Home / Browse projects / Mumbai City, Maharashtra / ARIHANT TOWER
ARIHANT TOWER
RG-MH-30719 · RERA P51900031107 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT TOWER is a Residential / Group Housing project by MEHTA DEVELOPERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900031107 on 5 Oct 2021. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 11 of the 77 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameARIHANT TOWER
- TypeResidential / Group Housing
- Location
- S K BOLE MARG
- DAGADWADI DADAR (WEST)
- Mumbai City
- 400028
- Pincode400028
- RERA no.P51900031107
- ReraGenie IDRG-MH-30719
Builder
- NameMEHTA DEVELOPERS
- Entity typePartnership
- PartnerMANISH JUGRAJ RATHOD
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2021
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ARIHANT TOWER | NA | 23 | 0 | 75 | 2 | 77 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 98%.
ARIHANT TOWER: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 98% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 73% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed29
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ARIHANT TOWER | NA | Rs 17.52 cr | Rs 13.93 cr |
| - | NA | Rs 9.23 cr | Rs 6.11 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NEERAJ CHUDAWALA |
| Engineer | SATYANARAYAN PRAJAPATI |
| Chartered Accountant | J C BAFNA |
| Chartered Accountant | Yashesh Mehta |
| Partner | Role in project |
|---|---|
| MEHTA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: fORM 3.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE Radha Niwas Arihant Tower Q2 FY 25-26.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: Engineers Certificate -Arihant Tower q-3 fy 25-26.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFIED FORM 3 Q-3 FY 25-26 ARIHANT TOWER RADHA NIWA.pdf | 16 Apr 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE Radha Niwas Arihant Tower Q2 FY 25-26.pdf | 20 Nov 2025 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE ARIHANT TOWER FORM 2 Q-1 FY 23-24.pdf | 20 Nov 2025 |
| Withdrawal Update Form 3File: FINAL CA CERTFICATE FORM 3 Q2 FY 25-26 ARIHANT TOWER.pdf | 20 Nov 2025 |
| Building plan approvalFile: 321069075-26-03-2024 02-08-57$_$Drawing.pdf | 31 Jul 2025 |
| Commencement certificateFile: Further CC dated .pdf | 31 Jul 2025 |
| Commencement certificateFile: REVISED CC REVALIDATION - ARIHANT TOWER .pdf | 31 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Q4 FY 24 25 ARIHANT TOWERS.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA CERTIFICATE FORM 3 ARIHANT TOWER Q-3 FY 24-25.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architecture certificate Q 3 24 25.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Q3 .pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE Q-2 FY 24-25 ARIHANT TOWER.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE-FORM 1 -ARIHANT TOWER Q-2 FY 24-25.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE -FORM 3 ARIHANT TOWER Q-2 FY 24-25.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFIED ARIHANT TOWER Q-1 FY 24-25.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE ARIHANT TOWER Q-1 FY 24-25.pdf | 25 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE ARIHANT TOWER FORM 2 Q-1 FY 23-24.pdf | 25 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3 CA CERTIFICATE Q-4 FY 23-24 ARIHANT TOWER.pdf | 30 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA CERTIFICATE NIWAS FY 23-24.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT TOWER ARCHITECTURE CERTIFICATE .pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARIHANT TOWER ENGINEERS CERTIFICATE .pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM-3 CA CERTIFICATE Q3-23-24 ARIHANT TOWER_compressed.pdf | 7 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE ARIHANT TOWER.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA CERTIFICATE FORM 3 Q-2 FY 23-24-ARIHANT TOWER.pdf | 11 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL form 3 CA CERTIFICATE - Q-1 FY 23-24 ARIHANT TOWER.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 23 24.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2 23 24.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A - ENGINEERS SITE SUPERVISOR- ARIHANT TOWER FY 22-23.pdf | 27 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ARIHANT H TOWER.pdf | 28 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA CERTIFICATE ARIHANT TOWER Q 4.pdf | 20 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECUTURE CERTIFICATE Q - 4 - ARIHANT TOWER.pdf | 19 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL RERA CA CERTIFICATE Q- 3 ARIHANT TOWER_compressed.pdf | 30 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CA CERTIFICATE ARIHANT TOWER PROJECT.pdf | 17 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE Q -3 ARIHANT TOWER.pdf | 30 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE -Q-3 ARIHANT TOWER.pdf | 30 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3 CA SIGNED Q-2 - ARIHANT TOWER_compressed.pdf | 9 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE_compressed.pdf | 13 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERT_compressed.pdf | 13 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL CA CERTIFICATE.pdf | 6 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL RERA CA CERTIFICATE q4 ARIHANT TOWER_compressed.pdf | 22 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SITE SUPERVISOR CERTIFICATE - ARIHANT TOWER.pdf | 20 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE Q-1 FY 22-23 ARIHANT TOWER.pdf | 18 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CER.pdf | 18 Jul 2022 |
| Proforma of Allotment letterFile: revised DRAFT OF SALE AGREEMENT.pdf | 7 Jun 2022 |
| Details of encumbrancesFile: revised encumbrance certificate arihant tower.pdf | 31 May 2022 |
| Proforma of Allotment letterFile: DRAFT OF SALE AGREEMENT (AS PER RERA) - partnership - Copy.pdf | 31 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA FORM 3 Q-3_compressed.pdf | 15 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architecture certificate.pdf | 25 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Rera form 2 q3 2122.pdf | 25 Feb 2022 |
| Building plan approvalFile: plan.pdf | 30 Sep 2021 |
| Layout approvalFile: plan.pdf | 30 Sep 2021 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT- SUMMARY.pdf | 30 Sep 2021 |
| Copy of the legal title reportFile: MEHTA DEVP ( LEGAL TITLE REPORT_compressed.pdf | 30 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: plan.pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan.pdf | 30 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA CERTIFICATE FINAL.pdf | 27 Sep 2021 |
| OtherFile: MD PARTNERSHIP FIRM FY 1718compressed.pdf | 27 Sep 2021 |
| OtherFile: MDPARTNERSHIP FIRM FY 1819compressed.pdf | 27 Sep 2021 |
| PAN CardFile: PARTNERSHIP PAN CARD.pdf | 22 Sep 2021 |
| Details of encumbrancesFile: SELF DECLARATION ABOUT NON-ENCUMBRANCES.pdf | 22 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 22 Sep 2021 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf | 22 Sep 2021 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION- FORM B.pdf | 22 Sep 2021 |
| Proforma of Allotment letterFile: DRAFT OF SALE AGREEMENT (AS PER RERA) - Copy.pdf | 22 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ARIHANT TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DAGADWADI DADAR (WEST)780+ in Mumbai City
Kohinoor Square Phase 1
Kohinoor CTNL Infrastructure Company Priva
Sigma Garnet
COLO COLOR PRIVATE LIMITED
PALETTE
SURAJ ESTATE DEVELOPERS LTD
Eon One
Firstlight Properties Private Limited
Ratan Address
Shri Nakoda Enterprises
Promesa West End
M/s. virtue Enterprises
See every Mumbai City project, with the district possession charts
Builder: MEHTA DEVELOPERS
MEHTA DEVELOPERS has 3 registrations on MahaRERA, including BHOOMI PRIDE and MANISHA APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if ARIHANT TOWER is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT TOWER?
The registered promoter entity is MEHTA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ARIHANT TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT TOWER?
The professionals named in the filing: Architect: NEERAJ CHUDAWALA; Engineer: SATYANARAYAN PRAJAPATI; Chartered Accountant: J C BAFNA; Chartered Accountant: Yashesh Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback