Red flags
- Completion date moved by 36 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Aparant Green Home is a Others project by IMAGE DEVELOPERS in Ratnagiri, Maharashtra, registered with MahaRERA as P52800017354 on 7 Aug 2018. The registration is recorded completed; possession was promised by 30 Dec 2025. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameAparant Green Home
- TypeOthers
- Location
- Gavhe
- Konkan
- Dapoli
- Ratnagiri
- 415712
- Pincode415712
- RERA no.P52800017354
- ReraGenie IDRG-MH-34649
Builder
- NameIMAGE DEVELOPERS
- Entity typePartnership
- PartnersSAHIL RAVINDRA KSHIRSAGAR, MOHIT RAVINDRA KSHIRSAGAR
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Aug 2018
- Promised completion30 Dec 2025
- Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2022)
- Buildings61 building records
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROW HOUSE NO 1 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 2 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 3 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 4 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 5 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 6 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 7 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 8 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 9 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 10 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 11 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 12 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 13 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 14 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 15 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 16 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 17 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 18 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 19 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 20 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 21 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 22 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 23 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 24 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 25 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 26 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 27 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 28 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 29 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 30 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 31 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 32 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 33 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 34 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 35 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 36 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 37 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 38 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 39 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 40 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 41 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 42 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 43 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 44 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 45 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 46 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 47 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 48 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 49 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 50 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 51 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 52 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 53 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 54 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 55 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 56 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 57 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 58 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 59 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 60 | NA | 2 | 0 | 0 | 0 | 0 |
| Hotel Sadhana Executive | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 30 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 61 buildings; the table lists the first 20.
375 of 671 construction stages are filed complete across 61 buildings. The stage furthest along is Podiums (if any), at 0%.
ROW HOUSE NO 191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 791%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 891%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1091%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1764%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1891%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 1964%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2064%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 30 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| LAND DEVELOPMENT | Yes | 100% |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| ROW HOUSE NO 1 | 1 | 1 |
| ROW HOUSE NO 2 | 1 | 1 |
| ROW HOUSE NO 3 | 1 | 1 |
| ROW HOUSE NO 4 | 1 | 1 |
| ROW HOUSE NO 5 | 1 | 1 |
| ROW HOUSE NO 6 | 1 | 1 |
| ROW HOUSE NO 7 | 1 | 1 |
| ROW HOUSE NO 8 | 1 | 1 |
| ROW HOUSE NO 9 | 1 | 1 |
| ROW HOUSE NO 10 | 1 | 1 |
| ROW HOUSE NO 11 | 1 | 1 |
| ROW HOUSE NO 12 | 1 | 1 |
| ROW HOUSE NO 13 | 1 | 1 |
| ROW HOUSE NO 14 | 1 | 1 |
| ROW HOUSE NO 15 | 1 | 1 |
| ROW HOUSE NO 16 | 1 | 1 |
| ROW HOUSE NO 17 | 1 | 1 |
| ROW HOUSE NO 18 | 1 | 1 |
| ROW HOUSE NO 19 | 1 | 1 |
| ROW HOUSE NO 20 | 1 | 1 |
| ROW HOUSE NO 21 | 1 | 1 |
| ROW HOUSE NO 22 | 1 | 1 |
| ROW HOUSE NO 23 | 1 | 1 |
| ROW HOUSE NO 24 | 1 | 1 |
| ROW HOUSE NO 25 | 1 | 1 |
| ROW HOUSE NO 26 | 1 | 1 |
| ROW HOUSE NO 27 | 1 | 1 |
| ROW HOUSE NO 28 | 1 | 1 |
| ROW HOUSE NO 29 | 1 | 1 |
| ROW HOUSE NO 30 | 1 | 1 |
| ROW HOUSE NO 31 | 1 | 1 |
| ROW HOUSE NO 32 | 1 | 1 |
| ROW HOUSE NO 33 | 1 | 1 |
| ROW HOUSE NO 34 | 1 | 1 |
| ROW HOUSE NO 35 | 1 | 1 |
| ROW HOUSE NO 36 | 1 | 1 |
| ROW HOUSE NO 37 | 1 | 1 |
| ROW HOUSE NO 38 | 1 | 1 |
| ROW HOUSE NO 39 | 1 | 1 |
| ROW HOUSE NO 40 | 1 | 1 |
| ROW HOUSE NO 41 | 1 | 1 |
| ROW HOUSE NO 42 | 1 | 1 |
| ROW HOUSE NO 43 | 1 | 1 |
| ROW HOUSE NO 44 | 1 | 1 |
| ROW HOUSE NO 45 | 1 | 1 |
| ROW HOUSE NO 46 | 1 | 1 |
| ROW HOUSE NO 47 | 1 | 1 |
| ROW HOUSE NO 48 | 1 | 1 |
| ROW HOUSE NO 49 | 1 | 1 |
| ROW HOUSE NO 50 | 1 | 1 |
| ROW HOUSE NO 51 | 1 | 1 |
| ROW HOUSE NO 52 | 1 | 1 |
| ROW HOUSE NO 53 | 1 | 1 |
| ROW HOUSE NO 54 | 1 | 1 |
| ROW HOUSE NO 55 | 1 | 1 |
| ROW HOUSE NO 56 | 1 | 1 |
| ROW HOUSE NO 57 | 1 | 1 |
| ROW HOUSE NO 58 | 1 | 1 |
| ROW HOUSE NO 59 | 1 | 1 |
| ROW HOUSE NO 60 | 1 | 1 |
| Hotel Sadhana Executive | 14 | 14 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHIRISH GHORPADE |
| Partner | Role in project |
|---|---|
| IMAGE DEVELOPERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe were unable to complete the project within original due date due to non-availability of building material and lockdown imposed due to covid-19 pandemic situation.
Reason as filed by the promoterWe were unable to complete the project within original due date due to non-availability of building material and slack market.
Reason as filed by the promoterWe were unable to complete the project within original due date due to non-availability of building material and slack market.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Apr 2025
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventary.pdf | 30 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate 3 Final.pdf | 16 Apr 2025 |
| Other - LegalFile: Consent Letter.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 20 Mar 2025 |
| Certificates of CA (Form 3)File: CA Certificates.pdf | 20 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 20 Mar 2025 |
| Other - LegalFile: Consent Letter.pdf | 20 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventary.pdf | 20 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 20 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 20 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 19 Mar 2025 |
| Certificates of CA (Form 3)File: CA Certificates.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 19 Mar 2025 |
| Other - LegalFile: Consent Letter.pdf | 19 Mar 2025 |
| Other - LegalFile: APPLICATION FOR EXTENDION OF PROJECT COMPLETION DATE U.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventary.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 19 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 1 Feb 2025 |
| Certificates of CA (Form 3)File: CA Certificates.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 1 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventary.pdf | 1 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate.pdf | 1 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 1 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 1 Feb 2025 |
| Certificates of CA (Form 3)File: CA Certificates.pdf | 16 Feb 2024 |
| Declaration about Commencement CertificateFile: Occupancy Certificate 1.pdf | 14 Feb 2024 |
| Other - LegalFile: consent letter.pdf | 8 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 30 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf | 4 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 4 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 4 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure sold unsold inventary.pdf | 4 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Certificates of CA.pdf | 4 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certificates of CA.pdf | 4 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificates of CA.pdf | 4 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Certificates of CA.pdf | 4 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Certificates of CA.pdf | 4 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc old.pdf | 4 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC New.pdf | 4 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Certificates of CA.pdf | 3 Jan 2024 |
| Declaration about Commencement CertificateFile: OC New.pdf | 2 Jan 2024 |
| Declaration in FORM BFile: Form B.pdf | 2 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 2 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 2 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 2 Jan 2024 |
| Certificates of CA (Form 3)File: Certificates of CA.pdf | 2 Jan 2024 |
| Other - LegalFile: APPLICATION FOR EXTENDION OF PROJECT COMPLETION DATE U.pdf | 2 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCES CERTIFICATE.pdf | 27 Jan 2023 |
| Details of encumbrances concerned to LegalFile: NON ENCUMBRANCES CERTIFICATE.pdf | 27 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 27 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Statement.pdf | 27 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrances Certificate.pdf | 25 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCES CERTIFICATE.pdf | 25 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Non Encumbrances Certificate.pdf | 25 Jan 2023 |
| Details of encumbrances concerned to LegalFile: NON ENCUMBRANCES CERTIFICATE.pdf | 25 Jan 2023 |
| Declaration about Commencement CertificateFile: NA Order New.pdf | 25 Jan 2023 |
| Proforma of Agreement for saleFile: Draft.pdf | 25 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotement Letter.pdf | 25 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation model copy of agreement.pdf | 25 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Organizations.pdf | 24 Jan 2023 |
| PAN CardFile: Image developers PAN.pdf | 16 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 1 Aug 2018 |
| Declaration in FORM BFile: New Form B.pdf | 1 Aug 2018 |
| Building plan approvalFile: Image Developer - Layout.pdf | 24 Jul 2018 |
| Layout approvalFile: Old Layout Certifcate.pdf | 24 Jul 2018 |
| Copy of the legal title reportFile: Legal Opinion13072018.pdf | 24 Jul 2018 |
| Details of encumbrancesFile: document.pdf | 24 Jul 2018 |
| Copy of Layout Approval (in case of layout)File: Old Layout Certifcate.pdf | 24 Jul 2018 |
| Building Plan Approval (IOD)File: Image Developer - Layout.pdf | 24 Jul 2018 |
| Certificates of CA (Form 3)File: C A Certificate.pdf | 24 Jul 2018 |
| Proforma of Allotment letterFile: document(1).pdf | 24 Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 74 filed documents as one ZIP, foldered, with a manifest
Keep Aparant Green Home on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Konkan1,100+ in Ratnagiri
KONKAN TRAILS LIFESPACE
KONKANTRAILSLIFESPACELLP
Cape of Bliss Phase 1A
HOABL Management LLP
VIAA VISION
VIAA VISION
COASTAL BREEZE
UNIVERSAL PROPERTIES
VRUNDAVAN
EMPIRE REALTORS AND DEVELOPERS
Cape of Bliss Phase I
Lodha Management LLP
See every Ratnagiri project, with the district possession charts
Builder: IMAGE DEVELOPERS
IMAGE DEVELOPERS has 1 registration on MahaRERA, including Aparant Green Home. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What are my rights if Aparant Green Home is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Aparant Green Home?
The registered promoter entity is IMAGE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Aparant Green Home?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Aparant Green Home?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Aparant Green Home?
The professionals named in the filing: Architect: SHIRISH GHORPADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aparant Green Home?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback