ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / Ashiyana Luxuria II

Registered No litigation declared Residential / Group Housing project

Ashiyana Luxuria II

By Brijwasi Megaproperties LLP

RG-MH-91848 · RERA PR1220002500923 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 7.00 crore secured on the land, in favour of STATE BANK OF INDIA
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
6 of 18Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
68 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 16 documents Report an error

Ashiyana Luxuria II is a Residential / Group Housing project by Brijwasi Megaproperties LLP in Nashik, Maharashtra, registered with MahaRERA as PR1220002500923 on 24 Sep 2025. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 2 of the 70 units on this registration are recorded sold or booked, and 6 of 18 construction stages are filed complete.

At a glance

Project

  • NameAshiyana Luxuria II
  • TypeResidential / Group Housing
  • Location
    • Khode Nagar
    • Ashoka Marg
    • Nashik (M Corp.)
    • Nashik
    • 422011
  • Pincode422011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1220002500923
  • ReraGenie IDRG-MH-91848

Builder

  • NameBrijwasi Megaproperties LLP
  • Entity typeLimited Liability Partnership
  • LLPINABZ-8863
  • GSTIN27ABAFB6334M1ZB
  • Designated PartnersAmisha Sandeep Gupta, Nilesh Khushiram Vaish, Sandeep Gulabchand Gupta, Tushar Sandeep Gupta
  • PartnerGulabchand Gupta

Key dates

this monthRegisteredSep 2025First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Sep 2025
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings2 building records
  • Documents filed16 files

Current status

3%2 of 70 units booked
18.8%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A and Building BBuilding A8742042
Building A and Building BBuilding B8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

Building A and Building B · wing Building A36%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building A and Building B · wing Building B47%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises38%
Sanitary Fittings within the flats / premises12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNo0%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Open Space23
Stilt / Ground47
BuildingOpen SpaceStilt / GroundTotal
Building A and Building B Building A122234
Building A and Building B Building B112536

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,015 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSTATE BANK OF INDIA
Secured amountRs 7.00 crore
CERSAI search filedYes
Declared on16 Sep 2026

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI6448.0
Proposed, not sanctioned6,446 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCITY NASIK BRANCH,GAURI SHANKAR TILAK ROAD NASIK CITY,NASIK,422001
Estimated costRs 12.50 cr
Cost incurredRs 2.35 cr
Work done18.78%
BuildingWingEstimatedIncurred
Building A and Building BBuilding ARs 7.00 crRs 1.41 cr
Building A and Building BBuilding BRs 5.20 crRs 93.92 lakh
-NARs 30.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijaya Consultants
EngineerLab Associates
EngineerAdil Sayyed
Chartered AccountantRSPH and Associates
Chartered AccountantP N SABADRA & ASSOCIATES
PartnerRole in project
Brijwasi Megaproperties LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR1220002500923/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed16

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: RERA Audit Report-25-26.pdf13 Aug 2026
Withdrawal Update Form 1File: AR - June 26.pdf18 Jul 2026
Withdrawal Update Form 2File: ER - June 26 .pdf18 Jul 2026
Withdrawal Update Form 3File: CA - June 26 .pdf18 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A March 26- Brijwasi Megaproperties LLP.pdf14 Jul 2026
Withdrawal Update Form 1File: Architect Certificate RERA FY 25-26 Q4 AL 2.pdf20 Apr 2026
Withdrawal Update Form 2File: Brijwasi Megaproperties LLP Engineer Certificate AL 2.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificate- Brijwasi Megaproperties LLP- Q4-fianl.pdf20 Apr 2026
Withdrawal Update Form 1File: Brijwasi Megapropertises LLP AR Certificates.pdf19 Jan 2026
Withdrawal Update Form 2File: Brijwasi Megaproperties LLP Engineer Certificate AL 2.pdf19 Jan 2026
Withdrawal Update Form 3File: Brijwasi Megaproperties LLP- CA Certificate final.pdf19 Jan 2026
Withdrawal Update Form 1File: AR sept 25.pdf18 Oct 2025
Withdrawal Update Form 2File: ER.pdf18 Oct 2025
Withdrawal Update Form 3File: CA Sept 25.pdf18 Oct 2025
Declaration and undertaking (Annexure A)File: One Plot One Reg-Brijwasi Megaproperties LLP.pdf12 Sep 2025
Building plan approvalFile: Brijwasi-Plan.pdf8 Sep 2025

How this compares with Nashik

3%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 4 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ashiyana Luxuria II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ashoka Marg4,100+ in Nashik

2 kmAshiyana Luxuria IICompleted 97Lapsed / revoked 28Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 208 registered projects within 2 km.

Builder: Brijwasi Megaproperties LLP

Brijwasi Megaproperties LLP has 1 registration on MahaRERA, including Ashiyana Luxuria II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Ashiyana Luxuria II is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ashiyana Luxuria II?

The registered promoter entity is Brijwasi Megaproperties LLP, a limited liability partnership as per the filing. Its LLPIN ABZ-8863 and GSTIN 27ABAFB6334M1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ashiyana Luxuria II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ashiyana Luxuria II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ashiyana Luxuria II?

The professionals named in the filing: Architect: Vijaya Consultants; Engineer: Lab Associates; Engineer: Adil Sayyed; Chartered Accountant: RSPH and Associates; Chartered Accountant: P N SABADRA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashiyana Luxuria II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashiyana Luxuria II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashiyana Luxuria II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.