Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 95%
61 of 75Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Aryam is a Others project by MYRA INFRASTRUCTURE in Mumbai City, Maharashtra, registered with MahaRERA as P51900052888 on 5 Oct 2023. Possession is promised by 31 Dec 2027. 14 of the 75 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAryam
  • TypeOthers
  • Location
    • 21-29 Popatwadi Lane
    • Kalbadevi Road
    • Mumbai City
    • 400002
  • Pincode400002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900052888
  • ReraGenie IDRG-MH-06587

Builder

  • NameMYRA INFRASTRUCTURE
  • Entity typePartnership
  • PartnersMINISH BABULAL KADAKIA, RITA MINISH KADAKIA, FORUM ANKIT KADAKIA

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

19%14 of 75 units booked
90.9%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AryamNA212066975

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Aryam: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area532 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Nov 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4997.21
Proposed, not sanctioned3,944 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchParle Square 3rd floor B N Agarwal Commercial Comples Mogibai Road Ville Parle East Mumbai 400057
Estimated costRs 20.02 cr
Cost incurredRs 18.19 cr
Work done90.86%
BuildingWingEstimatedIncurred
AryamNARs 20.02 crRs 18.19 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChudawala & Associates
EngineerZ Z Consultants
EngineerSUPCONS CONSULTANTS
Chartered AccountantGopal Heda & Associates
Chartered AccountantJIMIT SHAH
Chartered AccountantNEHALI & CO
PartnerRole in project
MYRA INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Arch Certificate POPATWADI 07-07-26.pdf10 Jul 2026
Withdrawal Update Form 2File: Form 2- Engineer Certificate JUN 26.pdf10 Jul 2026
Withdrawal Update Form 3File: CA Certificate - Signed (1).pdf10 Jul 2026
Withdrawal Update Form 1File: Architects Certificate - Signed.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2- Engineer Certificate MAR 26.pdf22 Apr 2026
Withdrawal Update Form 3File: CA Certificate - Signed (1).pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Dec 25.pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2- Engineer Certificate DEC 25.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Dec 25.pdf5 Feb 2026
Withdrawal Update Form 1File: Form 1 Sep 25(Signed)1.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep 25(Signed).pdf4 Feb 2026
Withdrawal Update Form 3File: form 3 Sep 25(Signed)1.pdf4 Feb 2026
Withdrawal Update Form 1File: Architect Certificate Jun 25.pdf3 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Jun 25-signed.pdf3 Feb 2026
Withdrawal Update Form 3File: Architect Certificate Jun 25.pdf3 Feb 2026
Form 2A (FY 2024-2025)File: Quality Assurance Form 2A-signed.pdf1 Oct 2025
Form 5 (FY 2024-2025)File: signed form 5 myra 24-25 (1).pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate MAR'25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate MAR 25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER Certificate MAR'25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 03 23.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 03 24.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 06 24.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 09 24.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 12 24.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate Form 2 OCT 23 TO DEC 23_signed.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate Form 2 APR24 TO JUN 24_signed.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: april to june 24 Arch Certifcate Form 1_.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certifcate Form 1 JUL TO SEPT 24.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate OCT TO DEC 24.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate Form 2 JUL TO SEPT 24.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate OCT TO DEC 24-signed.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate form 3 maharera ARYAM.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 myra ARYAM.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POPATWADI CERTIFICATE FORM 1 25-04-24 (1).pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POPATWADI CERTIFICATE FORM 1 25-04-24.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Popatwadi.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Popatwadi.pdf7 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Gopal Heda.pdf7 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Gopal Heda.pdf7 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 2419423_FurtherCC_signed.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 02042024.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech certificate.pdf24 Jan 2024
Declaration about Commencement CertificateFile: Form D Declaration CC.pdf13 Sep 2023
Declaration in FORM BFile: Form B.pdf13 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Minishbhai.pdf13 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Ritaben.pdf13 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Forum.pdf13 Sep 2023
Proforma of Agreement for saleFile: Rera Format Agreement for Sale.pdf13 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A Bank Account.pdf13 Sep 2023
Copy of the legal title reportFile: Title Certificate New.pdf8 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New_compressed.pdf8 Sep 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrancees.pdf25 Aug 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrancees.pdf25 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf25 Aug 2023
Proforma of Allotment letterFile: Model form of Allotment letter.pdf25 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf25 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for Sale.pdf25 Aug 2023
Layout approvalFile: Layout Plan.pdf23 Aug 2023
Building plan approvalFile: Layout Plan.pdf23 Aug 2023
Building plan approvalFile: plan 2.pdf23 Aug 2023
Building plan approvalFile: plan 3.pdf23 Aug 2023
Building plan approvalFile: plan 4.pdf23 Aug 2023
Building plan approvalFile: plan 5.pdf23 Aug 2023
PAN CardFile: Pan Card Myra Infra.pdf23 Aug 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrances.pdf23 Aug 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf23 Aug 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrances.pdf23 Aug 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf23 Aug 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf23 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan.pdf23 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf23 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 3.pdf23 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 4.pdf23 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 5.pdf23 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_signed Plinth.pdf23 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Aug 2023

How this compares with Mumbai City

19%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aryam on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalbadevi Road780+ in Mumbai City

2 kmAryamCompleted 16Lapsed / revoked 22Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 78 registered projects within 2 km.

Builder: MYRA INFRASTRUCTURE

MYRA INFRASTRUCTURE has 1 registration on MahaRERA, including Aryam. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Aryam is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aryam?

The registered promoter entity is MYRA INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aryam?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aryam?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aryam?

The professionals named in the filing: Architect: Chudawala & Associates; Engineer: Z Z Consultants; Engineer: SUPCONS CONSULTANTS; Chartered Accountant: Gopal Heda & Associates; Chartered Accountant: JIMIT SHAH; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aryam?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aryam. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aryam to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.