ANTARA

By SANRAJ REALTY

RG-MH-09663 · RERA P52100000698 · Last updated on MahaRERA portal: 10 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
28 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 85%
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

ANTARA is a Others project by SANRAJ REALTY in Pune, Maharashtra, registered with MahaRERA as P52100000698 on 20 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameANTARA
  • TypeOthers
  • Location
    • Katraj Kondhwa Road
    • Yewalewadi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000698
  • ReraGenie IDRG-MH-09663

Builder

  • NameSANRAJ REALTY
  • Entity typePartnership
  • PartnersANAND DAYANAND AGARWAL, YOGESH RAJ DOUGALL, SHEETAL SUBHASH BAFNA, YOGESH NARSING WABLE, HARESH GHANSHAMDAS DODWANI, NARESH DOULTRAM CHAINANI, SANJAY SHARDHANAND TYAGI

Key dates

this monthRegisteredJul 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Jul 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed108 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B BUILDINGNA90000
C BUILDINGNA90000
A BUILIDNGNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 10 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.

B BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A BUILIDNG80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed136

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots136
Closed/Covered71
Open Space65
BuildingClosed/CoveredOpen SpaceTotal
B BUILDING321648
C BUILDING231740
A BUILIDNG163248

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11089.0
Proposed, not sanctioned11,089 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDECCAN GYMKHANA, PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRIMS DESIGN STUDIO
EngineerG A BHILARE CONSULTANTS PVT LTD
PartnerRole in project
SANRAJ REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Sep 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Apr 2023

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A Wing Completion - Part.pdf10 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A Wing Shop Completion.pdf10 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A Wing Completion Full.pdf10 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Antara Architect.pdf9 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Antara Engr Form.pdf9 Jul 2022
Disclosure of sold/ booked inventoryFile: Antara Sales Data 1.pdf9 Jul 2022
Disclosure of sold/ booked inventoryFile: Antara Sales Data 2.pdf9 Jul 2022
OtherFile: Antara Self Declaration.pdf9 Jul 2022
Details of encumbrancesFile: Antara Emcrumbances.pdf13 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct Antara.pdf5 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Antara Engr.pdf5 Apr 2022
Disclosure of sold/ booked inventoryFile: Antara Sales.pdf5 Apr 2022
Disclosure of sold/ booked inventoryFile: Antara Sales1.pdf5 Apr 2022
OtherFile: Antara Self Declaration.pdf5 Apr 2022
OtherFile: Antara Self Declaration.pdf12 Jan 2022
Declaration in FORM BFile: Antara Emcrumbances.pdf11 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct Antara.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engr Antara compressed.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Sales Antara A.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Sales Antara BC.pdf7 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shops OC.pdf7 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC B bldg 53 C bldg 56 flats.pdf7 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC B bldg 3 flats club house.pdf7 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate.pdf7 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct Antara.pdf8 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engr Antara ok.pdf8 Oct 2021
OtherFile: Antara Self Declaration.pdf8 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct Antara.pdf7 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Antara Engr.pdf7 Jul 2021
OtherFile: Sanraj Realty Self Declaration.pdf7 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct Sunraj.pdf9 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engr Sunraj.pdf9 Apr 2021
OtherFile: Selfdeclaration Sunraj.pdf9 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Antara Arct.pdf4 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Antara Engr.pdf4 Jan 2021
OtherFile: Antara Undertaking.pdf4 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Antara.pdf8 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanraj Engr Quality.pdf8 Oct 2020
OtherFile: sanraj declaraion.pdf8 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Antara Architect min.pdf3 Jul 2020
OtherFile: Sanraj Undertaking.pdf3 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc cert Antara.pdf9 Jan 2020
Form 2AFile: Form 2A Antara.pdf9 Jan 2020
OtherFile: Self Dec Antara.pdf9 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Antara Arc Cert.pdf17 Oct 2019
Form 2AFile: Antara form 2A.pdf17 Oct 2019
OtherFile: Antara self dec form.pdf17 Oct 2019
Certificates of CA (Form 5)File: FORM 5 SANRAJ.pdf30 Sep 2019
OtherFile: Antara Self Decl form.pdf10 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Antara Arc Cert.pdf9 Jul 2019
Form 2AFile: Antara Quality Cert.pdf9 Jul 2019
Form 2AFile: antara eng form.pdf8 Apr 2019
OtherFile: antara Self Dec.pdf8 Apr 2019
Form 2AFile: Antara Quality Cert.pdf6 Jan 2019
OtherFile: Antara.pdf6 Jan 2019
Certificates of CA (Form 5)File: ilovepdf_jpg_to_pdf.pdf30 Sep 2018
OtherFile: U SANRAJ.pdf30 Sep 2018
Layout approvalFile: 1.pdf3 Sep 2018
Building plan approvalFile: 2.pdf3 Sep 2018
Building plan approvalFile: 3.pdf3 Sep 2018
Building plan approvalFile: 4.pdf3 Sep 2018
Building plan approvalFile: 5.pdf3 Sep 2018
Copy of Layout Approval (in case of layout)File: 1.pdf3 Sep 2018
Building Plan Approval (IOD)File: 2.pdf3 Sep 2018
Building Plan Approval (IOD)File: 3.pdf3 Sep 2018
Building Plan Approval (IOD)File: 4.pdf3 Sep 2018
Building Plan Approval (IOD)File: 5.pdf3 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf3 Sep 2018
OtherFile: Sanraj.pdf6 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Antara.pdf8 Apr 2018
OtherFile: Antara.pdf8 Apr 2018
OtherFile: RERA Self dec Antara.pdf10 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANTARA Architect Cert.pdf11 Oct 2017
OtherFile: Sanraj realty.pdf11 Oct 2017
Building plan approvalFile: 1 reduced size.pdf15 Jul 2017
Building plan approvalFile: 2 reduced size.pdf15 Jul 2017
Building plan approvalFile: 3 reduced size.pdf15 Jul 2017
Building plan approvalFile: 4 reduced size.pdf15 Jul 2017
Building plan approvalFile: 5 reduced size.pdf15 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANTARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yewalewadi13,700+ in Pune

2 kmANTARACompleted 44Lapsed / revoked 29Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: SANRAJ REALTY

SANRAJ REALTY has 1 registration on MahaRERA, including ANTARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANTARA is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANTARA?

The registered promoter entity is SANRAJ REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANTARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANTARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANTARA?

The professionals named in the filing: Architect: RIMS DESIGN STUDIO; Engineer: G A BHILARE CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANTARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANTARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANTARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.