Home / Browse projects / Mumbai City, Maharashtra / Anzar Residency

Registered No litigation declared Residential / Group Housing project

Anzar Residency

By MITHILA DEVELOPERS

RG-MH-40994 · RERA P51900012009 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 84 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 84 months from the original
6 of 11Construction stages donefurthest along: Basement (if any), 95%
64 of 64Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Anzar Residency is a Residential / Group Housing project by MITHILA DEVELOPERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900012009 on 1 Sep 2017. Possession is promised by 30 Dec 2028. The completion date has moved by 84 months from the original filing. 0 of the 64 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAnzar Residency
  • TypeResidential / Group Housing
  • Location
    • Agripada West Estate
    • Mumbai City
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900012009
  • ReraGenie IDRG-MH-40994

Builder

  • NameMITHILA DEVELOPERS
  • Entity typePartnership
  • PartnersANWAR AHMED SHAIKH, SHAHNAWAZ AHMED SHAIKH, SHAHBAZ AHMED SHAIKH

Key dates

this monthRegisteredSep 2017First promiseDec 2021Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2028
  • Revised completionRevised to 30 Dec 2028 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed104 files

Current status

0%0 of 64 units booked
50.4%Work done, per cost certificate

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANZAR RESIDENCYNA231662264

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

ANZAR RESIDENCY: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Closed/Covered66

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area937 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 May 2026

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation
Permissible FSI4657.5
Proposed, not sanctioned4,657 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAGAR CLASSIC, 64 MIRZA GHALIB MARG, BYCULLA, MUMBAI 400008
Estimated costRs 55.60 cr
Cost incurredRs 28.04 cr
Work done50.44%
BuildingWingEstimatedIncurred
ANZAR RESIDENCYNARs 55.60 crRs 28.04 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectaman & associates
ArchitectFuture Associates
EngineerAbdul Qavi Khatri
EngineerNitin Jadhav
Chartered AccountantDNA and Associates
Chartered AccountantP P Maloo & Associates
Chartered AccountantNehal Mitul Faria
PartnerRole in project
MITHILA DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900012128Dec 2021 → Dec 2022

Reason as filed by the promoterDue to Covid Issue the Project could not get completed hence we are requesting you that kindly provide us the extention of on the project.

EA06052620846Dec 2021 → Dec 2028

Reason as filed by the promotera. The progress of the project was significantly impacted by a series of unforeseen challenges, primarily arising from the COVID-19 pandemic and its aftermath. Between March 2020 and February 2022, construction activities were severely disrupted due to nationwide lockdowns, movement restrictions, and mandatory safety measures. These conditions led to acute shortages of skilled and unskilled labour, disruptions in the supply chain for essential materials and equipment, and prolonged periods of inactivity on site. Despite these obstacles, the developer made continuous efforts to sustain limited

Litigation declared1

CaseCourtStatus
700/2017/2017high court bombaypending

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502683Lavinha Sneha RosarioMITHILA DEVELOPERS01/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf13 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf13 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf26 Jun 2026
Building plan approvalFile: Hawa Manzil Plan -1-2.pdf23 Jun 2026
Building plan approvalFile: Hawa Manzil Plan -3-4.pdf23 Jun 2026
Building plan approvalFile: Hawa Manzil Plan -5-6.pdf23 Jun 2026
Building plan approvalFile: Hawa Manzil Plan -7-7.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 31-03-26.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 31-03-26.pdf23 Jun 2026
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY Anzar 12122024 -1.pdf13 Dec 2024
Proforma of Agreement for saleFile: RERA Flat Sale Agreement.pdf13 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: July to Sept-2024.pdf11 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: April to June -2024.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 9122024.pdf11 Dec 2024
Declaration in FORM BFile: FORM-B Developer-1.pdf10 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: July to Sept-2023.pdf10 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Jan to Mar-2024.pdf10 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: July to Sept-2023.pdf10 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: April to June -2023.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: C_C_ revalidation letter 2024-25-1.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000042.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000055.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000054.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000053.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000052.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000051.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000050.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000048.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000047.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000046.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000045.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000044.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000043.pdf5 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CCF_000049.pdf5 Dec 2024
Other - TechnicalFile: ANZAR LETTER TO RERA 51224.pdf5 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - July to Sept 2021.pdf27 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - April to June 2021.pdf27 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A Engineer's Certificate for Quality Assurance 23-24.pdf19 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - July to Sept 2022.pdf18 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - April to Sept 2021.pdf18 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - Jan to March 2022.pdf13 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - Jan to March 2023.pdf13 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - Oct to Dec 2022.pdf13 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - Oct to Dec 2021.pdf13 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 - April to June 2022.pdf12 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form -2 - Jan to March 2022.pdf12 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2017-2018.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2018-2019.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-2020.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-2021.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: mithila form 1 2019-20_compressed.pdf29 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: mithila form 1 2020-21_compressed.pdf29 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Anzar 2022-23.pdf3 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A Engineer's Certificate for Quality Assurance .pdf27 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A Engineer's Certificate for Quality Assurance 22-23.pdf27 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A Engineer's Certificate for Quality Assurance 23-24.pdf27 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera architect certificate 2023 2024.pdf21 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: namla quality assurance letter.pdf27 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed form 5 march 22_compressed.pdf28 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: signed form 5 march 21-Compressed.pdf23 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A-2019-20.pdf22 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A-2020-21.pdf22 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5-2017-18.pdf22 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5-2018-19.pdf22 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5-2019-20.pdf22 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Apr 2018
Building plan approvalFile: 1.pdf30 Jul 2017
Layout approvalFile: 2.pdf30 Jul 2017
Layout approvalFile: 1.pdf30 Jul 2017
Layout approvalFile: 3.pdf30 Jul 2017

How this compares with Mumbai City

0%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 84 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anzar Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai City780+ in Mumbai City

2 kmAnzar ResidencyCompleted 19Lapsed / revoked 41Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 160 registered projects within 2 km.

Builder: MITHILA DEVELOPERS

MITHILA DEVELOPERS has 1 registration on MahaRERA, including Anzar Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Anzar Residency is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anzar Residency?

The registered promoter entity is MITHILA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anzar Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Anzar Residency?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Anzar Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anzar Residency?

The professionals named in the filing: Architect: aman & associates; Architect: Future Associates; Engineer: Abdul Qavi Khatri; Engineer: Nitin Jadhav; Chartered Accountant: DNA and Associates; Chartered Accountant: P P Maloo & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anzar Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anzar Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anzar Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.