Home / Browse projects / Mumbai Suburban, Maharashtra / ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED

Completed No litigation declared Others project

ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED

By SAMARPAN HOMES & DEVELOPERS

RG-MH-34421 · RERA P51800046877 · Last updated on MahaRERA portal: 19 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED is a Others project by SAMARPAN HOMES & DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046877 on 16 Sep 2022. The registration is recorded completed; possession was promised by 30 Sep 2025.

At a glance

Project

  • NameANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED
  • TypeOthers
  • Location
    • KASTURBA CROSS ROAD NO 5
    • BORIVALI EAST
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • RERA no.P51800046877
  • ReraGenie IDRG-MH-34421

Builder

  • NameSAMARPAN HOMES & DEVELOPERS
  • Entity typePartnership
  • GSTIN27ADIFS1401J1Z6
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRAMILA RAMESH JAIN, KAPIL RAMESH JAIN
  • Other registrations12 more →
  • Completed4 of 13
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2022PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Sep 2022
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITEDNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,220 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ANURAJ CO-OPERATIVE HOUSING SOCIETY LTDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3951.18
Proposed, not sanctioned2,929 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHari Om Plaza M G Road Borivali East Mumbai 400066

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHAMUNDA DESIGNERS
EngineerBHIMRAO CHANDOJI SARPATE
Chartered AccountantNEHALI AND CO
PartnerRole in project
SAMARPAN HOMES & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Feb 2025

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engg Anuraj Dec-24.pdf17 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Anuraj OC.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 CA Anuraj Dec-24 (1).pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA 09 24.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Engg 09 24.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Anuraj july to sep 24.pdf14 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 july to sep 24.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Anuraj april to june 24.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architech Anuraj.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Form 2 -Anuraj.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Mach 2024 Anuraj_compressed.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A ( Anuraj Vihar ).pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A ( Hiranmay Niwas ).pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A ( Anuraj Vihar ).pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anuraj Rera Certificate form 3.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf14 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_compressed.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 anuraj_compressed.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng 2 Sept 2022 Anuraj (1).pdf4 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anurajchs CA Sept 2022 (1).pdf4 Nov 2022
Proforma of Allotment letterFile: ANURAJ AGREEMENT FOR SALE.pdf29 Sep 2022
CERSAI detailsFile: CERSAI_Search_Report_200246706785_For_Asset_Based_Search_08_09_2022_17_43_18_470.pdf8 Sep 2022
Proforma of Allotment letterFile: ALLOTMENT.pdf3 Sep 2022
Proforma of Allotment letterFile: AGREEMENT.pdf3 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A ANURAJ SOCIETY RERA.pdf3 Sep 2022
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT SALE ANURAJ SOCIETY.pdf3 Sep 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AGREEMENT ANURAJ SCOIETY.pdf3 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Anuraj (1).pdf22 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf22 Aug 2022
Building plan approvalFile: IOD PAGE 1 TO 10 PAGE.pdf8 Aug 2022
Layout approvalFile: 1.pdf8 Aug 2022
Layout approvalFile: 2.pdf8 Aug 2022
Layout approvalFile: 3.pdf8 Aug 2022
Layout approvalFile: 4.pdf8 Aug 2022
Layout approvalFile: 5.pdf8 Aug 2022
Layout approvalFile: 6.pdf8 Aug 2022
Layout approvalFile: 7.pdf8 Aug 2022
PAN CardFile: COMPANY PAN CARD.pdf8 Aug 2022
Copy of the legal title reportFile: 05 Title Certificate.pdf8 Aug 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Anuraj.pdf8 Aug 2022
Details of encumbrances concerned to LegalFile: No Encumbrance Anuraj.pdf8 Aug 2022
Copy of Layout Approval (in case of layout)File: 1.pdf8 Aug 2022
Copy of Layout Approval (in case of layout)File: 2.pdf8 Aug 2022
Copy of Layout Approval (in case of layout)File: 3.pdf8 Aug 2022
Copy of Layout Approval (in case of layout)File: 4.pdf8 Aug 2022
Copy of Layout Approval (in case of layout)File: 5.pdf8 Aug 2022
Copy of Layout Approval (in case of layout)File: 6.pdf8 Aug 2022
Copy of Layout Approval (in case of layout)File: 7.pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD PAGE 1 TO 10 PAGE.pdf8 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: 07 CC -Anuraj CHS.pdf8 Aug 2022
Declaration about Commencement CertificateFile: Declaration CC.pdf8 Aug 2022
Declaration in FORM BFile: 10 Form B Promotor Anuraj.pdf8 Aug 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
OM SHRI JAGANNATH CHSLP51800054351BORIVALI (W), Mumbai Suburban74Jan 2024OngoingDec 2026Registered original: Mar 2026Not due yet
GOLDMIST CO-OPERATIVE HOUSING SOCIETY LIMITEDP51800054965KANDIVALI (EAST), Mumbai Suburban93Feb 2024OngoingDec 2026Not due yet
ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2P51800055685BORIVALI (EAST), Mumbai Suburban140Apr 2024OngoingDec 2026Not due yet

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI EAST6,700+ in Mumbai Suburban

Builder: SAMARPAN HOMES & DEVELOPERS

SAMARPAN HOMES & DEVELOPERS has 13 registrations on MahaRERA, including BORIVALI OM APARTMENT CO-OP HSG SOCIETY LTD and RAM DUTT CO-OPERATIVE HOUSING SOCIETY LTD. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED?

The registered promoter entity is SAMARPAN HOMES & DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADIFS1401J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED?

The professionals named in the filing: Architect: CHAMUNDA DESIGNERS; Engineer: BHIMRAO CHANDOJI SARPATE; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANURAJ CO-OPERATIVE HOUSING SOCIETY LIMITED to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.