Home / Browse projects / Nashik, Maharashtra / Ashiyana Luxuria

Completed No litigation declared Residential / Group Housing project

Ashiyana Luxuria

By Brijwasi Infratech

RG-MH-94671 · RERA P51600054655 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
33 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Ashiyana Luxuria is a Residential / Group Housing project by Brijwasi Infratech in Nashik, Maharashtra, registered with MahaRERA as P51600054655 on 2 Feb 2024. The registration is recorded completed; possession was promised by 31 Dec 2028. 37 of the 70 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameAshiyana Luxuria
  • TypeResidential / Group Housing
  • Location
    • Khode Nagar
    • Ashoka Marg
    • Nashik (M Corp.)
    • Nashik
    • 422011
  • Pincode422011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600054655
  • ReraGenie IDRG-MH-94671

Builder

  • NameBrijwasi Infratech
  • Entity typePartnership
  • PartnersSandeep Gulab Chand Gupta, Amisha Sandeep Gupta, Tushar Sandeep Gupta

Key dates

this monthRegisteredFeb 2024PromisedDec 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed95 files

Current status

53%37 of 70 units booked
80.3%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ashiyana Luxuria Building ANA9742042
Ashiyana Luxuria Building BNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Ashiyana Luxuria Building A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Ashiyana Luxuria Building B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered61
Open Space9
BuildingClosed/CoveredOpen SpaceTotal
Ashiyana Luxuria Building A33942
Ashiyana Luxuria Building B28028

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,750 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Aug 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI5595.56
Proposed, not sanctioned5,596 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThakkers Nexus Point, Gr Floor, College Road, Near Bhosla Military School, Nashik, Maharashtra 42200
Estimated costRs 10.35 cr
Cost incurredRs 8.32 cr
Work done80.35%
BuildingWingEstimatedIncurred
Ashiyana Luxuria Building ANARs 5.72 crRs 4.46 cr
Ashiyana Luxuria Building BNARs 4.25 crRs 3.61 cr
-NARs 39.20 lakhRs 25.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshok Jamdar
EngineerLekraj Pandit
EngineerRohit Shankar Kedare
Chartered AccountantCA Paresh Sabadra
Chartered AccountantP N Sabadra & Associates
Chartered AccountantRSPH & Associates
PartnerRole in project
Brijwasi Infratech-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A Mar 24.pdf25 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A Mar 25.pdf25 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A Mar 26.pdf25 Apr 2026
Withdrawal Update Form 1File: AR.pdf31 Mar 2026
Withdrawal Update Form 2File: ER.pdf31 Mar 2026
Withdrawal Update Form 3File: CA - March 26-Final.pdf31 Mar 2026
Occupational CertificateFile: OC confirmation mail .pdf30 Mar 2026
Occupational CertificateFile: Completion Certificate.PDF6 Mar 2026
Withdrawal Update Form 1File: Brijwasi Infratech Architect Certificate final.pdf19 Jan 2026
Withdrawal Update Form 2File: Brijwasi Infratech Engineer certificate AL-1.pdf19 Jan 2026
Withdrawal Update Form 3File: CA Certificate Brijwasi Infratech final.pdf19 Jan 2026
Withdrawal Update Form 1File: AR sept 25.pdf16 Oct 2025
Withdrawal Update Form 1File: AR sept 25.pdf16 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate-June-24.pdf16 Oct 2025
Withdrawal Update Form 2File: ER Sept 25.pdf16 Oct 2025
Withdrawal Update Form 3File: CA sept 25 final.pdf16 Oct 2025
Withdrawal Update Form 3File: CA sept 25 final.pdf16 Oct 2025
Form 1File: Architect Certificate-June-24.pdf15 Sep 2025
Form 2File: Engineer Certificate-June-24.pdf15 Sep 2025
Form 3File: CA Certificate- June-2024.pdf15 Sep 2025
Disclosure of Sold and Booked InventoryFile: Brijwasi Infratech June 2024.pdf15 Sep 2025
Form 1File: Architect Certificate-Sept-24.pdf15 Sep 2025
Form 2File: Engineer Certificate-Sept-24.pdf15 Sep 2025
Form 3File: CA Certificate Sept 24.pdf15 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sept 24 Ashiyana Luxuria.pdf15 Sep 2025
Form 1File: Architect Certificate-Dec-24.pdf15 Sep 2025
Form 2File: Engineer Certificate-Dec-24.pdf15 Sep 2025
Form 3File: CA Certificate-Dec-24.pdf15 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Dec -24.pdf15 Sep 2025
Form 1File: Architect Certificate-March-25.pdf15 Sep 2025
Form 2File: Engineer Certificate-March-25.pdf15 Sep 2025
Form 3File: CA Certificate Final-March-25.pdf15 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold March-25.pdf15 Sep 2025
Form 5 (FY 2024-2025)File: Signed RERA audit report - 24 25 final.pdf15 Sep 2025
Form 1File: Architect certificate .pdf19 Jul 2025
Form 2File: Engineer Certificate .pdf19 Jul 2025
Form 3File: CA Certificate.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory .pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-March-25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Final-March-25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-March-25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory RERA FY 24-25 Q4 AL 1.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory RERA FY 24-25 Q4 AL 1.pdf19 Apr 2025
Other - TechnicalFile: Form 2A RERA FY 24-25 Q4 AL 1.pdf19 Apr 2025
Other - TechnicalFile: Form 2A RERA FY 24-25 Q4 AL 1.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Dec-24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Dec-24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Dec-24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Dec-24.pdf20 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS for Payment Schedule.pdf28 Nov 2024
Proforma of Agreement for saleFile: Agreement To Sale for Ashiyana Luxuria RERA Final.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Sept-24.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate RERA For sign.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Sept-24.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure ofsold booking Ashiyana Luxuria.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Brijwasi Infratech RERA Audit Report FY 23-24.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-June-24.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-June-24.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Brijwasi Infratech (2).pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- June-2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Structural Engineer Certificate RERA FY 23-24 Q4 (1).pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Quaterly Inventory Sold AL RERA FY 23-24 Q4.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Brijwasi-CA Certificate_Signed.pdf20 Apr 2024
Other - TechnicalFile: Form 2A RERA FY 23-24 Q4.pdf20 Apr 2024
Layout approvalFile: Plan 1.pdf9 Jan 2024
Layout approvalFile: Plan 2.pdf9 Jan 2024
Layout approvalFile: Plan 3.pdf9 Jan 2024
Building plan approvalFile: Plan 1.pdf9 Jan 2024
Building plan approvalFile: Plan 2.pdf9 Jan 2024
Building plan approvalFile: Plan 3.pdf9 Jan 2024
PAN CardFile: Firm Pan Card.pdf9 Jan 2024
Copy of the legal title reportFile: Title Search Report.pdf9 Jan 2024
Copy of the legal title reportFile: Title Search Report Plot No 9_1 to 9_1A 2023 2.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: Brijwasi_encumbrance to finance.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: Brijwasi_encumbrance to legal.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: Brijwasi_encumbrance to finance.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: Brijwasi_encumbrance to legal.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: Plan 1.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: Plan 2.pdf9 Jan 2024

How this compares with Nashik

53%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ashiyana Luxuria on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ashoka Marg4,100+ in Nashik

2 kmAshiyana LuxuriaCompleted 96Lapsed / revoked 28Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 208 registered projects within 2 km.

Builder: Brijwasi Infratech

Brijwasi Infratech has 1 registration on MahaRERA, including Ashiyana Luxuria. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Ashiyana Luxuria is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ashiyana Luxuria?

The registered promoter entity is Brijwasi Infratech, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ashiyana Luxuria?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ashiyana Luxuria?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ashiyana Luxuria?

The professionals named in the filing: Architect: Ashok Jamdar; Engineer: Lekraj Pandit; Engineer: Rohit Shankar Kedare; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: P N Sabadra & Associates; Chartered Accountant: RSPH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashiyana Luxuria?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashiyana Luxuria. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashiyana Luxuria to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.