Registered No litigation declared Commercial project

ARC ONE

By CHANDRA GUPTA ESTATES PRIVATE LIMITED

RG-MH-50815 · RERA P51800047410 · Last updated on MahaRERA portal: 24 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

ARC ONE is a Commercial project by CHANDRA GUPTA ESTATES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047410 on 27 Oct 2022. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameARC ONE
  • TypeCommercial
  • Location
    • NEW LINK ROAD
    • ANDHERI WEST
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047410
  • ReraGenie IDRG-MH-50815

Builder

  • NameCHANDRA GUPTA ESTATES PRIVATE LIMITED
  • Entity typeCompany
  • CINU70100MH1988PTC049306
  • GSTIN27AAACC2488D1ZU
  • DirectorAMOL SURESH KAMBLE

Key dates

this monthRegisteredOct 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARC ONENA310000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

ARC ONE: 92% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,102 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI11259.42
Proposed, not sanctioned10,307 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch12 A SAGAR VILLA JVPD MUMBAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantSANJAY & VIJAY ASSOCIATES
Chartered AccountantBelle Mohandas Shetty
PartnerRole in project
CHANDRA GUPTA ESTATES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Apr 2025

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Annexure D2_Full OC.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architects Certificate_Arc one_31122024.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Arc one_Sold Unsold_31122024.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandra Gupta Architect Certificate MrUttam Ranadive30092024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Chandragupta SOLD AND UNSOLD 30092024.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Certificate_Form 5_31032024.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandra Gupta_Architect's Certificate_Uttam Ranadive_30062024.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: Chandragupta _Sold Inventory 30062024.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandragupta Form 1 Architect Certificate 31032024.pdf2 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Chandra Gupta_Engineers Certificate Form2A 31032024.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: Chandra Gupta Disclosure of Sold 31032024.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chandra GuptaCA Certificate Form 3 30032024.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandragupta Form 1 Architect Certificate 31122023.pdf1 Feb 2024
Disclosure of sold/ booked inventoryFile: ARCONE Sold of Disclosure31122023.pdf1 Feb 2024
Disclosure of sold/ booked inventoryFile: Chandra Gupta_Disclosure of Sold 30092023.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chandra GuptA CA Certificates 30032023.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate_Form 5 FY 2223.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Chandra Gupta_Engineer's QUALITY Certificate Form2A 31032023.pdf22 Aug 2023
Disclosure of sold/ booked inventoryFile: Chandra Gupta_Disclosure of Sold 30062023.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chandra GuptA CA Certificates 30032023.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandra Gupta_Architects Certificate 30062023.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandra Gupta_Architects Certificate 30062023.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandra Gupta_Architects Certificate 31032023.pdf22 Apr 2023
Disclosure of sold/ booked inventoryFile: Chandra Gupta Declaration SOLD UNSOLD 31032023.pdf22 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandragupta_Architects Certificate 31122022.pdf16 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of SoldARC31122022.pdf16 Jan 2023
Building plan approvalFile: plan_2.pdf4 Oct 2022
Building plan approvalFile: Plan_3.pdf4 Oct 2022
Building plan approvalFile: Plan_4.pdf4 Oct 2022
Building plan approvalFile: plan_5.pdf4 Oct 2022
Building plan approvalFile: plan_6.pdf4 Oct 2022
Building plan approvalFile: plan_7.pdf4 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: plan_2.pdf4 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_3.pdf4 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_4.pdf4 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: plan_5.pdf4 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: plan_6.pdf4 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: plan_7.pdf4 Oct 2022
Other - LegalFile: Deviation in Allotment Letter.pdf4 Oct 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Details of formation of legal entity.pdf1 Oct 2022
Status of ConveyanceFile: Convayance.pdf1 Oct 2022
Other - LegalFile: Agreement for Sale_Draft.pdf1 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation in Ageement for Sale.pdf26 Sep 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances_Finance.pdf22 Sep 2022
Proforma of Allotment letterFile: Allotment Letter_Draft.pdf22 Sep 2022
Proforma of Agreement for saleFile: Allotment Letter_Draft.pdf22 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation in Allotment Letter.pdf22 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandra Gupta_Engineer's CertificateForm 2.pdf16 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chandra Gupta_Bhavesh Vora_CA Certificate.pdf16 Sep 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances_Legal.pdf13 Sep 2022
Declaration about Commencement CertificateFile: Chandra Gupta_Declaration of CC.pdf13 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Architect's Certificate_Uttam Ranadive.pdf13 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf13 Sep 2022
Layout approvalFile: LAYOUT PLAN.pdf12 Sep 2022
Building plan approvalFile: plan_1.pdf12 Sep 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf12 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: plan_1.pdf12 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CC.pdf12 Sep 2022
CERSAI detailsFile: Reconcilation of Cersai And report.pdf12 Sep 2022
PAN CardFile: Chandra gupta PAN.pdf2 Sep 2022
Copy of the legal title reportFile: Title Certificate.pdf2 Sep 2022
Declaration in FORM BFile: Form 'B' RERA.pdf2 Sep 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARC ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI WEST6,700+ in Mumbai Suburban

2 kmARC ONECompleted 96Lapsed / revoked 72Abeyance 1Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 309 registered projects within 2 km.

Builder: CHANDRA GUPTA ESTATES PRIVATE LIMITED

CHANDRA GUPTA ESTATES PRIVATE LIMITED has 1 registration on MahaRERA, including ARC ONE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ARC ONE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARC ONE?

The registered promoter entity is CHANDRA GUPTA ESTATES PRIVATE LIMITED, a company as per the filing. Its CIN U70100MH1988PTC049306 and GSTIN 27AAACC2488D1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARC ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARC ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARC ONE?

The professionals named in the filing: Chartered Accountant: SANJAY & VIJAY ASSOCIATES; Chartered Accountant: Belle Mohandas Shetty. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARC ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARC ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARC ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.