height-31-12-2023.pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-Ashoka Heights -31-12-2023.pdf13 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2223.pdf13 Feb 2024
CERSAI detailsFile: Cersai List-Loan-Ashoka Heights.pdf13 Feb 2024
Certificates of CA (Form 3)File: FORM 3 Ashoka.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Dis int ashoka.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2223 Ashoka Heights.pdf13 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A -Declaration about Bank account-Ashoka Heights.pdf13 Feb 2024
Declaration about Commencement CertificateFile: CC Ashoka Heigts.pdf15 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Enginner Certifiacte 20 (Mulund).pdf15 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate 21 ( Mulund ).pdf15 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate 22 (Mulund).pdf15 Dec 2022
Disclosure of sold/ booked inventoryFile: Ashoka Heights,Sold Flat.pdf15 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FY18-19 (1).pdf15 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 19-20.pdf15 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 20-21.pdf15 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FY 21-22.pdf15 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate23.pdf24 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 18 and Elec 1.pdf24 Dec 2021
OtherFile: Ashoka Heights -Agreement Draft Sale.pdf28 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: rehab cc.pdf4 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: rehab cc1.pdf4 Apr 2021
OtherFile: CERTIFICATE OF ENCUMBRANCE.pdf24 May 2020
OtherFile: CERTIFICATE OF ENCUMBRANCE.pdf24 May 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arct 1.pdf9 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arct 1.pdf9 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arct 1.pdf9 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arct2.pdf9 Jul 2019
Certificates of CA (Form 5)File: ca certifcate 1.pdf9 Jul 2019
Certificates of CA (Form 5)File: ca certicate2.pdf9 Jul 2019
OtherFile: kundip sunderji takker case withdrawal.pdf24 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: further cc.pdf28 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: further cc.pdf28 Mar 2019
Building plan approvalFile: ioa1.pdf31 Jul 2017
Building plan approvalFile: ioa4-min.pdf31 Jul 2017
Building plan approvalFile: ioa2-min.pdf31 Jul 2017
Building plan approvalFile: ioa3-min.pdf31 Jul 2017
Building plan approvalFile: 1-4-2-.pdf31 Jul 2017
Building plan approvalFile: 1-7-2-.pdf31 Jul 2017
Layout approvalFile: Scan copy of acknowledgement.pdf31 Jul 2017
Copy of the legal title reportFile: title certificate-min.pdf31 Jul 2017
Details of encumbrancesFile: Scan copy of acknowledgement of encumbrances.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Scan copy of acknowledgement.pdf31 Jul 2017
Building Plan Approval (IOD)File: ioa1.pdf31 Jul 2017
Building Plan Approval (IOD)File: ioa2-min.pdf31 Jul 2017
Building Plan Approval (IOD)File: ioa3-min.pdf31 Jul 2017
Building Plan Approval (IOD)File: ioa4-min.pdf31 Jul 2017
Building Plan Approval (IOD)File: 1-4-2-.pdf31 Jul 2017
Building Plan Approval (IOD)File: 1-7-2-.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: cc-min.pdf31 Jul 2017
Declaration in FORM BFile: form b Declaration.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scanned 0.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: scannned 1.pdf31 Jul 2017

How this compares with Mumbai Suburban

86%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASHOKA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmASHOKA HEIGHTSCompleted 121Lapsed / revoked 96Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 373 registered projects within 2 km.

Builder: Om Builders and Developers

OM BUILDERS AND DEVELOPERS has 9 registrations on MahaRERA, including Om Heights and ASHOKA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that ASHOKA HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ASHOKA HEIGHTS is delayed beyond 29 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHOKA HEIGHTS?

The registered promoter entity is Om Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHOKA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ASHOKA HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ASHOKA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHOKA HEIGHTS?

The professionals named in the filing: Architect: SHREE ASSOCIATES; Engineer: Vinayak Chopdekar & Associates; Chartered Accountant: CA Esha Bhanushali. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHOKA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHOKA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHOKA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.