APPLE REGENCY KP ANNEXE
By SRI SIDHIE VINAYAK DEVELOPERS
RG-MH-16414 · RERA P52100025847 · Last updated on MahaRERA portal: 24 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
APPLE REGENCY KP ANNEXE is a Residential / Group Housing project by SRI SIDHIE VINAYAK DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100025847 on 20 Jul 2020. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameAPPLE REGENCY KP ANNEXE
- TypeResidential / Group Housing
- Location
- MUNDHAWA
- Haveli
- Pune
- 411036
- Pincode411036
- RERA no.P52100025847
- ReraGenie IDRG-MH-16414
Builder
- NameSRI SIDHIE VINAYAK DEVELOPERS
- Entity typePartnership
- GSTIN27ADWFS9918A1ZH
- PartnerRAHUL RAMESH PAIGUDE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on20 Jul 2020
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2024)
- Buildings1 building record
- Documents filed105 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| APPLE REGENCY KP ANNEXE | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 70%.
APPLE REGENCY KP ANNEXE: 93% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 24 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 98% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 25% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed117
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SALVI HINGMIRE AND ASSOCIATES |
| Architect | ANKUR ASSOCIATES |
| Architect | TF CUBE |
| Engineer | RAHUL RATHOD |
| Chartered Accountant | R K GARJE |
| Chartered Accountant | KHINVASARA AND ASSOCIATES |
| Chartered Accountant | N P KUMBHAR AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SRI SIDHIE VINAYAK DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir/Madam, We are writing to formally request an extension of the possession date for our ongoing project APPLE REGENCY KP ANNEX, registered under MahaRERA registration number P52100025847. The project is currently 90% complete, and we are in the final stages of development work. The primary reason for this extension request is the additional time required to complete the remaining development work and to obtain the Completion Certificate from the competent authority. We have also received the NOCs required for the completion certificate. We anticipate that an extension till 30/06/2025 wi
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Jul 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed105
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: FORM B - 3103-1 (1).pdf | 24 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - 24032025.pdf | 24 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: KP Developers Bank letter.pdf | 24 Mar 2025 |
| Declaration in FORM BFile: FORM B - 3103-1.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KP Developers FORM 1.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KP FORM 3_compressed.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KP eng FORM 2.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: GetUserDocumentFileContent-1.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: organized.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold_ booked inventory-1.pdf | 22 Nov 2024 |
| Declaration in FORM BFile: Apple Mundhwa - FOrm B March.pdf | 15 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Apple Regency KP - Form 1 Q2.pdf | 15 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Apple Regency KP - FORM 3 Q2.pdf | 15 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 25847 Legal Declaration.pdf | 18 Jul 2024 |
| Details of encumbrances concerned to LegalFile: 25847 Legal Declaration.pdf | 18 Jul 2024 |
| Declaration about Commencement CertificateFile: 25847 CC Declaration.pdf | 18 Jul 2024 |
| Declaration in FORM BFile: 25847 New Form B.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 25847 - Sold Unsold A Wing June 24_compressed.pdf | 18 Jul 2024 |
| CERSAI detailsFile: 25847 CERSAi.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 25847 Form 3 rera AR KP.pdf | 18 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 25847 Rupesh.pdf | 18 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 25847 rahul.pdf | 18 Jul 2024 |
| Proforma of Agreement for saleFile: 2 Proforma of Allotment letter.pdf | 18 Jul 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 25847 Separate Bank.pdf | 18 Jul 2024 |
| Deviation Report with respect to Allotment letterFile: 25847 Allotment.pdf | 18 Jul 2024 |
| Deviation Report with respect to model copy of AgreementFile: 25847 Agreement.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 25847 - Form 1 June 24_compressed.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 25847 - Form 2 June 24.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5_Dev 20-21.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 25847 Form 2A 20-21.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 5_Dev 21-22.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 25847 Form 2A 21-22.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 5_Dev 22-23.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 5_Dev 23-24.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 25847 Form 2A 22-23.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 25847 Form 2A 23-24.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 25847 - Form 3 March 23_compressed.pdf | 17 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 25847 Form 5_Dev 20-21.pdf | 17 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 25847 Form 5_Dev 21-22.pdf | 17 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 25847 Form 5_Dev 22-23.pdf | 17 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 25847 Form 5_Dev 23-24.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Apple Regency KP Annex - Form 1 - Q2 2023-24_compressed.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Apple Regency KP Annex - Form 1 - Q2 2023-24_compressed.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Apple Regency KP Annex - Form 2 - Q2 2023-24_compressed.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: APPLE - KP ANNEX.pdf | 6 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Apple Regency KP Annex - Form 3 - Q1 2023-24_compressed.pdf | 24 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Apple Regency KP Annex - Form 3 - Q2 2023-24_compressed.pdf | 24 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Apple Regency KP Annex - Form 3 - Q3 2023-24_compressed.pdf | 24 Jan 2024 |
| Building plan approvalFile: Scan_4230-01_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-02_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-03 -AREA_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-04_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-05 4th floor_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-06 8th floor_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-07 10 14 Floor_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-08_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-09_compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-10_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-01_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-02_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-03 -AREA_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-04_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-05 4th floor_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-06 8th floor_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-07 10 14 Floor_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-08_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-09_compressed.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_4230-10_compressed.pdf | 26 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate july 22.pdf | 26 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TF architect certificate _compressed.pdf | 26 Sep 2023 |
| Building plan approvalFile: Scan_4230-02_compressed.pdf | 16 Jun 2023 |
| Building plan approvalFile: Scan_4230-03 -AREA_compressed.pdf | 16 Jun 2023 |
| Building plan approvalFile: Scan_4230-04_compressed.pdf | 16 Jun 2023 |
| Building plan approvalFile: Scan_4230-05 4th floor_compressed.pdf | 16 Jun 2023 |
| Building plan approvalFile: Scan_4230-06 8th floor_compressed.pdf | 16 Jun 2023 |
| Building plan approvalFile: Scan_4230-07 10 14 Floor_compressed.pdf | 16 Jun 2023 |
| Building plan approvalFile: Scan_4230-08_compressed.pdf | 16 Jun 2023 |
| Building plan approvalFile: Scan_4230-09_compressed.pdf | 16 Jun 2023 |
| Building plan approvalFile: Scan_4230-10_compressed.pdf | 16 Jun 2023 |
| Layout approvalFile: Scan_4230-01_compressed.pdf | 16 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 105 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep APPLE REGENCY KP ANNEXE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MUNDHAWA13,700+ in Pune
Godrej Aqua Vista
Oxford Realty LLP
Godrej Elaris
Godrej Properties Limited
Sukhwani Hermosa Casa
Sukhwani Associates
Basil Mondale
velx constructions llp
TREMONT D, E AND F WINGS
The Excellaa
ATELIER GREENS
ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADAN
Builder: SRI SIDHIE VINAYAK DEVELOPERS
SRI SIDHIE VINAYAK DEVELOPERS has 1 registration on MahaRERA, including APPLE REGENCY KP ANNEXE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that APPLE REGENCY KP ANNEXE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if APPLE REGENCY KP ANNEXE is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of APPLE REGENCY KP ANNEXE?
The registered promoter entity is SRI SIDHIE VINAYAK DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADWFS9918A1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in APPLE REGENCY KP ANNEXE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for APPLE REGENCY KP ANNEXE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at APPLE REGENCY KP ANNEXE?
The professionals named in the filing: Architect: SALVI HINGMIRE AND ASSOCIATES; Architect: ANKUR ASSOCIATES; Architect: TF CUBE; Engineer: RAHUL RATHOD; Chartered Accountant: R K GARJE; Chartered Accountant: KHINVASARA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in APPLE REGENCY KP ANNEXE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback