Registered No litigation declared Others project

ARISHA

By Amol Ajit Ravetkar

RG-MH-95899 · RERA P52100055981 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 8 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 15 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
16 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

ARISHA is a Others project by Amol Ajit Ravetkar in Pune, Maharashtra, registered with MahaRERA as P52100055981 on 2 May 2024. Possession is promised by 31 Mar 2027. 0 of the 16 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameARISHA
  • TypeOthers
  • Location
    • Prabhat Road
    • Erandwane
    • Erandwana
    • Haveli
    • Pune
    • 411004
  • Pincode411004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055981
  • ReraGenie IDRG-MH-95899

Builder

  • NameAmol Ajit Ravetkar
  • Entity typeIndividual
  • GSTIN27AGTPR5446G1ZR
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations15 more →
  • Completed5 of 16
  • Declared earlier projects8 →

Key dates

this monthRegisteredMay 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed56 files

Current status

0%0 of 16 units booked

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ArishaNA7715116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Arisha: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area509 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Dec 2025
LandownerVillageDistrict
Saiprasad Co-Operative Housing Society Ltd.Pune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI2348.76
Proposed, not sanctioned849 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCTS No 870, Laukik Apartments, Plot No 3, Bhandarkar Rd, Pune 411004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAkshay Khirodkar
ArchitectKaumudi Mathane
EngineerNilesh Gujar
Chartered AccountantPhule Wagh & Associates LLP
PartnerRole in project
Amol Ajit Ravetkar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Arhitect Certificate Q4.pdf18 Jun 2026
Form 2File: Form 2 Engineer Certificate Arisha Q4.pdf18 Jun 2026
Form 3File: Q4 FY 2025-26 FORM 3 Chartered Accountant Certificate-ARISHA.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Inventory Declaration Sold Unsold Q4.pdf18 Jun 2026
Form 1File: Form 1 Architect Cartificate Q1 FY 2025-26.pdf18 Jun 2026
Form 2File: Form 2 Engineer Cartificate Q1 FY 2025-26.pdf18 Jun 2026
Form 3File: Q1 FY 2025-26 FORM 3 Chartered Accountant Certificate-ARISHA.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q1 FY 2025-26.pdf18 Jun 2026
Form 1File: Form 1 Architect Cartificate Q2 FY 2025-26.pdf18 Jun 2026
Form 2File: Form 2 Engineer Cartificate Q2 FY 2025-26.pdf18 Jun 2026
Form 3File: Q2 FY 2025-26 FORM 3 Chartered Accountant Certificate-ARISHA.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q2 FY 2025-26.pdf18 Jun 2026
Form 1File: Form 1 Architect Cartificate Q3 FY 2025-26.pdf18 Jun 2026
Form 2File: Form 2 Engineers Cartificate Q3 FY 2025-26.pdf18 Jun 2026
Form 3File: Q3 FY 2025-26 FORM 3 Chartered Accountant Certificate-ARISHA.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q3 FY 2025-26.pdf18 Jun 2026
Form 1File: Form 1.pdf20 May 2025
Form 2File: FORM 2 Engineer Certificate- Updated.pdf20 May 2025
Form 3File: Q4 FY 2024-25 FORM 3 Chartered Accountant Certificate-ARISHA.pdf20 May 2025
Disclosure of Sold and Booked InventoryFile: Inventory Declaration Sold Unsold Arisha.pdf20 May 2025
Declaration about Commencement CertificateFile: Format D-Commencement and Plan.pdf12 Dec 2024
Layout approvalFile: Plan 1-2.pdf11 Dec 2024
Building plan approvalFile: Plan 2-2.pdf11 Dec 2024
Copy of Layout Approval (in case of layout)File: Plan 1-2.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2024-25 FORM 3 Chartered Accountant Certificate-ARISHA.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf11 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: revised CC.pdf11 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2-2.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Declaration Sold Unsold.pdf11 Dec 2024
Details of encumbrances concerned to FinanceFile: Financial Encumburance Arisha.pdf13 May 2024
Details of encumbrances concerned to LegalFile: Financial Encumburance Arisha.pdf13 May 2024
Proforma of Agreement for saleFile: AFS Final.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Chartered Accountant Certificate-ARISHA 240402024.pdf24 Apr 2024
Layout approvalFile: Plan 1.pdf5 Apr 2024
Building plan approvalFile: Plan 2.pdf5 Apr 2024
Copy of Layout Approval (in case of layout)File: Plan 1.pdf5 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf5 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Arisha CC.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Chartered Accountant Certificate-ARISHA.pdf5 Apr 2024
Other - TechnicalFile: Order 50 ANNEXURE A.pdf5 Apr 2024
Declaration about Commencement CertificateFile: Format D-Commencement Plan.pdf23 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf23 Mar 2024
Proforma of Agreement for saleFile: AFS Arisha upload.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration_of_no_Encumbrance_-_Finance.pdf11 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration_of_no_Encumbrance_-_Legal.pdf11 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration_of_no_Encumbrance_-_Finance.pdf11 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration_of_no_Encumbrance_-_Legal.pdf11 Mar 2024
Declaration in FORM BFile: Form_B_Affidavit_-_Ravetkar.pdf11 Mar 2024
CERSAI detailsFile: Undertaking_CERSAI.pdf11 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_Disclosure_of_Interest_in_Entities.pdf11 Mar 2024
Proforma of Allotment letterFile: Allotment_letter_as_per_order_31.pdf11 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration_about_seperate_bank_account_as_per_order_34.pdf11 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation_Report_Allotment_Letter.pdf11 Mar 2024
PAN CardFile: PAN Card 2.pdf27 Feb 2024
Copy of the legal title reportFile: Format A search report.pdf27 Feb 2024

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ManaliParvati Sahakar Nagar Pune 41100911CompletedFeb 2021Oct 2020
SuvarnaLane no 19 Dahanukar Colony Kothrud Pune 41103820CompletedMar 2020Jan 2020
PiyushaOff. law college road Erandwane Pune 41100418CompletedMar 2019Jan 2019
Anusha ResidencyParvati10CompletedJan 2017Dec 2016
Rahul Vihar - ALane 18 Dhanukar Colony Kothrud Pune15CompletedOct 2016Oct 2016
Om BramhaDhanukar Colony15CompletedMar 2015Mar 2015
TulipsLane no 14 Rajwade Path Bhandarkar Road Pune 41100421CompletedApr 2013Apr 2013
PoornimaGultekdi18CompletedDec 2012Dec 2012

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARISHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Erandwane13,700+ in Pune

2 kmARISHACompleted 82Lapsed / revoked 34Other 164Dot size: filed unitsN

Filed coordinates, straight-line distance. 280 registered projects within 2 km.

Builder: Amol Ajit Ravetkar

Amol Ajit Ravetkar has 16 registrations on MahaRERA, including Piyusha and Sukhniwas. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ARISHA is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARISHA?

The registered promoter entity is Amol Ajit Ravetkar, an individual as per the filing. Its GSTIN 27AGTPR5446G1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARISHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARISHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARISHA?

The professionals named in the filing: Architect: Akshay Khirodkar; Architect: Kaumudi Mathane; Engineer: Nilesh Gujar; Chartered Accountant: Phule Wagh & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARISHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARISHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARISHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.