Home / Browse projects / Ratnagiri, Maharashtra / Aparant Green Home

Completed No litigation declared Others project

Aparant Green Home

By IMAGE DEVELOPERS

RG-MH-34649 · RERA P52800017354 · Last updated on MahaRERA portal: 30 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
375 of 671Construction stages doneacross 61 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Aparant Green Home is a Others project by IMAGE DEVELOPERS in Ratnagiri, Maharashtra, registered with MahaRERA as P52800017354 on 7 Aug 2018. The registration is recorded completed; possession was promised by 30 Dec 2025. The completion date has moved by 36 months from the original filing.

At a glance

Project

  • NameAparant Green Home
  • TypeOthers
  • Location
    • Gavhe
    • Konkan
    • Dapoli
    • Ratnagiri
    • 415712
  • Pincode415712
  • RERA no.P52800017354
  • ReraGenie IDRG-MH-34649

Builder

  • NameIMAGE DEVELOPERS
  • Entity typePartnership
  • PartnersSAHIL RAVINDRA KSHIRSAGAR, MOHIT RAVINDRA KSHIRSAGAR

Key dates

this monthRegisteredAug 2018First promiseDec 2022Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2018
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2022)
  • Buildings61 building records
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE NO 1NA20000
ROW HOUSE NO 2NA20000
ROW HOUSE NO 3NA20000
ROW HOUSE NO 4NA20000
ROW HOUSE NO 5NA20000
ROW HOUSE NO 6NA20000
ROW HOUSE NO 7NA20000
ROW HOUSE NO 8NA20000
ROW HOUSE NO 9NA20000
ROW HOUSE NO 10NA20000
ROW HOUSE NO 11NA20000
ROW HOUSE NO 12NA20000
ROW HOUSE NO 13NA20000
ROW HOUSE NO 14NA20000
ROW HOUSE NO 15NA20000
ROW HOUSE NO 16NA20000
ROW HOUSE NO 17NA20000
ROW HOUSE NO 18NA20000
ROW HOUSE NO 19NA20000
ROW HOUSE NO 20NA20000
ROW HOUSE NO 21NA20000
ROW HOUSE NO 22NA20000
ROW HOUSE NO 23NA20000
ROW HOUSE NO 24NA20000
ROW HOUSE NO 25NA20000
ROW HOUSE NO 26NA20000
ROW HOUSE NO 27NA20000
ROW HOUSE NO 28NA20000
ROW HOUSE NO 29NA20000
ROW HOUSE NO 30NA20000
ROW HOUSE NO 31NA20000
ROW HOUSE NO 32NA20000
ROW HOUSE NO 33NA20000
ROW HOUSE NO 34NA20000
ROW HOUSE NO 35NA20000
ROW HOUSE NO 36NA20000
ROW HOUSE NO 37NA20000
ROW HOUSE NO 38NA20000
ROW HOUSE NO 39NA20000
ROW HOUSE NO 40NA20000
ROW HOUSE NO 41NA20000
ROW HOUSE NO 42NA20000
ROW HOUSE NO 43NA20000
ROW HOUSE NO 44NA30000
ROW HOUSE NO 45NA20000
ROW HOUSE NO 46NA20000
ROW HOUSE NO 47NA20000
ROW HOUSE NO 48NA20000
ROW HOUSE NO 49NA20000
ROW HOUSE NO 50NA20000
ROW HOUSE NO 51NA20000
ROW HOUSE NO 52NA20000
ROW HOUSE NO 53NA20000
ROW HOUSE NO 54NA20000
ROW HOUSE NO 55NA20000
ROW HOUSE NO 56NA20000
ROW HOUSE NO 57NA20000
ROW HOUSE NO 58NA20000
ROW HOUSE NO 59NA20000
ROW HOUSE NO 60NA20000
Hotel Sadhana ExecutiveNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 30 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 61 buildings; the table lists the first 20.

375 of 671 construction stages are filed complete across 61 buildings. The stage furthest along is Podiums (if any), at 0%.

ROW HOUSE NO 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1091%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1764%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 1891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 1964%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 2064%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 30 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
LAND DEVELOPMENTYes100%

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Open Space74
BuildingOpen SpaceTotal
ROW HOUSE NO 111
ROW HOUSE NO 211
ROW HOUSE NO 311
ROW HOUSE NO 411
ROW HOUSE NO 511
ROW HOUSE NO 611
ROW HOUSE NO 711
ROW HOUSE NO 811
ROW HOUSE NO 911
ROW HOUSE NO 1011
ROW HOUSE NO 1111
ROW HOUSE NO 1211
ROW HOUSE NO 1311
ROW HOUSE NO 1411
ROW HOUSE NO 1511
ROW HOUSE NO 1611
ROW HOUSE NO 1711
ROW HOUSE NO 1811
ROW HOUSE NO 1911
ROW HOUSE NO 2011
ROW HOUSE NO 2111
ROW HOUSE NO 2211
ROW HOUSE NO 2311
ROW HOUSE NO 2411
ROW HOUSE NO 2511
ROW HOUSE NO 2611
ROW HOUSE NO 2711
ROW HOUSE NO 2811
ROW HOUSE NO 2911
ROW HOUSE NO 3011
ROW HOUSE NO 3111
ROW HOUSE NO 3211
ROW HOUSE NO 3311
ROW HOUSE NO 3411
ROW HOUSE NO 3511
ROW HOUSE NO 3611
ROW HOUSE NO 3711
ROW HOUSE NO 3811
ROW HOUSE NO 3911
ROW HOUSE NO 4011
ROW HOUSE NO 4111
ROW HOUSE NO 4211
ROW HOUSE NO 4311
ROW HOUSE NO 4411
ROW HOUSE NO 4511
ROW HOUSE NO 4611
ROW HOUSE NO 4711
ROW HOUSE NO 4811
ROW HOUSE NO 4911
ROW HOUSE NO 5011
ROW HOUSE NO 5111
ROW HOUSE NO 5211
ROW HOUSE NO 5311
ROW HOUSE NO 5411
ROW HOUSE NO 5511
ROW HOUSE NO 5611
ROW HOUSE NO 5711
ROW HOUSE NO 5811
ROW HOUSE NO 5911
ROW HOUSE NO 6011
Hotel Sadhana Executive1414

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,400 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6682.57
Proposed, not sanctioned6,682 sq m
Buildings approved61
Buildings sanctioned61

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFamily mal Dapoli

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHIRISH GHORPADE
PartnerRole in project
IMAGE DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52800013381Dec 2022 → Dec 2023

Reason as filed by the promoterWe were unable to complete the project within original due date due to non-availability of building material and lockdown imposed due to covid-19 pandemic situation.

EXT52800018520Dec 2022 → Dec 2024

Reason as filed by the promoterWe were unable to complete the project within original due date due to non-availability of building material and slack market.

EXT52800027885Dec 2022 → Dec 2025

Reason as filed by the promoterWe were unable to complete the project within original due date due to non-availability of building material and slack market.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Apr 2025

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventary.pdf30 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate 3 Final.pdf16 Apr 2025
Other - LegalFile: Consent Letter.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Mar 2025
Certificates of CA (Form 3)File: CA Certificates.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Mar 2025
Other - LegalFile: Consent Letter.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventary.pdf20 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf20 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf20 Mar 2025
Declaration in FORM BFile: Form B.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 Mar 2025
Certificates of CA (Form 3)File: CA Certificates.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 Mar 2025
Other - LegalFile: Consent Letter.pdf19 Mar 2025
Other - LegalFile: APPLICATION FOR EXTENDION OF PROJECT COMPLETION DATE U.pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventary.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf19 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf19 Mar 2025
Declaration in FORM BFile: Form B.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf1 Feb 2025
Certificates of CA (Form 3)File: CA Certificates.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventary.pdf1 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate.pdf1 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf1 Feb 2025
Certificates of CA (Form 3)File: CA Certificates.pdf16 Feb 2024
Declaration about Commencement CertificateFile: Occupancy Certificate 1.pdf14 Feb 2024
Other - LegalFile: consent letter.pdf8 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf30 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf4 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf4 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf4 Jan 2024
Disclosure of sold/ booked inventoryFile: disclosure sold unsold inventary.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Certificates of CA.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certificates of CA.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificates of CA.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Certificates of CA.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Certificates of CA.pdf4 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc old.pdf4 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC New.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Certificates of CA.pdf3 Jan 2024
Declaration about Commencement CertificateFile: OC New.pdf2 Jan 2024
Declaration in FORM BFile: Form B.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf2 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf2 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf2 Jan 2024
Certificates of CA (Form 3)File: Certificates of CA.pdf2 Jan 2024
Other - LegalFile: APPLICATION FOR EXTENDION OF PROJECT COMPLETION DATE U.pdf2 Jan 2024
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCES CERTIFICATE.pdf27 Jan 2023
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCES CERTIFICATE.pdf27 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf27 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Statement.pdf27 Jan 2023
Details of encumbrances concerned to FinanceFile: Non Encumbrances Certificate.pdf25 Jan 2023
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCES CERTIFICATE.pdf25 Jan 2023
Details of encumbrances concerned to LegalFile: Non Encumbrances Certificate.pdf25 Jan 2023
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCES CERTIFICATE.pdf25 Jan 2023
Declaration about Commencement CertificateFile: NA Order New.pdf25 Jan 2023
Proforma of Agreement for saleFile: Draft.pdf25 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotement Letter.pdf25 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation model copy of agreement.pdf25 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Organizations.pdf24 Jan 2023
PAN CardFile: Image developers PAN.pdf16 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf1 Aug 2018
Declaration in FORM BFile: New Form B.pdf1 Aug 2018
Building plan approvalFile: Image Developer - Layout.pdf24 Jul 2018
Layout approvalFile: Old Layout Certifcate.pdf24 Jul 2018
Copy of the legal title reportFile: Legal Opinion13072018.pdf24 Jul 2018
Details of encumbrancesFile: document.pdf24 Jul 2018
Copy of Layout Approval (in case of layout)File: Old Layout Certifcate.pdf24 Jul 2018
Building Plan Approval (IOD)File: Image Developer - Layout.pdf24 Jul 2018
Certificates of CA (Form 3)File: C A Certificate.pdf24 Jul 2018
Proforma of Allotment letterFile: document(1).pdf24 Jul 2018

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one moved by 36 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Aparant Green Home on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Konkan1,100+ in Ratnagiri

Builder: IMAGE DEVELOPERS

IMAGE DEVELOPERS has 1 registration on MahaRERA, including Aparant Green Home. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Aparant Green Home is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aparant Green Home?

The registered promoter entity is IMAGE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aparant Green Home?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aparant Green Home?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aparant Green Home?

The professionals named in the filing: Architect: SHIRISH GHORPADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aparant Green Home?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aparant Green Home. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aparant Green Home to a free account