ReraGenieLog inGet a buyer report

Home / Browse projects / ARC VISTA - PHASE 2

Completed No litigation declared Residential / Group Housing project

ARC VISTA - PHASE 2

By Chaitanya Realty

RG-MH-51797 · RERA P52100016473 · Last updated on MahaRERA portal: 8 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

ARC VISTA - PHASE 2 is a Residential / Group Housing project by Chaitanya Realty in MUNJOBA VASTI, 411015, registered with MahaRERA as P52100016473 on 18 May 2018. The registration is recorded completed; possession was promised by 30 Jun 2023.

At a glance

Project

  • NameARC VISTA - PHASE 2
  • TypeResidential / Group Housing
  • Location
    • NEAR SHREE NAGARI
    • MUNJOBA VASTI
    • 411015
  • Pincode411015
  • RERA no.P52100016473
  • ReraGenie IDRG-MH-51797

Builder

  • NameChaitanya Realty
  • Entity typePartnership
  • GSTIN27AAFFC3814R1Z2
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerDilip Mittal
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2018PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 May 2018
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

C: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 8 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered48

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area870 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
EPOCH ESTATE-Pune

Approvals and building plan

Permissible FSI4051.16
Proposed, not sanctioned4,051 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJINAGAR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects
EngineerSpectrum Consultants
Chartered AccountantSAC & Co LLP
Chartered AccountantPriyanka Chordiya and Associates
PartnerRole in project
Chaitanya Realty-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012477Jun 2023 → Jun 2024

Reason as filed by the promoterDue to Covid-19, there has been a substantial drop in demand of our category of product, hence the project has slowed down hence requesting the grace period to complete the project as 29/06/2024 instead of 30/06/2023

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Dec 2023

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 ARC VISTA PHASE-2 31-03-2024.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 ARC VISTA PHASE-2 31-03-2024.pdf8 Oct 2024
Certificates of CA (Form 3)File: Form 3 30092023 Arc vista Phase 2 both sign_compressed.pdf25 Jan 2024
Certificates of CA (Form 3)File: form 3 ARC VISTA-PHASE 2 22-12-2023 both sign_compressed.pdf25 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: From 4 for Arc Vista Phase 2.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arc Vista Phase 2.pdf11 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arc Vista Chaitany Realty.pdf11 Dec 2023
Certificates of CA (Form 3)File: Form 3 30112023 Arc vista Phase 2 both sign_compressed.pdf11 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC WING C .pdf11 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A Chaitanya Realty.pdf7 Sep 2023
Certificates of CA (Form 3)File: Form 3 30062023 Arc vista Phase 2 both sign-compressed.pdf7 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 PC FY 22_23 Arc Vista Ph 2_both sign_compressed.pdf7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCVISTA PHASE 2 ARCHITECT CERTIFICATE.pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ARCVISTA PHASE 2 ENGINEERING CERTIFICATE.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCVISTA PHASE 2.pdf27 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 for Arc Vista.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3_30032023_compressed.pdf27 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Arcvista Form 2A March 2022 signed.pdf13 Feb 2023
Certificates of CA (Form 3)File: Chaitanya Realty ARC Vista Ph2 30062022_compressed.pdf3 Feb 2023
Certificates of CA (Form 3)File: Chaitanya Realty ARC Vista Ph 2 30092022_compressed.pdf3 Feb 2023
Certificates of CA (Form 3)File: Form 3 ARC VISTA PHASE2 31122022_compressed.pdf3 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arc Vista.pdf23 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CHAITANYA REALTY -FORM 2-PH2.pdf23 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CHAITANYA REALTY -FORM 2-PH2.pdf23 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-DHANORI -ARCVISTA.pdf23 Jan 2023
Certificates of CA (Form 3)File: FORM 3 31032022 ARC Vista Ph2 Signed_compressed.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5 Chaitanya Reality ARC VISTA- Phase-2_compressed.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CHAITANYA REALTY Form 5.pdf16 Mar 2022
Layout approvalFile: New plan.pdf25 Aug 2021
Copy of Layout Approval (in case of layout)File: New plan.pdf25 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Arch cert sign Arcvista.pdf25 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A March 21 Arcvista II.pdf25 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Chaitanya Reality.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 CR 2020.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5)File: Form 5 Chaitanya Reality.pdf3 Oct 2019
Building plan approvalFile: Sanction plan.pdf14 May 2018
Layout approvalFile: Sanction plan.pdf14 May 2018
Layout approvalFile: LAYOUT 1-Model.pdf14 May 2018
Copy of the legal title reportFile: Search Title1.pdf14 May 2018
Details of encumbrancesFile: Encumbrance declaration.pdf14 May 2018
Copy of Layout Approval (in case of layout)File: Sanction plan.pdf14 May 2018
Copy of Layout Approval (in case of layout)File: LAYOUT 1-Model.pdf14 May 2018
Building Plan Approval (IOD)File: Sanction plan.pdf14 May 2018
Commencement Certificates / NA Order for plotted developmentFile: commcement.pdf14 May 2018
Declaration in FORM BFile: Form B.pdf14 May 2018
Certificates of CA (Form 3)File: Form 3.pdf14 May 2018
Proforma of Allotment letterFile: Allotment declaration.pdf14 May 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ARC VISTA phase 1S NO 23 2170CompletedSep 2015Aug 2015

Keep ARC VISTA - PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUNJOBA VASTI

Builder: Chaitanya Realty

Chaitanya Realty has 4 registrations on MahaRERA, including ARC VISTA - PHASE 2 and Chaitanya Krishnai. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if ARC VISTA - PHASE 2 is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARC VISTA - PHASE 2?

The registered promoter entity is Chaitanya Realty, a partnership as per the filing. Its GSTIN 27AAFFC3814R1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARC VISTA - PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARC VISTA - PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARC VISTA - PHASE 2?

The professionals named in the filing: Architect: Malwadkar Architects; Engineer: Spectrum Consultants; Chartered Accountant: SAC & Co LLP; Chartered Accountant: Priyanka Chordiya and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARC VISTA - PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARC VISTA - PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARC VISTA - PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.