ARYAN HILLS
RG-MH-15456 · RERA P51500050782 · Last updated on MahaRERA portal: 28 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 8 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARYAN HILLS is a Residential / Group Housing project by VA DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500050782 on 3 May 2023. Possession was promised by 19 Feb 2026 and is now 8 months past that date. The completion date has moved by 12 months from the original filing. 10 of the 22 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.
At a glance
Project
- NameARYAN HILLS
- TypeResidential / Group Housing
- Location
- TALUKA AND DISTRICT AURANGABAD
- SATARA
- Satara (CT)
- Aurangabad
- 431002
- Pincode431002
- RERA no.P51500050782
- ReraGenie IDRG-MH-15456
Builder
- NameVA DEVELOPERS
- Entity typePartnership
- PartnersVISHAL RAJARAM JADHAV, RAHUL BASWANT NANDGAWALI
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 May 2023
- Promised completion19 Feb 2026
- Revised completionRevised to 19 Feb 2026 (originally 19 Feb 2025)
- Buildings2 building records
- Documents filed51 files
Current status
Figures as on 28 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROW HOUSE A-1 TO A-11 | NA | 2 | 2 | 11 | 0 | 11 |
| ROW HOUSE B-1 TO B-11 | NA | 2 | 2 | 11 | 0 | 11 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 28 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 80%.
ROW HOUSE A-1 TO A-1156%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE B-1 TO B-1182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 70% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed26
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| ROW HOUSE A-1 TO A-11 | 2 | 11 | 13 |
| ROW HOUSE B-1 TO B-11 | 2 | 11 | 13 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| DEEPAK GANGADHAR AHER | Aurangabad (M Corp.) | Aurangabad |
| PRAKASH GANGADHAR AHER | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | J B ASSOCIATES |
| Engineer | AKASH SHELAR |
| Chartered Accountant | KAPVALT & CO |
| Chartered Accountant | KAPVALT & CO. |
| Partner | Role in project |
|---|---|
| VA DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterMr. Vishal R. Jadhav, a promoter who looks after the entire construction activity had met with an accident which resulted into deep cut on his hand and made it unusable for almost 7-8 months. This accident disabled Mr. Vishal R. Jadhav to look after the construction activity at site. However, from last few months, the construction work is going on in full swing and We humbly request you to grant us an extension of 1 year. We sincerely commit to take occupancy certificate by 19.02.2025
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed51
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar 25.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan-Mar 25.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan-Mar 25.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC SEPT 24 - ARYAN HILLS.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Form 3 Aryan Hills Jul-Sep 24.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Form 3 Aryan Hills Oct-Dec 24.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC SEPT 24 - ARYAN HILLS.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 18 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aryan Hills FY 23-24.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC - ARYAN - APRIL 23 - JUNE 23.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC - ARYAN - JULY 23 - SEPT 23.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC - ARYAN - OCT 23 - DEC 23.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC - ARYAN - JAN 24 - MARCH 24.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC - ARYAN - APRIL 24 - JUNE 24.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC - ARYAN - APRIL 23 - JUNE 23.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC - ARYAN - JULY 23 - SEPT 23.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC - ARYAN - OCT 23 - DEC 23.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC - ARYAN - JAN 24 - MARCH 24.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC - ARYAN - APRIL 24 - JUNE 24.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAC - ARYAN 2023-24.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Apr-Jun 23 AH.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Jul-Sep 23 AH.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Oct-Dec 23 AH.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Jan-Mar 24 AH.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Apr-Jun 24 AH.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (Form 3) Latest.pdf | 26 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration REVISED.pdf | 21 Apr 2023 |
| Layout approvalFile: Approved Layout NEW.pdf | 10 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Approved Layout NEW.pdf | 10 Mar 2023 |
| Copy of the legal title reportFile: Search Report Format A.PDF | 9 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Rahul N.PDF | 9 Mar 2023 |
| Proforma of Agreement for saleFile: ATS as per Rule 10(1)_compressed-1-7.pdf | 9 Mar 2023 |
| Proforma of Agreement for saleFile: ATS as per Rule 10(1)_compressed-8-14.pdf | 9 Mar 2023 |
| Proforma of Agreement for saleFile: ATS as per Rule 10(1)_compressed-15-20.pdf | 9 Mar 2023 |
| Building plan approvalFile: Building Plan.pdf | 2 Mar 2023 |
| PAN CardFile: VA Developers PAN.pdf | 2 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance0001.PDF | 2 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Legal0001.PDF | 2 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance0001.PDF | 2 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Legal0001.PDF | 2 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 2 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement and Extension.pdf | 2 Mar 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC.PDF | 2 Mar 2023 |
| Declaration in FORM BFile: Affadvit - Developer.PDF | 2 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200257375688_For_Asset_Based_Search.pdf | 2 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Vishal.PDF | 2 Mar 2023 |
| Proforma of Allotment letterFile: Allotment Letter.PDF | 2 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation about Allotment.PDF | 2 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation about ATS.PDF | 2 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 51 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ARYAN HILLS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SATARA1,400+ in Aurangabad
Construction of 1056 EWS Tenements on Gut No 9
AURANGABAD HOUSING AND AREA DEVELOPMENT BO
PMAY U PADEGAON
M/s Laxmi JV
Khinvasara City
Ravindra Champalal Khinvasara
SHRI GOVINDAM HEIGHTS
SHREE VYANKATESHA INFRA
GANGOTRI VIHAR PHASE I
INSPIRA REALTY LLP
VIYAAN ANANTA PHASE II
RIDDHI VIYAAN VENTURES
See every Aurangabad project, with the district possession charts
Builder: VA DEVELOPERS
VA DEVELOPERS has 2 registrations on MahaRERA, including PRAYAG ADITYA and ARYAN HILLS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that ARYAN HILLS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ARYAN HILLS is delayed beyond 19 Feb 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARYAN HILLS?
The registered promoter entity is VA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARYAN HILLS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ARYAN HILLS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARYAN HILLS?
The professionals named in the filing: Architect: J B ASSOCIATES; Engineer: AKASH SHELAR; Chartered Accountant: KAPVALT & CO; Chartered Accountant: KAPVALT & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARYAN HILLS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback