ARHAM URBANIA

By ARHAM BUILDERS AND DEVELOPERS

RG-MH-46535 · RERA P51500031188 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 48 months
  • 1 extension taken
  • Rs 27.00 crore secured on the land, in favour of BULDHANA URBAN COOPERATIVE CREDIT SOCIETY
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 48 months from the original
18 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 80%
103 of 125Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

ARHAM URBANIA is a Residential / Group Housing project by ARHAM BUILDERS AND DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500031188 on 11 Oct 2021. Possession is promised by 31 Dec 2029. The completion date has moved by 48 months from the original filing. 22 of the 125 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameARHAM URBANIA
  • TypeResidential / Group Housing
  • Location
    • GARKHEDA
    • GARKHEDA PARISAR
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500031188
  • ReraGenie IDRG-MH-46535

Builder

  • NameARHAM BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABQFS2479L1ZS
  • PartnersDEEPTI JAYESHKUMAR SAHUJI, ASHISH TEJMALJI MUGDIYA

Key dates

this monthRegisteredOct 2021First promiseDec 2025Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Oct 2021
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed129 files

Current status

18%22 of 125 units booked
80.8%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D WINGD WING10864064
C WINGC WING101056561

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

D WING · wing D WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING · wing C WING93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes30%
Street LightingYes50%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed135

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots135
Closed/Covered135
BuildingClosed/CoveredTotal
D WING D WING8484
C WING C WING5151

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,577 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofBULDHANA URBAN COOPERATIVE CREDIT SOCIETY
Secured amountRs 27.00 crore
CERSAI search filedYes
Declared on14 Jul 2026
LandownerVillageDistrict
RADHESHYAM DEOKISAN CHANDAKbuldana (MCL)Buldana
LAXMI NRUSIHA CONSTRUCTIOAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI18712.48
Proposed, not sanctioned18,712 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Plot No 64, CTS No 15308, Sarang Co Op Hsg Soc, Garkheda Aurangabad, Maharashtra Pin 4
Estimated costRs 51.00 cr
Cost incurredRs 41.21 cr
Work done80.8%
BuildingWingEstimatedIncurred
D WINGD WINGRs 24.00 crRs 24.00 cr
C WINGC WINGRs 24.00 crRs 14.95 cr
-NARs 3.00 crRs 2.26 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ KALA AND ASSOCIATES KALA
EngineerCORE CONSULTANTS
EngineerRAJESH CHARLAS CHITTE
EngineerPANKAJ KHADKE
EngineerAbhijeet Jadhav
Chartered AccountantSAHUJI AND COMPANY
Chartered AccountantADP AND ASSOCIATES
PartnerRole in project
ARHAM BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29122519080Dec 2025 → Dec 2029

Reason as filed by the promoterDue to technical issues it required extra time to get the final completion and remaining work

Litigation declared1

CaseCourtStatus
ST/32117/2024HIGH COURTOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: permission-1-8.pdf29 Jul 2026
Building plan approvalFile: permission2-8-WITH REMARKS FINAL.pdf29 Jul 2026
Building plan approvalFile: permission3-8.pdf29 Jul 2026
Building plan approvalFile: permission4-8.pdf29 Jul 2026
Building plan approvalFile: permission5-8.pdf29 Jul 2026
Building plan approvalFile: permission6-8.pdf29 Jul 2026
Building plan approvalFile: permission7-8.pdf29 Jul 2026
Building plan approvalFile: permission8-8.pdf29 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - final.pdf16 Jul 2026
Withdrawal Update Form 1File: final Architect Certificate form 1.pdf14 Jul 2026
Withdrawal Update Form 1File: final Architect Certificate form 1.pdf14 Jul 2026
Withdrawal Update Form 2File: final Engineers Certificate form 2.pdf14 Jul 2026
Withdrawal Update Form 2File: final Engineers Certificate form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: final CA Certificate form 3 fresh.pdf14 Jul 2026
Withdrawal Update Form 3File: final CA Certificate form 3 fresh.pdf14 Jul 2026
Form 5 (FY 2025-2026)File: form 5 ADP ASSOCIATES final.pdf14 Jul 2026
Commencement certificateFile: Commencement Cerificate (Building Permission) 277-2022-23.pdf30 Jan 2026
Layout approvalFile: Building Permission Layout No1 (2022).pdf30 Jan 2026
Building plan approvalFile: Building Permission Layout No3 (2022).pdf30 Jan 2026
Building plan approvalFile: Building Permission Layout No4 com(2022).pdf30 Jan 2026
Building plan approvalFile: Building Permission Layout No5 co(2022) (1).pdf30 Jan 2026
Building plan approvalFile: Building Permission Layout No6 (2022).pdf30 Jan 2026
Building plan approvalFile: Building Permission Layout No7 (2022).pdf30 Jan 2026
Building plan approvalFile: Building Permission Layout No8 (2022).pdf30 Jan 2026
Building plan approvalFile: Building Permission Layout No2 (2022).pdf30 Jan 2026
Withdrawal Update Form 1File: Arham FORM-1 Dec 25.pdf30 Jan 2026
Withdrawal Update Form 2File: Arham FORM-2 Dec 25.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 With Declaration.pdf30 Jan 2026
Withdrawal Update Form 1File: FORM 1-signed.pdf17 Dec 2025
Withdrawal Update Form 2File: FORM2-signed.pdf17 Dec 2025
Withdrawal Update Form 3File: ARHAM BUILDERS FORM-3 UPDATED.pdf17 Dec 2025
Withdrawal Update Form 1File: FORM 1-signed.pdf8 Nov 2025
Withdrawal Update Form 1File: FORM 1-signed.pdf8 Nov 2025
Withdrawal Update Form 1File: FORM 1-signed.pdf8 Nov 2025
Withdrawal Update Form 2File: FORM2-signed.pdf8 Nov 2025
Withdrawal Update Form 2File: FORM2-signed.pdf8 Nov 2025
Withdrawal Update Form 2File: FORM2-signed.pdf8 Nov 2025
Withdrawal Update Form 3File: ARHAM BUILDERS FORM-3 UPDATED.pdf8 Nov 2025
Withdrawal Update Form 3File: ARHAM BUILDERS FORM-3 UPDATED.pdf8 Nov 2025
Withdrawal Update Form 3File: ARHAM BUILDERS FORM-3 UPDATED.pdf8 Nov 2025
Form 1File: FORM-1 DEC-21.pdf16 Jul 2025
Form 2File: FORM-2-DEC-21.pdf16 Jul 2025
Form 3File: FORM-3-DEC-21.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-DEC-21.pdf16 Jul 2025
Form 1File: FORM-1-MAR-22.pdf16 Jul 2025
Form 2File: FORM-2-MAR-22.pdf16 Jul 2025
Form 3File: FORM-3-MAR-22.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-MAR-22.pdf16 Jul 2025
Form 1File: FORM-1-JUN-22.pdf16 Jul 2025
Form 2File: FORM-2-JUN-22.pdf16 Jul 2025
Form 3File: FORM-3-JUN-22.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-JUN-22.pdf16 Jul 2025
Form 1File: FORM-1-SEP-22.pdf16 Jul 2025
Form 2File: FORM-2-SEP-22.pdf16 Jul 2025
Form 3File: FORM-3-SEP-22.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-SEP-22.pdf16 Jul 2025
Form 1File: FORM-1-DEC-22.pdf16 Jul 2025
Form 2File: FORM-2-DEC-22.pdf16 Jul 2025
Form 3File: FORM-3-DEC-22.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-DEC-22.pdf16 Jul 2025
Form 1File: FORM-1-MAR-23.pdf16 Jul 2025
Form 2File: FORM-2-MAR-23.pdf16 Jul 2025
Form 3File: FORM-3-MAR-23.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-MAR-23.pdf16 Jul 2025
Form 1File: FORM-1-JUN-23.pdf16 Jul 2025
Form 2File: FORM-2-JUN-23.pdf16 Jul 2025
Form 3File: FORM-3-JUN-23.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-JUN-23.pdf16 Jul 2025
Form 1File: FORM-1-SEP-23.pdf16 Jul 2025
Form 2File: FORM-2-SEP-23.pdf16 Jul 2025
Form 3File: FORM-3-SEP-23.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-SEP-23.pdf16 Jul 2025
Form 1File: FORM-1-DEC-23.pdf16 Jul 2025
Form 2File: FORM-2-DEC-23.pdf16 Jul 2025
Form 3File: FORM-3-DEC-23.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-DEC-23.pdf16 Jul 2025
Form 1File: FORM-1-MAR-24.pdf16 Jul 2025
Form 2File: FORM-2-MAR-24.pdf16 Jul 2025
Form 3File: FORM-3-MAR-24.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER-MAR-24.pdf16 Jul 2025

How this compares with Aurangabad

18%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 48 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep ARHAM URBANIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GARKHEDA PARISAR1,400+ in Aurangabad

2 kmARHAM URBANIACompleted 43Lapsed / revoked 29Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: ARHAM BUILDERS AND DEVELOPERS

ARHAM BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including ARHAM URBANIA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if ARHAM URBANIA is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARHAM URBANIA?

The registered promoter entity is ARHAM BUILDERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABQFS2479L1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARHAM URBANIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARHAM URBANIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARHAM URBANIA?

The professionals named in the filing: Architect: MANOJ KALA AND ASSOCIATES KALA; Engineer: CORE CONSULTANTS; Engineer: RAJESH CHARLAS CHITTE; Engineer: PANKAJ KHADKE; Engineer: Abhijeet Jadhav; Chartered Accountant: SAHUJI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARHAM URBANIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARHAM URBANIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARHAM URBANIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.