ARYA ARIANA

By ASHAPURA CORPORATION

RG-MH-28033 · RERA P51700025165 · Last updated on MahaRERA portal: 10 Jul 2025

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
4 of 11Construction stages donefurthest along: Basement (if any), 90%
20 of 51Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

ARYA ARIANA is a Others project by ASHAPURA CORPORATION in Thane, Maharashtra, registered with MahaRERA as P51700025165 on 20 Mar 2020. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 30 months from the original filing. 31 of the 51 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameARYA ARIANA
  • TypeOthers
  • Location
    • G B PATHARLI
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700025165
  • ReraGenie IDRG-MH-28033

Builder

  • NameASHAPURA CORPORATION
  • Entity typePartnership
  • GSTIN27AAUFA6112B1ZP
  • PartnersDILIP HIMMATLAL PAREKH, HIMAT VRAJLAL SHETH, BIMAL PRANLAL MEHTA, AMIT HARSHADRAI SHAH, KISHORBHAI VINODRAI SHAH

Key dates

1 months past promisethis monthRegisteredMar 2020First promiseMar 2024Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Mar 2020
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Mar 2024)
  • Buildings1 building record
  • Documents filed95 files

Current status

61%31 of 51 units booked

Figures as on 10 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARYA ARIANANA9924951

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

ARYA ARIANA: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 10 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area786 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ASHAPURA CORPORATIONKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI1639.4
Proposed, not sanctioned1,639 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST MUMBAI 400077

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantU B SURA & CO
PartnerRole in project
ASHAPURA CORPORATION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25052621092Mar 2024 → Sep 2026

Reason as filed by the promoterCORONA AND SHIRTAGE OF LABOIUR PAPER WORK

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jul 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: kdmc par.pdf10 Jul 2025
Layout approvalFile: ackdmcmcmcm.pdf10 Jul 2025
Building plan approvalFile: kdmc par.pdf10 Jul 2025
Building plan approvalFile: ackdmcmcmcm.pdf10 Jul 2025
Copy of Layout Approval (in case of layout)File: kdmc par.pdf10 Jul 2025
Copy of Layout Approval (in case of layout)File: ackdmcmcmcm.pdf10 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: ackdmc.pdf10 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: kdmc par.pdf10 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: ackdmcmcmcm.pdf10 Jul 2025
Copy of the legal title reportFile: Title Certificate - converted.pdf9 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC Form 2 Engineer Certificate.pdf1 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Form1 Architect 31032025.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Form1 Architect 31012025.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: AC Disclosure Inventory 27012025.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: AC Form5 CA 31032022.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AC Form5 CA 31032023.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AC Form5 CA 31032023.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AC Form5 CA 31032024.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AC Form5 CA 31032024.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 31032024.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 31122023.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 30092023.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 30062023.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 31032023.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 31122022_compressed.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 30092022.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 30062022.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 30062021.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 31032022.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 31122021.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3 CA 30092021.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect Certificate 29112024.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 31032024.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 31122023.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 30092023.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 31122021.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 30062023.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 31032023.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 31122022.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 30092022.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 30062022.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 31032022.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 30092021.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 30062021.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate 31032021.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Architect Form1 23032024.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC Engineer Form2 28032024.pdf28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AC Engineer Form2 28032024.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: AC Disclosure Inventory 27032024.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: AC Disclosure Inventory 18032024.pdf18 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC Form2 Engineer Certificate.pdf21 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AC Form2 Engineer Certificate.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ac Architect Form1 08022024.pdf14 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 270923.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 131023.pdf18 Oct 2023
Building plan approvalFile: AC KDMC DWG 110723.pdf26 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: AC KDMC DWG 110723.pdf26 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: AC KDMC CC 11072023.pdf26 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Architect Form1 07072023.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Form1 Architect 17052023.pdf26 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AC CA Form5 31032020.pdf1 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AC CA Form5 31032021.pdf1 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AC CA Form5 31032022.pdf1 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AC Engineer 20012020.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: AC Engineer 31032021.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AC Engineer 31032022.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AC Engineer 01082022.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AC Engineer 14012023.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AC Engineer 23022023.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2A Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Dt 14012023.pdf4 Feb 2023
Layout approvalFile: REVPLAN1.pdf13 Dec 2022
Building plan approvalFile: REV PLAN 2.pdf13 Dec 2022
Building plan approvalFile: REV PLAN 3.pdf13 Dec 2022
Copy of Layout Approval (in case of layout)File: REVPLAN1.pdf13 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: REV PLAN 2.pdf13 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: REV PLAN 3.pdf13 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: KDMC CC2.pdf13 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: KDMC CC3.pdf13 Dec 2022

How this compares with Thane

61%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 30 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARYA ARIANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DOMBIVLI7,600+ in Thane

2 kmARYA ARIANACompleted 94Lapsed / revoked 83Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 319 registered projects within 2 km.

Builder: ASHAPURA CORPORATION

ASHAPURA CORPORATION has 1 registration on MahaRERA, including ARYA ARIANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ARYA ARIANA is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARYA ARIANA?

The registered promoter entity is ASHAPURA CORPORATION, a partnership as per the filing. Its GSTIN 27AAUFA6112B1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARYA ARIANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARYA ARIANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARYA ARIANA?

The professionals named in the filing: Chartered Accountant: U B SURA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARYA ARIANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARYA ARIANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARYA ARIANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.